L12

R2 Wl=17.3 T-678
Pi=157 Wv=0 P=139
FW Tank Po=157 Pi=157
P=0 Po=139
V=3.3
dP/L=0.6
D=3"
L7 L=20

L1 Wl=17.3
Wv=0
Wl=98.5 Pi=157
Wv=0 Po=157
Pi=0.555 V=0.84
Po=0.661 dP/L=0.0
V=4.82 D=6"
dP/L=0.5 L=90
D=6"
L2 L6
L=17
Wl=98.5 T1 Wl=22.7 T3
P1 Wv=0 P1=157 Wv=0 P1=157 Gantry
Pi=0.661 Pi=159 P2=157 Pi=157 P2=157 P=150
Po=159 Po=157 P3=157 Po=157 P3=157
V=4.82 V=1.11
dP/L=0.5 dP/L=0.0
D=6" D=6"
L=80 L=70

L8
Wl=5.4
L11 Wv=0
Wl=75.8 Pi=157
Wv=0 Po=157
Pi=157 V=0.26
Po=154 dP/L=0.0
V=3.71 D=6"
dP/L=0.3 L=70
D=6"
L=200 L9
R3 Wl=5.4 Shed
Pi=157 Wv=0 P=157
Po=157 Pi=157
Po=157
V=0.6
dP/L=0.0
R3
D=4"
Pi=154
L=60
Po=154

L5
Wl=75.8
Wv=0
Pi=154
Po=150
V=8.42
dP/L=2.6
D=4"
L=25

PETROCHEMICAL ENGINEERING CONSULTANTS


Karachi-Pakistan
Hydraulic Simulation: Loading Gantry Pool Fire
Technical Audit of Existing Fire Fighting System
at Bulawayo Depot
Vivo Energy - Zimbabwe
Eng Chkd Apvd Date Project Rev
Korf File Loading Gantry Pool Fire.dat Units Custom;W=t/h; P=psig; L=m; dP/L=psi/100ft; v=ft/s SMR MZK SMS 16-09-2019 2901-001 0
======================================================================================================================================================
Hydraulic Simulation: Loading Gantry Poo This information is confidential, and shall Page: 1
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
GENERAL Date: 16-09-2019
======================================================================================================================================================

Current file name = C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Loading Gantry Pool Fire.dat

Defaults : Compressible = Isothermal


Two phase flow = Homogeneous
Acceleration = Inverse
Elevation den = Homogeneous
Dukler hold-up = Dukler
Atmospheric pres = 14.696 psi abs

To view/print : Font = Courier, Size 7-8


Orientation = Landscape
Margins = 1-2 cm.

Run message = Problem solution reached after 15 iterations.

NOTE - Close before running and viewing next results.

======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Loading Gantry Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Loading Gantry Poo This information is confidential, and shall Page: 2
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
PRESSURE PROFILE REPORT Date: 16-09-2019
======================================================================================================================================================

Circuit Feed 1
-----------------
Number Description Flow Density Visc Dia Sch Length dP/L Velocity Elev dPelev dPin-out Pin Pout
t/h kg/m3 cP in m psi/100ft ft/s m psi psi psig psig
FW Tank Feed to Unit 0.6 0.711 -0.555 0 0.5551
L1 Pipe 98.52 1,000 1.0 6 40 17.0 0.54 4.82 0.854 -0.106 0.5551 0.661
P1 Pump 0 -158 0.661 158.8
L2 Pipe 98.52 1,000 1.0 6 40 80.0 0.54 4.82 0 2.13 158.8 156.7
T1 Tee piece 0 156.7

Circuit T-Piece 1 : 2
-------------------------
Number Description Flow Density Visc Dia Sch Length dP/L Velocity Elev dPelev dPin-out Pin Pout
t/h kg/m3 cP in m psi/100ft ft/s m psi psi psig psig
T1 Tee piece 0 156.5
L11 Pipe 75.84 1,000 1.0 6 40 200 0.33 3.71 0 2.4 156.5 154.1
R3 Expander/Reducer K = 1.44 0 0.518 154.1 153.6
L5 Pipe 75.84 1,000 1.0 4 40 25.0 2.57 8.42 0 3.55 153.6 150.0
Gantry Product from Unit 0 0 0 150.0 150.0

Circuit T-Piece 1 : 3
-------------------------
Number Description Flow Density Visc Dia Sch Length dP/L Velocity Elev dPelev dPin-out Pin Pout
t/h kg/m3 cP in m psi/100ft ft/s m psi psi psig psig
T1 Tee piece 0 156.8
L6 Pipe 22.68 1,000 1.0 6 40 70.0 0.0356 1.11 0 0.0917 156.8 156.7
T3 Tee piece 0 156.7

Circuit T-Piece 2 : 1
-------------------------
Number Description Flow Density Visc Dia Sch Length dP/L Velocity Elev dPelev dPin-out Pin Pout
t/h kg/m3 cP in m psi/100ft ft/s m psi psi psig psig
T3 Tee piece 0 156.7
L7 Pipe 17.28 1,000 1.0 6 40 90.0 0.0218 0.845 0 0.0764 156.7 156.6
R2 Expander/Reducer K = 5.68 0 0.0959 156.6 156.5
L12 Pipe 17.28 1,000 1.0 3 40 20.0 0.613 3.3 -17.1 17.5 156.5 139.0
T-678 Product from Unit 12 0 0 139.0 139.0

Circuit T-Piece 2 : 3
-------------------------
Number Description Flow Density Visc Dia Sch Length dP/L Velocity Elev dPelev dPin-out Pin Pout
t/h kg/m3 cP in m psi/100ft ft/s m psi psi psig psig
T3 Tee piece 0 156.7
L8 Pipe 5.40 1,000 1.0 6 40 70.0 0.00276 0.264 0 0.00667 156.7 156.7
R3 Expander/Reducer K = 1.44 0 0.00263 156.7 156.7
L9 Pipe 5.40 1,000 1.0 4 40 60.0 0.0196 0.599 0 0.0421 156.7 156.6
Shed Product from Unit 0 0 0 156.6 156.6
======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Loading Gantry Pool Fire.dat
======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Loading Gantry Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Loading Gantry Poo This information is confidential, and shall Page: 4
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
PRESSURE PROFILE REPORT Date: 16-09-2019
======================================================================================================================================================

NOTES - (1) dPElev and dPin-out represent DRAWING Inlet - Outlet.


(2) dPfrictional + dPaccel = dPElev + dPin-out.
(3) Vessel/Tank dPElev represent effect of fluid levels inside vessel.
(4) Elev represent equipment or nozzle (vessel/tank) elevation.

======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Loading Gantry Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Loading Gantry Poo This information is confidential, and shall Page: 5
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
PIPE LINE REPORT Date: 16-09-2019
======================================================================================================================================================

-----------------------------------------------------------------------------------------------------------------------------------------------------
Line number | L1 | L2 | L11 | L5
Line name | Pipe | Pipe | Pipe | Pipe
-----------------------------------------------------------------------------------------------------------------------------------------------------
PROCESS DATA | AVG IN OUT | AVG IN OUT | AVG IN OUT | AVG IN OUT
Temperature C | 25.0 25.0 25.0 | 25.0 25.0 25.0 | 25.0 25.0 25.0 | 25.0 25.0 25.0
Pressure psig | 0.608 0.5551 0.661 | 157.7 158.8 156.7 | 155.3 156.5 154.1 | 151.8 153.6 150.0
Liq Fraction wt | 1.0 1.0 1.0 | 1.0 1.0 1.0 | 1.0 1.0 1.0 | 1.0 1.0 1.0
Total-Flow t/h | 98.52 | 98.52 | 75.84 | 75.84
Dens-NS kg/m3 | 1,000 1,000 1,000 | 1,000 1,000 1,000 | 1,000 1,000 1,000 | 1,000 1,000 1,000
Elev kg/m3 | 1,000 | 1,000 | 1,000 | 1,000
Visc-NS cP | 1.0 | 1.0 | 1.0 | 1.0
Vapor-Flow t/h | 0 | 0 | 0 | 0
Density kg/m3 | 1.19 | 13.4 | 13.2 | 13.0
Visc cP | 0.010 | 0.010 | 0.010 | 0.010
Mol wt | 28.0 | 28.0 | 28.0 | 28.0
Z | 1.0 | 1.0 | 1.0 | 1.0
Cp/Cv | 1.4 | 1.4 | 1.4 | 1.4
Liquid-Flow (wt) t/h | 98.52 | 98.52 | 75.84 | 75.84
Flow (vol) m3/h | 98.52 | 98.52 | 75.84 | 75.84
Density kg/m3 | 1,000 | 1,000 | 1,000 | 1,000
Visc cP | 1.0 | 1.0 | 1.0 | 1.0
PIPE DATA | | | |
Size in | 6 | 6 | 6 | 4
Length m | 17.0 | 80.0 | 200 | 25.0
Schedule | 40 | 40 | 40 | 40
ID mm | 154 | 154 | 154 | 102
Roughness (E-3) mm | 45.7 | 45.7 | 45.7 | 45.7
Safety factor | 1.0 | 1.0 | 1.0 | 1.0
Sum of elev's m | 0 | 0 | 0 | 0
VELOCITY | | | |
Velocity ft/s | 4.82 4.82 4.82 | 4.82 4.82 4.82 | 3.71 3.71 3.71 | 8.42 8.42 8.42
Sonic-Vapor adia ft/s | 1,155 | 1,155 | 1,155 | 1,155
Vapor isoT ft/s | 976 | 976 | 976 | 976
PRESSURE DROP (In-Out) | | | |
Overall psi | -0.1059 | 2.129 | 2.396 | 3.554
Friction psi | 0.7478 | 2.129 | 2.396 | 3.554
Accel'n psi | 0 | 0 | 0 | 0
Static psi | -0.8537 | 0 | 0 | 0
dP/Length psi/100ft | 0.54 | 0.54 | 0.33 | 2.57
LINE SIZING | MAX/LARGER MIN/SMALLER | MAX/LARGER MIN/SMALLER | MAX/LARGER MIN/SMALLER | MAX/LARGER MIN/SMALLER
dP/Length psi/100ft | 0.999 | 0.999 | 0.999 | 0.999
Velocity ft/s | 328 0.984 | 328 0.984 | 328 0.984 | 328 0.984
VelCoef ft/s | 12.4 1.04 | 12.4 1.04 | 12.4 1.04 | 12.4 1.04
Size-Larger/Small in | 8 4 | 8 4 | 8 4 | 6 3
dP/Length psi/100ft | 0.138 4.26 | 0.138 4.26 | 0.085 2.57 | 0.33 10.2
Velocity ft/s | 2.78 10.9 | 2.78 10.9 | 2.14 8.42 | 3.71 14.5

======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Loading Gantry Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Loading Gantry Poo This information is confidential, and shall Page: 6
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
PIPE LINE REPORT Date: 16-09-2019
======================================================================================================================================================

-----------------------------------------------------------------------------------------------------------------------------------------------------
Line number | L1 | L2 | L11 | L5
Line name | Pipe | Pipe | Pipe | Pipe
-----------------------------------------------------------------------------------------------------------------------------------------------------
LIQUID HOLDUP | | | |
Liquid Fraction (vol) | 1.0 | 1.0 | 1.0 | 1.0
Liquid Holdup(dP) (vol) | 1.0 | 1.0 | 1.0 | 1.0
2-PHASE METHOD | Homogeneous | Homogeneous | Homogeneous | Homogeneous
FLOW REGIME | | | |
Horizontal | - | - | - | -
Vertical-Up | - | - | - | -
Vertical-Down | - | - | - | -
HOMOGENEOUS/DUKLER | | | |
Reynolds No | 226,195 | 226,195 | 174,128 | 262,317
Friction factor | 0.01745 | 0.01745 | 0.0180 | 0.0181
Friction factor (turb) | 0.01489 | 0.01489 | 0.01489 | 0.01627
Dukler-2phase factor | 1.00 | 1.00 | 1.00 | 1.00
density kg/m3 | 0 | 0 | 0 | 0
LOCKHART-M/CHENOWETH-M | | | |
Liquid-Re | 0 | 0 | 0 | 0
f | 0 | 0 | 0 | 0
Psi/Psi^2 | 0 | 0 | 0 | 0
Vapor-Re | 0 | 0 | 0 | 0
f | 0 | 0 | 0 | 0
Psi^2 | 0 | 0 | 0 | 0
X factor | 0 | 0 | 0 | 0
FITTINGS | TYPE No L/D K | TYPE No L/D K | TYPE No L/D K | TYPE No L/D K
| Entrance 0 0 0.5 | Entrance 0 0 0.5 | Entrance 0 0 0.5 | Entrance 0 0 0.5
| Exit 0 0 1 | Exit 0 0 1 | Exit 0 0 1 | Exit 0 0 1
| Gate valve 4 8 0 | Gate valve 2 8 0 | Gate valve 1 8 0 | Gate valve 2 8 0
| Globe valv 0 340 0 | Globe valv 0 340 0 | Globe valv 0 340 0 | Globe valv 0 340 0
| Check 0 50 0 | Check 1 50 0 | Check 0 50 0 | Check 1 50 0
| Stop-check 0 400 0 | Stop-check 0 400 0 | Stop-check 0 400 0 | Stop-check 0 400 0
| Elbow 6 20 0 | Elbow 8 20 0 | Elbow 5 20 0 | Elbow 5 20 0
| 180 Bend 0 50 0 | 180 Bend 0 50 0 | 180 Bend 0 50 0 | 180 Bend 0 50 0
| T-Straight 2 20 0 | T-Straight 4 20 0 | T-Straight 3 20 0 | T-Straight 1 20 0
| T-Branch 0 60 0 | T-Branch 0 60 0 | T-Branch 0 60 0 | T-Branch 0 60 0
| Other 0 0 | Other 0 0 | Other 0 0 | Other 0 0
Total K | 0 | 0 | 0 | 0
Total L/D | 192 | 306 | 168 | 186
Equiv Length m | 42.2 | 120 | 221 | 42.1

======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Loading Gantry Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Loading Gantry Poo This information is confidential, and shall Page: 7
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
PIPE LINE REPORT Date: 16-09-2019
======================================================================================================================================================

-----------------------------------------------------------------------------------------------------------------------------------------------------
Line number | L6 | L7 | L12 | L8
Line name | Pipe | Pipe | Pipe | Pipe
-----------------------------------------------------------------------------------------------------------------------------------------------------
PROCESS DATA | AVG IN OUT | AVG IN OUT | AVG IN OUT | AVG IN OUT
Temperature C | 25.0 25.0 25.0 | 25.0 25.0 25.0 | 25.0 25.0 25.0 | 25.0 25.0 25.0
Pressure psig | 156.7 156.8 156.7 | 156.6 156.7 156.6 | 147.8 156.5 139.0 | 156.7 156.7 156.7
Liq Fraction wt | 1.0 1.0 1.0 | 1.0 1.0 1.0 | 1.0 1.0 1.0 | 1.0 1.0 1.0
Total-Flow t/h | 22.68 | 17.28 | 17.28 | 5.40
Dens-NS kg/m3 | 1,000 1,000 1,000 | 1,000 1,000 1,000 | 1,000 1,000 1,000 | 1,000 1,000 1,000
Elev kg/m3 | 1,000 | 1,000 | 1,000 | 1,000
Visc-NS cP | 1.0 | 1.0 | 1.0 | 1.0
Vapor-Flow t/h | 0 | 0 | 0 | 0
Density kg/m3 | 13.4 | 13.3 | 12.7 | 13.3
Visc cP | 0.010 | 0.010 | 0.010 | 0.010
Mol wt | 28.0 | 28.0 | 28.0 | 28.0
Z | 1.0 | 1.0 | 1.0 | 1.0
Cp/Cv | 1.4 | 1.4 | 1.4 | 1.4
Liquid-Flow (wt) t/h | 22.68 | 17.28 | 17.28 | 5.40
Flow (vol) m3/h | 22.68 | 17.28 | 17.28 | 5.40
Density kg/m3 | 1,000 | 1,000 | 1,000 | 1,000
Visc cP | 1.0 | 1.0 | 1.0 | 1.0
PIPE DATA | | | |
Size in | 6 | 6 | 3 | 6
Length m | 70.0 | 90.0 | 20.0 | 70.0
Schedule | 40 | 40 | 40 | 40
ID mm | 154 | 154 | 77.9 | 154
Roughness (E-3) mm | 45.7 | 45.7 | 45.7 | 45.7
Safety factor | 1.0 | 1.0 | 1.0 | 1.0
Sum of elev's m | 0 | 0 | 0 | 0
VELOCITY | | | |
Velocity ft/s | 1.11 1.11 1.11 | 0.845 0.845 0.845 | 3.3 3.3 3.3 | 0.264 0.264 0.264
Sonic-Vapor adia ft/s | 1,155 | 1,155 | 1,155 | 1,155
Vapor isoT ft/s | 976 | 976 | 976 | 976
PRESSURE DROP (In-Out) | | | |
Overall psi | 0.09173 | 0.07641 | 17.48 | 0.006672
Friction psi | 0.09173 | 0.07641 | 0.4021 | 0.006672
Accel'n psi | 0 | 0 | 0 | 0
Static psi | 0 | 0 | 17.07 | 0
dP/Length psi/100ft | 0.0356 | 0.0218 | 0.613 | 0.00276
LINE SIZING | MAX/LARGER MIN/SMALLER | MAX/LARGER MIN/SMALLER | MAX/LARGER MIN/SMALLER | MAX/LARGER MIN/SMALLER
dP/Length psi/100ft | 0.999 | 0.999 | 0.999 | 0.999
Velocity ft/s | 328 0.984 | 328 0.984 | 328 0.984 | 328 0.984
VelCoef ft/s | 12.4 1.04 | 12.4 1.04 | 12.4 1.04 | 12.4 1.04
Size-Larger/Small in | 8 4 | 8 4 | 4 2 | 8 4
dP/Length psi/100ft | 0.00944 0.265 | 0.0058 0.16 | 0.16 4.43 | 0 0.0196
Velocity ft/s | 0.64 2.52 | 0.488 1.92 | 1.92 7.27 | 0.152 0.599

======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Loading Gantry Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Loading Gantry Poo This information is confidential, and shall Page: 8
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
PIPE LINE REPORT Date: 16-09-2019
======================================================================================================================================================

-----------------------------------------------------------------------------------------------------------------------------------------------------
Line number | L6 | L7 | L12 | L8
Line name | Pipe | Pipe | Pipe | Pipe
-----------------------------------------------------------------------------------------------------------------------------------------------------
LIQUID HOLDUP | | | |
Liquid Fraction (vol) | 1.0 | 1.0 | 1.0 | 1.0
Liquid Holdup(dP) (vol) | 1.0 | 1.0 | 1.0 | 1.0
2-PHASE METHOD | Homogeneous | Homogeneous | Homogeneous | Homogeneous
FLOW REGIME | | | |
Horizontal | - | - | - | -
Vertical-Up | - | - | - | -
Vertical-Down | - | - | - | -
HOMOGENEOUS/DUKLER | | | |
Reynolds No | 52,072 | 39,675 | 78,431 | 12,398
Friction factor | 0.02175 | 0.02292 | 0.02134 | 0.0297
Friction factor (turb) | 0.01489 | 0.01489 | 0.0173 | 0.01489
Dukler-2phase factor | 1.00 | 1.00 | 1.00 | 1.00
density kg/m3 | 0 | 0 | 0 | 0
LOCKHART-M/CHENOWETH-M | | | |
Liquid-Re | 0 | 0 | 0 | 0
f | 0 | 0 | 0 | 0
Psi/Psi^2 | 0 | 0 | 0 | 0
Vapor-Re | 0 | 0 | 0 | 0
f | 0 | 0 | 0 | 0
Psi^2 | 0 | 0 | 0 | 0
X factor | 0 | 0 | 0 | 0
FITTINGS | TYPE No L/D K | TYPE No L/D K | TYPE No L/D K | TYPE No L/D K
| Entrance 0 0 0.5 | Entrance 0 0 0.5 | Entrance 0 0 0.5 | Entrance 0 0 0.5
| Exit 0 0 1 | Exit 0 0 1 | Exit 0 0 1 | Exit 0 0 1
| Gate valve 0 8 0 | Gate valve 1 8 0 | Gate valve 0 8 0 | Gate valve 1 8 0
| Globe valv 0 340 0 | Globe valv 0 340 0 | Globe valv 0 340 0 | Globe valv 0 340 0
| Check 0 50 0 | Check 0 50 0 | Check 0 50 0 | Check 0 50 0
| Stop-check 0 400 0 | Stop-check 0 400 0 | Stop-check 0 400 0 | Stop-check 0 400 0
| Elbow 4 20 0 | Elbow 7 20 0 | Elbow 0 20 0 | Elbow 1 20 0
| 180 Bend 0 50 0 | 180 Bend 0 50 0 | 180 Bend 0 50 0 | 180 Bend 0 50 0
| T-Straight 0 20 0 | T-Straight 1 20 0 | T-Straight 0 20 0 | T-Straight 1 20 0
| T-Branch 0 60 0 | T-Branch 0 60 0 | T-Branch 0 60 0 | T-Branch 0 60 0
| Other 0 0 | Other 0 0 | Other 0 0 | Other 0 0
Total K | 0 | 0 | 0 | 0
Total L/D | 80 | 168 | 0 | 48
Equiv Length m | 78.4 | 107 | 20.0 | 73.7

======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Loading Gantry Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Loading Gantry Poo This information is confidential, and shall Page: 9
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
PIPE LINE REPORT Date: 16-09-2019
======================================================================================================================================================

-----------------------------------------------------------
Line number | L9
Line name | Pipe
-----------------------------------------------------------
PROCESS DATA | AVG IN OUT
Temperature C | 25.0 25.0 25.0
Pressure psig | 156.6 156.7 156.6
Liq Fraction wt | 1.0 1.0 1.0
Total-Flow t/h | 5.40
Dens-NS kg/m3 | 1,000 1,000 1,000
Elev kg/m3 | 1,000
Visc-NS cP | 1.0
Vapor-Flow t/h | 0
Density kg/m3 | 13.3
Visc cP | 0.010
Mol wt | 28.0
Z | 1.0
Cp/Cv | 1.4
Liquid-Flow (wt) t/h | 5.40
Flow (vol) m3/h | 5.40
Density kg/m3 | 1,000
Visc cP | 1.0
PIPE DATA |
Size in | 4
Length m | 60.0
Schedule | 40
ID mm | 102
Roughness (E-3) mm | 45.7
Safety factor | 1.0
Sum of elev's m | 0
VELOCITY |
Velocity ft/s | 0.599 0.599 0.599
Sonic-Vapor adia ft/s | 1,155
Vapor isoT ft/s | 976
PRESSURE DROP (In-Out) |
Overall psi | 0.04212
Friction psi | 0.04212
Accel'n psi | 0
Static psi | 0
dP/Length psi/100ft | 0.0196
LINE SIZING | MAX/LARGER MIN/SMALLER
dP/Length psi/100ft | 0.999
Velocity ft/s | 328 0.984
VelCoef ft/s | 12.4 1.04
Size-Larger/Small in | 6 3
dP/Length psi/100ft | 0.00276 0.0729
Velocity ft/s | 0.264 1.03

======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Loading Gantry Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Loading Gantry Poo This information is confidential, and shall Page: 10
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
PIPE LINE REPORT Date: 16-09-2019
======================================================================================================================================================

-----------------------------------------------------------
Line number | L9
Line name | Pipe
-----------------------------------------------------------
LIQUID HOLDUP |
Liquid Fraction (vol) | 1.0
Liquid Holdup(dP) (vol) | 1.0
2-PHASE METHOD | Homogeneous
FLOW REGIME |
Horizontal | -
Vertical-Up | -
Vertical-Down | -
HOMOGENEOUS/DUKLER |
Reynolds No | 18,678
Friction factor | 0.02724
Friction factor (turb) | 0.01627
Dukler-2phase factor | 1.00
density kg/m3 | 0
LOCKHART-M/CHENOWETH-M |
Liquid-Re | 0
f | 0
Psi/Psi^2 | 0
Vapor-Re | 0
f | 0
Psi^2 | 0
X factor | 0
FITTINGS | TYPE No L/D K
| Entrance 0 0 0.5
| Exit 0 0 1
| Gate valve 1 8 0
| Globe valv 0 340 0
| Check 0 50 0
| Stop-check 0 400 0
| Elbow 3 20 0
| 180 Bend 0 50 0
| T-Straight 1 20 0
| T-Branch 0 60 0
| Other 0 0
Total K | 0
Total L/D | 88
Equiv Length m | 65.4

NOTES - (1) dPoverall = dPfrictional + dPaccel + dPstatic


(2) NS = No slip or homogenous

======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Loading Gantry Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Loading Gantry Poo This information is confidential, and shall Page: 11
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
FEED SUMMARY Date: 16-09-2019
======================================================================================================================================================

Number Description Elevation Density Level Rel Elev Rel Pres dP Level dP Inlet Pres
m kg/m3 m m psi psi psi psig

FW Tank Feed to Unit 0.60 1,000 0.50 0 - 0.711 0.156 0

======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Loading Gantry Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Loading Gantry Poo This information is confidential, and shall Page: 12
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
PRODUCT SUMMARY Date: 16-09-2019
======================================================================================================================================================

Number Description Elevation Density Level Rel Elev Rel Pres dP Level dP Inlet Pres
m kg/m3 m m psi psi psi psig

Gantry Product from Unit 0 1,000 0 0 - 0 0 150


T-678 Product from Unit 12.0 1,000 0 0 - 0 0 139
Shed Product from Unit 0 1,000 0 0 - 0 0 157

======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Loading Gantry Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Loading Gantry Poo This information is confidential, and shall Page: 13
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
PUMP SUMMARY Date: 16-09-2019
======================================================================================================================================================

Number Description Eff Power Flow Density Vol Flow Head Pout-Pin PresIn PresOut
kW t/h kg/m3 m3/h m psi psig psig

P1 Pump 1.0 29.8 98.5 1,000 98.5 111 158 0.661 159

======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Loading Gantry Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Loading Gantry Poo This information is confidential, and shall Page: 14
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
T-PIECE SUMMARY Date: 16-09-2019
======================================================================================================================================================

Number Description Service Line Spacing Kc Q/Qc A/Ac Pressure


L/ID psig

T1 Tee piece Combined L2 1.0 1.0 157


Manifold L6 0 0.191 0.23 1.0 157
Branch L11 1.3 0.77 1.0 157

T3 Tee piece Combined L6 1.0 1.0 157


Manifold L7 0 1.17 0.762 1.0 157
Branch L8 1.02 0.238 1.0 157

NOTES - (1) dP Inlet for Feed, Products and Vessels represent pressure to velocity conversion only, not friction.

======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Loading Gantry Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Loading Gantry Poo This information is confidential, and shall Page: 15
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
WARNINGS & ERRORS Date: 16-09-2019
======================================================================================================================================================

Warning! Line L5 dP/L exceeds maximum (kPa/100m) = 22.6


Warning! Line L7 velocity coef less than minimum (m/s) = 0.3162
Warning! Line L8 velocity coef less than minimum (m/s) = 0.3162
Warning! Line L9 velocity coef less than minimum (m/s) = 0.3162

======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Loading Gantry Pool Fire.dat