Вы находитесь на странице: 1из 8

SCHEDULE MAINTENA

FACILITIES EQUIPMENT UNIT PERTAMINA EP SANG


TAHUN 2017
#REF!

Bulan Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17


LOKASI KETERANGAN
Minggu I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV

1 POMPA
a Triplex Pump A Milton Roy, Elmot ABB
- Change Oil Machine
- Change bearing Pompa
Unit Set
- Change bearing Elmot
- Change Mechanical Seal
- Check visual Noise and Performance Pump
b Triplex Pump B Milton Roy, Elmot ABB
- Change Oil Machine
- Change bearing Pompa
SBR OIL PLANT

Unit Set
- Change bearing Elmot
- Change Mechanical Seal
- Check visual Noise and Performance Pump
c Pompa Transfer Sterling, Elmot Baldor
- Greasing Elmot
- Replace Bearing Elmot
- Replace Oil Transfer Pump Unit Set
- Replace Mechanical seal Transfer Pump
- Replace Rubber Coupling Pump & Elmot
- General Visual Checklist
d Pompa Transfer Mission, Elmot
- Greasing Elmot
- Replace Bearing Elmot
- Replace Oil Transfer Pump Unit Set
- Replace Mechanical seal Transfer Pump
- Replace Rubber Coupling Pump & Elmot
- General Visual Checklist
1. TANGKI
a Tangki Solar, Cap 6000 Ltrs Unit
- Tank Cleaning
- Wall Thickness Inspection
- Grounding System Inspection
- General Visual Checklist
b Tangki Solar, Cap 5000 Ltrs Unit
- Tank Cleaning
- Wall Thickness Inspection
- Grounding System Inspection
- General Visual Checklist
c Tangki Solar, Cap 5000 Ltrs Unit
- Tank Cleaning
- Wall Thickness Inspection
- Grounding System Inspection
- General Visual Checklist
d Tangki Produksi (ATM ) Cap, 60 bbl Unit
- Tank Cleaning
- Wall Thickness Inspection
- Grounding System Inspection
- General Visual Checklist
e. Tangki TOS Cap. 30 M3 Unit
- Tank Cleaning
- Wall Thickness Inspection
- Grounding System Inspection
- General Visual Checklist
2. PRESSURE VESSEL
a KO Drum, Cap Unit
- Tank Cleaning
- Wall Thickness Inspection
- Grounding System Inspection
- General Visual Checklist
3. POMPA
a Pompa Transfer A
- Greasing Elmot
- Replace Bearing Elmot
- Replace Oil Transfer Pump Unit Set
- Replace Mechanical seal Transfer Pump
- Replace Rubber Coupling Pump & Elmot
- General Visual Checklist
Bulan Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
LOKASI KETERANGAN
Minggu I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV
b Pompa Transfer B
- Greasing Elmot
- Replace Bearing Elmot
- Replace Oil Transfer Pump Unit Set
- Replace Mechanical seal Transfer Pump
- Replace Rubber Coupling Pump & Elmot
- General Visual Checklist
c Pompa Portable
- Replace Oil Machine
Unit Set
- Replace Mechanical seal
- General Visual Checklist
d Pompa Produksi ( SRP )
- Greasing All Position Bearing Pumping
- Replace Bearing Pumping Unit Set
- Check Thickness Kampas Rem
- Replace Bearing Pulley Pumping
e Pompa Produksi ( SRP )
- Greasing All Position Bearing Pumping
- Replace Bearing Pumping Unit Set
- Check Thickness Kampas Rem
- Replace Bearing Pulley Pumping
f Pompa Produksi ( SRP )
- Greasing All Position Bearing Pumping
- Replace Bearing Pumping Unit Set
- Check Thickness Kampas Rem
- Replace Bearing Pulley Pumping
4. MESIN GENERATOR
a Genset DOSSAN, Gas Engine Cap 125 KVA
- Replace Oil Machine
- Replace Filter Oil
- Replace Air Filter
Unit Set
- Replace Spark Plug
- Replace Water Coolant
- Note Parameter Engine & Electric
- General Visual Checklist
b Genset Caterpillar, Diesel Engine Cap 415 KVA
- Replace Oil Machine
- Replace Filter Oil
- Replace Air Filter
Unit Set
- Replace Spark Plug
AREA SUMUR SEMBERAH

- Replace Water Coolant


- Note Parameter Engine & Electric
- General Visual Checklist
c Premover SRV, Gas Engine SBR 06
- Replace Oil Machine
- Replace Filter Oil
- Replace Air Filter
Unit Set
- Replace Spark Plug
- Replace Water Coolant
- Note Parameter Engine & Electric
- General Visual Checklist
d Premover SRV, Gas Engine SBR 05
- Replace Oil Machine
- Replace Filter Oil
- Replace Air Filter
Unit Set
- Replace Spark Plug
- Replace Water Coolant
- Note Parameter Engine & Electric
- General Visual Checklist
e Premover SRV, Gas Engine SBR 17
- Replace Oil Machine
- Replace Filter Oil
- Replace Air Filter
Unit Set
- Replace Spark Plug
- Replace Water Coolant
- Note Parameter Engine & Electric
- General Visual Checklist
f Premover SRV, Gas Engine SBR 12
- Replace Oil Machine
- Replace Filter Oil
- Replace Air Filter
Unit Set
- Replace Spark Plug
- Replace Water Coolant
- Note Parameter Engine & Electric
- General Visual Checklist
Bulan Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
LOKASI KETERANGAN
Minggu I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV
g Premover SRV, Gas Engine SBR 15
- Replace Oil Machine
- Replace Filter Oil
- Replace Air Filter
Unit Set
- Replace Spark Plug
- Replace Water Coolant
- Note Parameter Engine & Electric
- General Visual Checklist
5. FLOWLINE
a Flowline Sumur SBR01
- Monitoring Inspection Wall Thickness Pipe
- Monitoring Inspection Visual Check Condition Pipe
b Flowline Sumur SBR03
- Monitoring Inspection Wall Thickness Pipe
- Monitoring Inspection Visual Check Condition Pipe
c Flowline Sumur SBR04
- Monitoring Inspection Wall Thickness Pipe
- Monitoring Inspection Visual Check Condition Pipe
d Flowline Sumur SBR05
- Monitoring Inspection Wall Thickness Pipe
- Monitoring Inspection Visual Check Condition Pipe
e Flowline Sumur SBR 06
- Monitoring Inspection Wall Thickness Pipe
- Monitoring Inspection Visual Check Condition Pipe
f Flowline Sumur SBR 07
- Monitoring Inspection Wall Thickness Pipe
- Monitoring Inspection Visual Check Condition Pipe
g Flowline Sumur SBR 08
- Monitoring Inspection Wall Thickness Pipe
- Monitoring Inspection Visual Check Condition Pipe
h Flowline Sumur SBR 12
- Monitoring Inspection Wall Thickness Pipe
- Monitoring Inspection Visual Check Condition Pipe
i Flowline Sumur SBR 15
- Monitoring Inspection Wall Thickness Pipe
- Monitoring Inspection Visual Check Condition Pipe
j Flowline Sumur SBR 16
- Monitoring Inspection Wall Thickness Pipe
- Monitoring Inspection Visual Check Condition Pipe
k Flowline Sumur SBR 17
- Monitoring Inspection Wall Thickness Pipe
- Monitoring Inspection Visual Check Condition Pipe
l Flowline Sumur SBR 18
- Monitoring Inspection Wall Thickness Pipe
- Monitoring Inspection Visual Check Condition Pipe
m Flowline Sumur SBR 19
- Monitoring Inspection Wall Thickness Pipe
- Monitoring Inspection Visual Check Condition Pipe
n Flowline Sumur SBR 20
- Monitoring Inspection Wall Thickness Pipe
- Monitoring Inspection Visual Check Condition Pipe
o Flowline Sumur SBR 22
- Monitoring Inspection Wall Thickness Pipe
- Monitoring Inspection Visual Check Condition Pipe
p Flowline Transfer Pump- ATM Tank
- Monitoring Inspection Wall Thickness Pipe
- Monitoring Inspection Visual Check Condition Pipe

1. TANGKI
a Oil Storage Tank 60 bbl Unit
- Tank Cleaning
- Wall Thickness Inspection
- Grounding System Inspection
- General Visual Checklist
b Oil Storage Tank 30 bbl Unit
- Tank Cleaning
- Wall Thickness Inspection
- Grounding System Inspection
- General Visual Checklist
2. PRESSURE VESSEL
a Scrubber (Vertical Separator ) Oil Unit Set
- Tank Cleaning
MBUTAN

- Wall Thickness Inspection


- Grounding System Inspection
- General Visual Checklist
AREA SUMUR SAMBUTAN
Bulan Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
LOKASI KETERANGAN
Minggu I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV
3. MESIN GENERATOR
a Gas Engine Generator 3000 wat Unit Set
4. MANIFOLD / HEADER
a Test Manifold / header Set
- Check Instrument
- Wall Thickness Inspection
- Grounding System Inspection
- General Visual Checklist
5. Pig Louncher
a PIG LAUNCHER Set
- Check Instrument
- Wall Thickness Inspection
- Grounding System Inspection
- General Visual Checklist
6. FLOWLINE DAN PIPELINE
a Flowline Sumur SBT01 Ea
- Monitoring Inspection Wall Thickness Pipe
- Monitoring Inspection Visual Check Condition Pipe
b Flowline Sumur SBT02A Ea
- Monitoring Inspection Wall Thickness Pipe
- Monitoring Inspection Visual Check Condition Pipe
c Flowline Sumur SBT06 Ea
- Monitoring Inspection Wall Thickness Pipe
- Monitoring Inspection Visual Check Condition Pipe

1. TANGKI
a Condensate Tank 01 Unit Set
-
-
-

b Condensate Tank 02 Unit Set


-
-
-

2. PRESSURE VESSEL
METERING TANJUNG BATU

a Gas Scrubber Unit Set

b. Vertikal Air Reciever Unit Set

c. Gas Filter Unit Set

d. Gas Flare Unit Set

3. Metering

4. PIG Reciever

a. Pipeline SBT - BIN, 13 km


TRANSMISSIO

- Monitor Visual Check Underground Pipeline


- Monitor Visual Check Above Pipeline
N LINE

- Monitor Visual Check Crossing Pipeline


b. Pipeline BIN - TG. BATU, 22,3 km
- Monitor Visual Check Underground Pipeline
- Monitor Visual Check Above Pipeline
- Monitor Visual Check Crossing Pipeline
MAINTENANCE
NA EP SANGATTA FIELD, SEMBERAH AREA
N 2017

Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17


KETERANGAN
I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV

Oil Plant
By Mechanic & Kru
By Mechanic & Kru
By Mechanic & Kru
By Mechanic & Kru
By Mechanic & Kru
Oil Plant
By Mechanic & Kru
By Mechanic & Kru
By Mechanic & Kru
By Mechanic & Kru
By Mechanic & Kru
Oil Plant
By Mechanic & Kru
By Mechanic & Kru
By Mechanic & Kru
By Mechanic & Kru
By Mechanic & Kru
By Mechanic & Kru
Oil Plant
By Mechanic & Kru
By Mechanic & Kru
By Mechanic & Kru
By Mechanic & Kru
By Mechanic & Kru
By Mechanic & Kru

SBR20 Area

By Teknisi Elektrik

SBR15 Area

By Teknisi Elektrik

Semberah Camp

By Teknisi Elektrik

Semberah 20 Area

By Teknisi Elektrik

Semberah 08 Area

By Teknisi Elektrik

SBR08 Area (PPD)

ATM Tank
By Mechanik
By Mechanik
By Mechanik
By Mechanik
By Mechanik
Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17
KETERANGAN
I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV
ATM Tank
By Mechanik
By Mechanik
By Mechanik
By Mechanik
By Mechanik

SBR20 Camp
By Mechanik
By Mechanik
By Mechanik
Sumur SBR5
By Mechanik
By Mechanik
By Mechanik
By Mechanik
Sumur SBR6
By Mechanik
By Mechanik
By Mechanik
By Mechanik
Sumur SBR17
By Mechanik
By Mechanik
By Mechanik
By Mechanik

Area Camp Opretaor Semberah


By Mechanik
By Mechanik
By Mechanik
By Mechanik
By Mechanik
By Mechanik, Supervisor
By Mechanik, Supervisor
Area Camp Operator Semberah
By Mechanik
By Mechanik
By Mechanik
By Mechanik
By Mechanik
By Mechanik, Supervisor
By Mechanik, Supervisor
Sumur SBR5
By Mechanik
By Mechanik
By Mechanik
By Mechanik
By Mechanik
By Mechanik, Supervisor
By Mechanik, Supervisor
Sumur SBR6
By Mechanik
By Mechanik
By Mechanik
By Mechanik
By Mechanik
By Mechanik, Supervisor
By Mechanik, Supervisor
Sumur SBR17
By Mechanik
By Mechanik
By Mechanik
By Mechanik
By Mechanik
By Mechanik, Supervisor
By Mechanik, Supervisor
Sumur SBR16
By Mechanik
By Mechanik
By Mechanik
By Mechanik
By Mechanik
By Mechanik, Supervisor
By Mechanik, Supervisor
Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17
KETERANGAN
I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV
Sumur SBR16
By Mechanik
By Mechanik
By Mechanik
By Mechanik
By Mechanik
By Mechanik, Supervisor
By Mechanik, Supervisor

Sumur - Plant
Inspection Request to HSE
Inspection Request to HSE
Sumur - Plant
Inspection Request to HSE
Inspection Request to HSE
Sumur - Plant
Inspection Request to HSE
Inspection Request to HSE
Sumur - Plant
Inspection Request to HSE
Inspection Request to HSE
Sumur - Plant
Inspection Request to HSE
Inspection Request to HSE
Sumur - Plant
Inspection Request to HSE
Inspection Request to HSE
Sumur - ATM Tank - Plant
Inspection Request to HSE
Inspection Request to HSE
Sumur - Plant
Inspection Request to HSE
Inspection Request to HSE
Sumur - Plant
Inspection Request to HSE
Inspection Request to HSE
Sumur - Plant
Inspection Request to HSE
Inspection Request to HSE
Sumur - Plant
Inspection Request to HSE
Inspection Request to HSE
Sumur - Plant
Inspection Request to HSE
Inspection Request to HSE
Sumur - Plant
Inspection Request to HSE
Inspection Request to HSE
Sumur - Plant
Inspection Request to HSE
Inspection Request to HSE
Sumur - ATM Tank - Plant
Inspection Request to HSE
Inspection Request to HSE
ATM Tank - Plant
Inspection Request to HSE
Inspection Request to HSE

SBT Oil Plant

Oil Plant (Lubrisindo)

Area sumur SBT2A (PPD)


Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17
KETERANGAN
I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV

Area SBT Oil Plant (PPD)

Area SBT Gas Plant

Area SBT Gas Plant (PPD)

Sumur - Manifold / Header

Sumur - Scrubber (Vertical Separator ) Oil

Sumur - Manifold / Header

Inspection Request to HSE


Inspection Request to HSE
Inspection Request to HSE

Inspection Request to HSE


Inspection Request to HSE
Inspection Request to HSE