Program/Course: Electrical Installation & Maintenance NC II
Unit of Competency: Perform roughing in, wiring and cabling works for single- phase distribution, power, lighting and auxiliary systems INSTRUCTIONS: This Self-Check Instrument will give the trainer necessary data or information which is essential in planning training sessions. Please check the appropriate box of your answer to the questions below. YES – Competent NO – Not yet Competent CORE COMPETENCIES CAN I…? YES NO 1. Perform roughing in, wiring and cabling works for single-phase distribution, power, lighting and auxiliary systems 1.1 Install electrical metallic /non- metallic (PVC conduit) Interpret correct drawing base on job requirements Determine correct quantities of conduit, fittings and accessories as per job requirements Select tools and equipment as per job requirements Perform assembling of conduit ensuring that fittings are fully inserted and tightened as per job requirements Perform conduit bending not exceeding 90° as per job requirements Install conduit couplings and elbows as per job requirement Check conduit is well threaded in line as per job requirements Follow safety procedures with standard operating procedures (SOPs)
1.2 Install wire ways and cable tray
Interpret correct drawings as of job requirements Select correct materials quantities as of job requirements Select tools and equipment as per job requirements Install wire ways and cable trays as per job requirements. Follow safety procedures with standard operating procedures (SOPs) CORE COMPETENCIES CAN I…? YES NO 1.3 Install auxiliary terminal cabinet and distribution panel Interpret correct drawing base on job requirements Select correct materials quantities as of job requirements Select tools and equipment as per job requirements Install Auxiliary terminal cabinet as per job requirements Install Auxiliary main distribution frame as per job requirements Follow safety procedures with standard operating procedures (SOPs) 1.4 Prepare for cable pulling and installation Prepare necessary tools, equipment, materials and personal protective equipment (PPE) in line with job requirements. Identify cable pulling & installation requirements and constraints from plan and site inspection as per job requirements. Install Cable lay out equipment is set up in accordance with manufacturer's and job requirements Install cable made safe and secure in site Select suitable protective clothing and required safety devices are used Assess support structure as safe for normal working conditions
1.5 Perform wiring and cabling lay out
Follow safety procedures based on safety regulations PPE are identified and selected in line with safety requirements Identify tools, equipment, pulling compound and safety requirements are obtained for the lay out and installation Install pulling materials properly and tensioned to required specifications Install Cable secured permanently to support structure in accordance with standard procedures Observe bending radius and loops tolerance for cable materials at all times Follow schedule of wire cutting lists based on estimates, quantity and sizes to avoid wastage Further instructions are sought if unplanned events or CORE COMPETENCIES CAN I…? YES NO conditions occur Check of quality of work is done in accordance with instructions and requirements 1.6 Notify completion of work Conform final check are made to ensure that work with instructions and job requirements Notify Supervisor upon completion of work Check Tools, equipment and any surplus resources and materials are, where appropriate, cleaned and returned to storage in accordance with established procedures Clean up work area and made safe according to OHSA regulations
What other competencies/ are do you want to learn?