G.I.

Tie Wire = 1kl = 30m


Cut Length of Tie Wire= 30cm
H
Footing 4.2
Area thk qty Vol
F1 2.25 0.35 7 5.5125

RSB (16mm) Total Length No. of Bars No. of Footing Total Bars @
(one footing) 1.5m
1.5 14 7 24.5 pcs

No. of Intersections No. of Footings 0.3m length


tie wire
Tie Wire 49 7 0.30 3.43 kgs

Tie Beam Area Total Length Vol


TB1 1.5 44 66

RSB (20mm)

Wall Footing Length height Area

WF2 26 0.7 18.2


8
10

RSB (10mm) heigth Spacing 0.6 Length no. of pcs


0.7 0.6 26 5.06 pcs
Tie Wire

Column Footing Area height qty Vol


0.1225 1.5 7 1.28625

Column Area heigth qty Vol


0.1225 4.2 7 3.6015

RSB (16mm)

Stirrups

Tie Wire

Beam Area Length Vol


RB1 0.1125 44 4.95
RSB (20mm)

Lateral Ties
Volume F1 total qty.
Cement 5.5125 8 44.1 bags
Sand 5.5125 0.5 2.76 cum
Gravel 5.5125 1 5.51 cum

Volume TB1
Cement 66 8 528 bags
Sand 66 0.5 33 cum
` Gravel 66 1 66 cum

Area WF2 total qty.


CHB 400 x 200 18.2 13 236.6 pcs
x 150 mm

Volume CF1 total qty.


Cement 1.28625 8 10.29 bags
Sand 1.28625 0.5 0.64 cum
Gravel 1.28625 1 1.29 cum

Volume C1 total qty.


Cement 3.6015 8 28.812 bags
Sand 3.6015 0.5 1.80 cum
Gravel 3.6015 1 3.60 cum

Volume RB1 total qty.


Cement 4.95 8 39.6
Sand 4.95 0.5 2.475
Gravel 4.95 1 4.95