Вы находитесь на странице: 1из 1

GEOLOGICAL WELL PROGNOSIS NGLOBO UTARA-1X (NGU-1X)

Well Name : Nglobo Utara-1X (NGU-1X) Elevasi GL : 155 m (Est.)


Well Classification : Vertical Well RKB :5m Longitude : 111° 29' 35.26" E Latitude : 7° 01' 41.38" S X : 554464 E Y : 9223109.25 S
Rig : 1000 HP Elev. RKB : 160 m (Est.) Longitude : 111° 29' 35.26" E Latitude : 7° 01' 41.38" S X : 554464 E Y : 9223109.25 S

DEPTH DRILLING HAZARD

WELL CONTROL
m TVD (RKB)
LITHOLOGY
FORMATION

m TVD (RKB)

CEMENTING
TARGET

CASING

PHASE
MUD

BIT SIZE
CASING

SURVEY
AGE

TEMP.

MUD
FORMATION EVALUATION
m SS

LOGGING (F) NGBU-02 ACTION PLAN

30" X-56,
30" Cond. Stove Pipe 309.7 ppf, R3, N/A Auger N/A N/A N/A N/A
@ 55 m BTC , ERW
LEDOK
Cement G

(96 - 102)F
20 " K55, 8 1/2" PDC Bit High K + Content and monitor Cl -,
-70 20" Csg Pilot Hole 8 1/2" Diverter Sistem , 29- WBM Single Slurry (Tail )
94 ppf, R3, TOTCO N/A Data Record: Gumbo Minimalisasi OH time,
150 -10 @ 170 m OH 26" 1/2" x 500 psi SG 1.03 - 1..06 = 1.26 SG (10ppg)
BTC, SMLS 26" RB IADC 115 Solid control harus dalam kondisi bagus
LATE MIOCENE

excess 100 % -Drilling Parameter


-Gas Acquisition (Time basis: 10
sec & Depth Basis: 1 m)
Cement G
Sampling:
WONOCOLO

BOP Stack - Washed & Dried (5 m) Saveral


Lead slurry to surface

(102 - 142) F
21 1/4" x 2K Cased Hole Logging (2 sets @ quantity: 100 gr) sloughing
13 3/8 " K55, = 1.32 SG (11 ppg)
17 1/2" PDC IADC WBM MWD Mud Minimize OH time,
OH 17-1/2" 61 ppf, R3, 1. GR-CBL-CCL-VDL shale ,
Annular M422 SG 1.06 - 1.08 Motor - Wet & unwashed (5 m) terdapat kemungkinan over pressure
BTC, SMLS Tail slurry to 300 m 2. VSP (Run After set casing 7") parsial loss ,
Double ram (4 sets @ quantity: 250 gr) reservoir air asin
= 1.65 SG (13.8 ppg)
swelling
Excess 100 %

13 3/8" Csg
790 630 @ 800 m
NGRAYONG

A. Open Hole Logging Data Record:


Wireline -Drilling Parameter
MIDDLE MIOCENE

Cement G 1. SP-GR-SGR-RES-MSFL-DEN-NEU-PEF-CAL -Gas Acquisition (Time basis: 10


900 2. Resistivity Image Log + Anisotrophy Dipole Sonic sec & Depth Basis: 1 m)
Annular Minimize OH time,
Secondary Target (Appraisal)

1070 910 Lead slurry to surface 3. Nuclear Magnetic Resonance Log Saveral

(142 - 186) F
9 5/8" N-80, 13 5/8" - 10K Maintain solid control,
TAWUN

= 1.62 SG (13.5 ppg) Sampling:


43.5 ppf, R3, 12-1/4" PDC IADC HPWBM MWD Mud 4. Formation Fluid Tester (Sample Test: 25 points) sloughing Used gas block add,
OH 12-1/4" - Washed & Dried (1 - 2 m)
SMLS, Premium Annular M422 SG 1.05 - 1.31 Motor 5. Mechanical Rotaty Sidewall Core (20ea/1Run) shale , Preparation material mud LCM,
Tail slurry to 1,000 m (2 sets @ quantity: 100 gr)
Conn Double Ram swelling terdapat kemungkinan over pressure
= 1.89 SG (15.8 ppg)
Single Ram reservoir air asin
B. Cased Hole Logging - Wet & unwashed (1 - 2 m)
Excess 100 % 1. GR-CCL-CBL-VDL (4 sets @ quantity: 250 gr)
2. VSP (Run After set casing 7")
1430 1270 3. DST (Run after set casing 7")
M0
1500 1340 9 5/8" Csg
L.TAWUN

@ 1515 m

A. LWD-MWD
1660
Exploration Primary Target 1. GR-RES-DEN-NEU-PEF-CAL-SONIC Data Record:
-Drilling Parameter
Exploration Tertiary Target B. Open Hole Logging -Gas Acquisition (Time basis: 10
EARLY MIOCENE

TUBAN Cement G Wireline sec & Depth Basis: 1 m)


Annular 8-1/2" PDC Minimize OH time,
Top Cemen to TOL 1. Resistivity Image Log + Anisotrophy Dipole Sonic Saveral

(186 - 216) F
7" N-80, 13 5/8" - 10K IADC M422 Maintain solid control,
MM Sampling:
7" Liner Csg 26 PPF, R3, HPWBM 2. Nuclear Magnetic Resonance Log + SGR sloughing estimasi terdapat over pressure
OH 8 1/2" MWD Single Slurry (Tail) - Washed & Dried (1 - 2 m)
1840 2000 @ 2000 m BTC, SMLS + Annular Contigency : SG 1.42- 1.62 3. Formation Fluid Tester (Sample Test: 25 points) shale , Used gas block add,
TD : 2000 mTVD LWD = 1.89 SG (15.8 ppg) (2 sets @ quantity: 100 gr)
LINER Hanger Double Ram 8-1/2" PDC 4. Mechanical Rotaty Sidewall Core (20ea/1Run) swelling Preparation material mud LCM,
Single Ram IADC 437 Kemungkinan OP dari Reservoir HC
Excess 100 % - Wet & unwashed (1 - 2 m)
C. Cased Hole Logging (4 sets @ quantity: 250 gr)
1. GR-CCL-CBL-VDL
- Geochemical (±70 samples)
2. VSP (Run after set casing 7")
3. DST (Run after set casing 7")

Вам также может понравиться