Approval Sheet
Name Title Date Signature
Revision Status
Section B. HSSE
Level 1 Risk Assessment
Level 2 Risk Assessment
Control Measure – Lifting Plan
Section C. Process
Release/hand back sheet ICC
Blank control list sketch/diagram
Multipurpose blank/boundary isolation
Section D. Engineering
FCP Screening
Maximo request
RBI Inspection Result
Job breakdown
Sketch/ photograph/ drawing
Material list/packing list
Scaffolding instruction
Datasheet, manufacture manual installation, wiring
termination diagram, hoop drawing
Signature Date
Work pack Owner – Work Pack Complate
ENGINEERING SITE SURVEY
SECTION 2
SECTION A
JOB SUMMARY
1. Introduction
2. Objective
The main purpose of engineering survey to verify the battery limit on the existing facilities, tie-in
connection location, location of equipment, pipe routing routing etc.
3. Scope of Work
To perform engineering survey at Mike-Mike area (MMF Platform). The engineering team will do
visual check, measuring and taking documentation (pictures) for getting the real visualization. The
result data will be used for engineering activities.
4. Area of Work
Mike-Mike Area: MMF Platform
5. Personal Required
1. Mechanical/ Piping Engineer :-
2. Mechanical/ Piping Engineer :-
3. Piping Designer :-
Mechanical/ Piping
No. Description Tick if required Tick if Included
1
2
Signature Date
Work pack Owner – Work Pack Complate