WORK PACKAGE

ENGINEERING SITE SURVEY

Approval Sheet
Name Title Date Signature

Revision Status

PT. Depriwangga Engineering Owner


Rev Issue Date Issue Purpose
Prepared Checked Approved Signature
by by by

Revise Revision Log Register


Document Number :
Document Title : ENGINEERING SITE SURVEY
Revision :A
Page Date Revise PHE ONWJ Reviewer
Work Pack Check List
Document Number :
Description : ENGINEERING SITE SURVEY
Tag No. : N/A
Location : MMF PLATFORM

Page No. Item Tick if Required Tick if Included


Section A. Job Summary
 Introduction
 Objective
 Scope of Work
 Area of Work
 Personal Required
 Tools and Equipment Requirement

Section B. HSSE
 Level 1 Risk Assessment
 Level 2 Risk Assessment
 Control Measure – Lifting Plan

Section C. Process
 Release/hand back sheet ICC
 Blank control list sketch/diagram
 Multipurpose blank/boundary isolation

Section D. Engineering
 FCP Screening
 Maximo request
 RBI Inspection Result
 Job breakdown
 Sketch/ photograph/ drawing
 Material list/packing list
 Scaffolding instruction
 Datasheet, manufacture manual installation, wiring
termination diagram, hoop drawing

Section E. Additional Information


 Plot Plan Drawing
 P&ID Drawing
 Isometric drawing
 Hot Work Permit
 ITP (Inspection Test Plan)
 Work Procedures that have related with the work
pack
 Personal and tools certificates
Page No. Item Tick if Required Tick if Included
 MOC engineering recommendation
 PTW mapping

Signature Date
Work pack Owner – Work Pack Complate
ENGINEERING SITE SURVEY
SECTION 2

SECTION A
JOB SUMMARY

1. Introduction
2. Objective
The main purpose of engineering survey to verify the battery limit on the existing facilities, tie-in
connection location, location of equipment, pipe routing routing etc.

3. Scope of Work
To perform engineering survey at Mike-Mike area (MMF Platform). The engineering team will do
visual check, measuring and taking documentation (pictures) for getting the real visualization. The
result data will be used for engineering activities.

4. Area of Work
Mike-Mike Area: MMF Platform

5. Personal Required
1. Mechanical/ Piping Engineer :-
2. Mechanical/ Piping Engineer :-
3. Piping Designer :-

6. Tool and PPE Required


1. Digital Camera
2. Measuring Tape
3. Personal Protection Equipment:
 Coverall (fire resistance type)
 Helmet
 Ear muff and ear plug
 Safety shoes
 Safety goggles
 Hand gloves
 Using sandal with front cover in accommodation area.
ENGINEERING SITE SURVEY

Mechanical/ Piping
No. Description Tick if required Tick if Included
1
2

Page No. Item Remark


1. MMF Platform (Mike-Mike Area)
Page No. Item Remark