PLAN RECORD REVISIONS

AP- CHECK-
ISOMETRIC SCREW NO. D E S C R I P T I O N (DATE) PROVED ED
61110-1013-1
See next page

  Note:

1. This document has been prepared based on MHI’s standard philosophy and experiences, showing
M ITSUBISHI’S DRAWIN G NO.
CUSTOM ER’S DRAWING N O.

fundamental minimum requirement as boiler manufacturer. Full scope of detail function logic shall

be designed and decided by Owner, DI and DCS manufacturer.

2. Contents shall be reviewed after finalizing P&ID such as Boiler water/steam, Air and Gas, Fuel

Coal/Oil, Turbine bypass system, BFP system, Coal mill/Coal feeder system, FDF/IDF system and

so on for Goudian Taizhou Power Plant.

3. Type of drives and actuators shall be designed and decided by others.


Sec. Code 4. Interface between DCS and drives/sensors shall be checked by others after system design is
RL4 finalized.
出図先 部数
HBC 2 5. Functional description for Boiler Control System will be issued separately. See Dwg. No. 61110-
三電殿
プ技一 1021-1,2.

小林 PM A 6. For other specific notes, see respective sheets.


プ 計機 A

配 7. Auto/Manual Stations shall be provided with automatic tracking and bumpless transfer facilities.

プ 装 8. All transfer to be bumpless.
二 海淡
計 計二 S+1
電 電
火 ソ
制 機
ソ 調
計画 S+1 MITSUBISHI HEAVY INDUSTRIES, LTD
ボ 新技 CONFIDENTIAL & PROPRIETARY INFORMATION
設 保技

エ 技サ TECHNICAL INFORMATION AND TRADE SECRETS IN THIS DRAWING
ネ 燃シ S+1 OR DOCUMENT IS THE PROPERTY OF MITSUBISHI HEAVY

機 INDUSTRIES, LTD. (MHI) AND IS NOT TO BE DISCLOSED,

REPRODUCED OR COPIED IN WHOLE OR IN PART, OR USED FOR
陸 技
タ 本 THE BENEFIT OF ANYONE OTHER THAN MHI WITHOUT MHI’S
ガ PRIOR WRITTEN CONSENT.
風 力
舶 タ THIS DOCUMENT OR DRAWING IS PROTECTED BY COPYRIGHT LAW,
原 設
DESIGN REQUIREMENT
UNFAIR COMPETITION LAW, CIVIL LAW AND INTERNATIONAL
(伝)
火 計 TREATY PROVISIONS, AND ANY APPLICABLE OF JAPAN AND THE
(企) A4×2
火 計
COUNTRY IN WHICH IT IS BEING USED.
(輸)
計 電 工 A3×32 SHEET(S) WITH COVER
建 設
土 建 CONTROL & ELECTRICAL SYSTEM
生 管 ENGINEERING SECTION GUODIAN TAIZHOU POWER PLANT 2 x 1000MW COAL FIRED BOILERS
品 証
機品一
機品二 APPROVED M.Goto
本社
計制技 H.Matsunaga BOILER CONTROL FUNCTION
CHECKED Y.Muraoka LOGIC DIAGRAM
D R AW N S . K a w a zoe S . K . (BOILER PROPER)
CONFERRED SCALE ~
原輸二
菱制シ技 1 C U S TO M E R ’ S D R AW I N G NO .
ORDER ITEM REV.

計 6
07457/07458 61000 MITSUBISHI’ S DRAW ING NO. 1
61110-1013-1
MITSUBISHI HEAVY INDUSTRIES, LTD.
NA GASAKI SHIPYARD & MACHINERY WOR KS
DRAWN  Jan. 23, 2006 ISSUED
Record of Revision

07457/07458 61110-1013-
1     
Rev. DRA CHEC APPR
Date Description
No. WN KED OVED

0 Jan. 23, 2006


First issue.

Revised as per design change of Yuhuan project.


・SH.NO.1-1-4;Added the「not」gate.
1 Apr. 19, 2006
・SH.NO.1-1-5;Revised wet/dry transfer logic.

・SH.NO.1-3-1;Added the「T-2」.