Вы находитесь на странице: 1из 7

29/08/2015 SCAN REPORT OF

SINHA FABRICS LTD.


K96/1/D, Pragati Sarani (Kuril), Joar Shahara, Dhaka
Cantonment, Dhaka 1229, Bangladesh

GRIHAYAN RIT CONSORTIUM


SHYAMOLI, DHAKA – 1207.
15/A (GF), Holylane, Shyamoli,
GRIHAYAN RIT CONSORTIUM Dhaka – 1207, Bangladesh

Project: SINHA FABRICS LTD


Test: Ferroscan
Level- Basement Floor
TEST REPORT

Sl no. Location Size Spot/ Site ID Number of Bars Detected

X dir. Y dir.
1 COLUMN (C-01) 15”X15” GRID-B5 3 3

Histogram of Bars:

X direction

Y direction

Page | 1
15/A (GF), Holylane, Shyamoli,
GRIHAYAN RIT CONSORTIUM Dhaka – 1207, Bangladesh

Project: SINHA FABRICS LTD


Test: Ferroscan
Level-1st floor
TEST REPORT

Sl no. Location Size Spot/ Site ID Number of Bars Detected

X dir. Y dir.
2 COLUMN (C-01) 15” x 15” GRID-C3 3 3

Histogram of Bars:

X direction

Y direction
Page | 2
15/A (GF), Holylane, Shyamoli,
GRIHAYAN RIT CONSORTIUM Dhaka – 1207, Bangladesh

Project: SINHA FABRICS LTD


Test: Ferroscan
Level- 3RD FLOOR
TEST REPORT

Sl no. Location Size Spot/ Site ID Number of Bars Detected

X dir. Y dir.
3 COLUMN (C-01) 15” x 15” GRID- B5 3 3

Histogram of Bars:

X direction

Y direction

Page | 3
15/A (GF), Holylane, Shyamoli,
GRIHAYAN RIT CONSORTIUM Dhaka – 1207, Bangladesh

Project: SINHA FABRICS LTD


Test: Ferroscan
Level- GROUND FLOOR
TEST REPORT

Sl no. Location Size Spot/ Site ID Number of Bars Detected

X dir. Y dir.
4 COLUMN (C-01) 10” x 10” GRID- B3 2 2

Histogram of Bars:

X direction

Y direction
Page | 4
15/A (GF), Holylane, Shyamoli,
GRIHAYAN RIT CONSORTIUM Dhaka – 1207, Bangladesh

Project: SINHA FABRICS LTD


Test: Ferro-scan Test
Level-1st floor
TEST REPORT

Sl no. Location Size Spot/ Site ID Number of Bars Detected

BEAM Bottom Spacing


5 12” x 20” GRID-3A-3B
FB-01 3 7” c/c

Histogram of Bars:

Main Rod at Bottom

Tie Spacing

Page | 5
15/A (GF), Holylane, Shyamoli,
GRIHAYAN RIT CONSORTIUM Dhaka – 1207, Bangladesh

Project: SINHA FABRICS LTD


Test: Ferroscan
Level - 2nd FLOOR
TEST REPORT

Sl no. Location Spot/ Site ID Number of Bars Detected

Direction Spacing
6 SLAB GRID-F, G & 4, 5 N-S 5” c/c
E-W 5” c/c

Histogram of Bars:

Page | 6