12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Short-Circuit Analysis
ANSI Standard
3-Phase, LG, LL, & LLG Fault Currents
1/2 Cycle Network
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Cable Length: No
Apply Individual
Temperature Correction Adjustments /Global Degree C
36 Buses Total
Ohms or Siemens per 1000 ft per Conductor (Cable) or per Phase (Line)
Line/Cable Length
Grounding
Branch Connections
CAT 32/2 Turbo 1.000 0.415 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00
CAT C32/1 Diesel 1.000 0.415 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus7 Total 0.00 0.0 109.65 -134.9 122.89 129.0 9.756 -45.9 0.000 0.0 0.000 0.0 3.252 3.252 3.252
Bus5 Bus7 69.35 -11.9 100.37 -120.9 101.18 120.6 9.756 -45.9 0.000 0.0 0.000 0.0 3.252 3.252 3.252
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 11
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus8 Total 0.00 0.0 104.88 -130.9 116.42 126.2 15.334 -58.6 0.000 0.0 0.000 0.0 5.111 5.111 5.111
Bus5 Bus8 47.03 -13.4 100.04 -121.4 102.19 120.7 15.334 -58.6 0.000 0.0 0.000 0.0 5.111 5.111 5.111
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 12
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus12 Total 0.00 0.0 101.42 -128.7 113.46 124.0 19.867 -60.6 0.000 0.0 0.000 0.0 6.622 6.622 6.622
Bus5 Bus12 31.51 -21.7 99.94 -121.9 102.89 120.9 19.867 -60.6 0.000 0.0 0.000 0.0 6.622 6.622 6.622
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 13
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus16 Total 0.00 0.0 122.99 -137.4 127.57 135.2 2.430 -5.9 0.000 0.0 0.000 0.0 0.810 0.810 0.810
Bus5 Bus16 96.49 -4.7 100.32 -120.1 100.05 120.2 2.430 -5.9 0.000 0.0 0.000 0.0 0.810 0.810 0.810
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 14
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus20 Total 0.00 0.0 121.56 -137.5 127.74 134.5 2.380 -15.5 0.000 0.0 0.000 0.0 0.793 0.793 0.793
Bus5 Bus20 95.27 -4.2 100.27 -120.2 100.11 120.2 2.380 -15.5 0.000 0.0 0.000 0.0 0.793 0.793 0.793
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 15
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus57 Total 0.00 0.0 101.29 -127.4 111.28 123.6 21.100 -63.8 0.000 0.0 0.000 0.0 7.033 7.033 7.033
Bus5 Bus57 25.64 -18.6 99.75 -122.0 103.16 120.8 21.100 -63.8 0.000 0.0 0.000 0.0 7.033 7.033 7.033
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 16
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus59 Total 0.00 0.0 110.13 -134.6 122.27 129.2 9.189 -48.7 0.000 0.0 0.000 0.0 3.063 3.063 3.063
Bus5 Bus59 70.13 -9.9 100.27 -120.9 101.16 120.5 9.189 -48.7 0.000 0.0 0.000 0.0 3.063 3.063 3.063
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 17
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus61 Total 0.00 0.0 118.56 -137.9 128.61 133.2 5.709 -12.2 0.000 0.0 0.000 0.0 1.903 1.903 1.903
Bus5 Bus61 90.68 -11.1 100.68 -120.4 100.22 120.5 5.709 -12.2 0.000 0.0 0.000 0.0 1.903 1.903 1.903
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 18
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus65 Total 0.00 0.0 121.77 -137.5 127.78 134.6 2.570 -12.9 0.000 0.0 0.000 0.0 0.857 0.857 0.857
Bus5 Bus65 95.27 -4.7 100.30 -120.2 100.11 120.2 2.570 -12.9 0.000 0.0 0.000 0.0 0.857 0.857 0.857
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 19
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus67 Total 0.00 0.0 125.62 -136.8 126.50 136.4 0.342 -1.8 0.000 0.0 0.000 0.0 0.114 0.114 0.114
Bus5 Bus67 99.55 -0.7 100.05 -120.0 100.00 120.0 0.342 -1.8 0.000 0.0 0.000 0.0 0.114 0.114 0.114
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 20
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus73 Total 0.00 0.0 125.80 -136.8 126.39 136.5 0.229 -1.3 0.000 0.0 0.000 0.0 0.076 0.076 0.076
Bus5 Bus73 99.70 -0.4 100.03 -120.0 100.00 120.0 0.229 -1.3 0.000 0.0 0.000 0.0 0.076 0.076 0.076
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 21
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus75 Total 0.00 0.0 110.13 -134.6 122.27 129.2 9.189 -48.7 0.000 0.0 0.000 0.0 3.063 3.063 3.063
Bus5 Bus75 70.13 -9.9 100.27 -120.9 101.16 120.5 9.189 -48.7 0.000 0.0 0.000 0.0 3.063 3.063 3.063
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 22
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus77 Total 0.00 0.0 110.39 -135.1 123.31 129.4 9.071 -45.1 0.000 0.0 0.000 0.0 3.024 3.024 3.024
Bus5 Bus77 71.64 -11.1 100.36 -120.8 101.09 120.6 9.071 -45.1 0.000 0.0 0.000 0.0 3.024 3.024 3.024
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 23
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus81 Total 0.00 0.0 109.84 -136.6 126.13 129.2 10.577 -33.2 0.000 0.0 0.000 0.0 3.526 3.526 3.526
Bus5 Bus81 73.06 -18.2 100.76 -120.9 101.00 120.8 10.577 -33.2 0.000 0.0 0.000 0.0 3.526 3.526 3.526
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 24
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus83 Total 0.00 0.0 120.04 -137.6 127.90 133.9 3.497 -17.4 0.000 0.0 0.000 0.0 1.166 1.166 1.166
Bus5 Bus83 92.86 -6.2 100.38 -120.2 100.19 120.3 3.497 -17.4 0.000 0.0 0.000 0.0 1.166 1.166 1.166
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 25
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus87 Total 0.00 0.0 122.92 -137.4 127.56 135.2 1.935 -9.8 0.000 0.0 0.000 0.0 0.645 0.645 0.645
Bus5 Bus87 96.71 -3.6 100.24 -120.1 100.06 120.2 1.935 -9.8 0.000 0.0 0.000 0.0 0.645 0.645 0.645
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 26
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus89 Total 0.00 0.0 120.76 -137.7 128.08 134.2 3.728 -11.6 0.000 0.0 0.000 0.0 1.243 1.243 1.243
Bus5 Bus89 93.64 -7.0 100.45 -120.2 100.14 120.3 3.728 -11.6 0.000 0.0 0.000 0.0 1.243 1.243 1.243
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 27
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus92 Total 0.00 0.0 106.66 -133.0 119.75 127.4 12.780 -52.6 0.000 0.0 0.000 0.0 4.260 4.260 4.260
Bus90 Bus92 57.63 -13.8 100.24 -121.2 101.71 120.7 12.780 -52.6 0.000 0.0 0.000 0.0 4.260 4.260 4.260
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 28
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus94 Total 0.00 0.0 120.63 -137.5 127.85 134.1 3.065 -16.7 0.000 0.0 0.000 0.0 1.022 1.022 1.022
Bus90 Bus94 93.80 -5.4 100.34 -120.2 100.16 120.3 3.065 -16.7 0.000 0.0 0.000 0.0 1.022 1.022 1.022
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 29
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus96 Total 0.00 0.0 122.36 -137.4 127.62 134.9 1.793 -14.4 0.000 0.0 0.000 0.0 0.598 0.598 0.598
Bus90 Bus96 96.48 -3.2 100.21 -120.1 100.08 120.2 1.793 -14.4 0.000 0.0 0.000 0.0 0.598 0.598 0.598
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 30
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus106 Total 0.00 0.0 108.80 -134.0 121.40 128.5 10.506 -50.1 0.000 0.0 0.000 0.0 3.502 3.502 3.502
Bus90 Bus106 65.60 -11.3 100.27 -121.0 101.36 120.6 10.506 -50.1 0.000 0.0 0.000 0.0 3.502 3.502 3.502
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 31
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus109 Total 0.00 0.0 106.66 -133.0 119.75 127.4 12.780 -52.6 0.000 0.0 0.000 0.0 4.260 4.260 4.260
Bus90 Bus109 57.63 -13.8 100.24 -121.2 101.71 120.7 12.780 -52.6 0.000 0.0 0.000 0.0 4.260 4.260 4.260
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 32
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus111 Total 0.00 0.0 100.02 -126.4 110.14 122.6 22.964 -64.2 0.000 0.0 0.000 0.0 7.655 7.655 7.655
Bus90 Bus111 19.42 -25.3 99.71 -122.2 103.45 120.9 22.964 -64.2 0.000 0.0 0.000 0.0 7.655 7.655 7.655
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 33
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus113 Total 0.00 0.0 101.33 -131.5 118.26 124.6 18.314 -51.7 0.000 0.0 0.000 0.0 6.105 6.105 6.105
Bus90 Bus113 42.60 -29.1 100.41 -121.7 102.42 121.0 18.314 -51.7 0.000 0.0 0.000 0.0 6.105 6.105 6.105
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 34
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus115 Total 0.00 0.0 107.96 -133.6 120.79 128.1 11.379 -51.1 0.000 0.0 0.000 0.0 3.793 3.793 3.793
Bus90 Bus115 62.56 -12.2 100.26 -121.1 101.49 120.6 11.379 -51.1 0.000 0.0 0.000 0.0 3.793 3.793 3.793
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 35
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Line-To-Ground Fault
Contribution % Voltage at From Bus Current at From Bus (kA)
Bus124 Total 0.00 0.0 106.06 -135.8 125.07 127.5 13.754 -36.3 0.000 0.0 0.000 0.0 4.585 4.585 4.585
Bus5 Bus124 64.77 -25.1 100.88 -121.2 101.40 121.0 13.754 -36.3 0.000 0.0 0.000 0.0 4.585 4.585 4.585
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: ETAP Page: 36
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Bus7 0.42 8.043 -10.628 13.329 6.788 -7.007 9.756 9.205 6.965 11.543 -12.048 -4.413 12.831
Bus8 0.42 8.303 -16.854 18.789 7.991 -13.087 15.334 14.596 7.191 16.271 -18.290 -1.908 18.389
Bus12 0.42 9.479 -20.809 22.867 9.759 -17.304 19.867 18.021 8.209 19.803 -22.804 -0.897 22.822
Bus16 0.42 4.026 -0.642 4.077 2.417 -0.248 2.430 0.556 3.487 3.531 -1.418 -3.419 3.701
Bus20 0.42 3.700 -1.323 3.930 2.294 -0.635 2.380 1.146 3.204 3.403 -1.974 -3.003 3.594
Bus57 0.42 9.010 -22.016 23.788 9.322 -18.929 21.100 19.066 7.803 20.601 -23.699 0.429 23.703
Bus59 0.42 7.184 -10.301 12.559 6.063 -6.906 9.189 8.921 6.221 10.876 -11.466 -3.672 12.039
Bus61 0.42 8.658 -2.955 9.149 5.579 -1.211 5.709 2.559 7.498 7.923 -4.597 -7.165 8.513
Bus65 0.42 4.068 -1.248 4.255 2.504 -0.576 2.570 1.081 3.523 3.685 -1.982 -3.345 3.888
Bus67 0.42 0.585 -0.025 0.585 0.342 -0.011 0.342 0.022 0.506 0.507 -0.142 -0.503 0.523
Bus73 0.42 0.392 -0.012 0.392 0.229 -0.005 0.229 0.010 0.339 0.339 -0.091 -0.338 0.350
Bus75 0.42 7.184 -10.301 12.559 6.063 -6.906 9.189 8.921 6.221 10.876 -11.466 -3.672 12.039
Bus77 0.42 7.727 -9.884 12.546 6.407 -6.421 9.071 8.560 6.692 10.865 -11.217 -4.369 12.037
Bus81 0.42 11.022 -9.993 14.878 8.849 -5.795 10.577 8.654 9.545 12.884 -12.228 -7.618 14.407
Bus83 0.42 5.234 -2.188 5.673 3.336 -1.049 3.497 1.895 4.533 4.913 -3.111 -4.204 5.230
Bus87 0.42 3.160 -0.730 3.244 1.907 -0.329 1.935 0.632 2.737 2.809 -1.314 -2.636 2.945
Bus89 0.42 5.860 -1.743 6.114 3.652 -0.751 3.728 1.509 5.075 5.295 -2.829 -4.855 5.619
Bus92 0.42 8.476 -14.078 16.432 7.757 -10.157 12.780 12.192 7.340 14.231 -15.625 -3.440 15.999
Bus94 0.42 4.657 -1.837 5.006 2.936 -0.880 3.065 1.591 4.033 4.336 -2.657 -3.756 4.601
Bus96 0.42 2.839 -0.925 2.986 1.736 -0.447 1.793 0.801 2.458 2.586 -1.425 -2.316 2.719
Bus106 0.42 7.734 -11.713 14.036 6.733 -8.066 10.506 10.144 6.697 12.155 -13.025 -3.679 13.534
Bus109 0.42 8.476 -14.078 16.432 7.757 -10.157 12.780 12.192 7.340 14.231 -15.625 -3.440 15.999
Bus111 0.42 9.450 -23.461 25.293 10.000 -20.672 22.964 20.318 8.184 21.904 -25.402 0.978 25.421
Bus113 0.42 11.269 -18.807 21.925 11.354 -14.370 18.314 16.287 9.759 18.987 -21.649 -4.118 22.037
Bus115 0.42 8.048 -12.633 14.978 7.146 -8.856 11.379 10.940 6.970 12.972 -14.038 -3.624 14.498
Bus124 0.42 12.717 -13.205 18.332 11.078 -8.151 13.754 11.435 11.013 15.876 -16.108 -8.250 18.097
All fault currents are symmetrical momentary (1/2 Cycle network) values in rms kA
* LLG fault current is the larger of the two faulted line currents
Project: ETAP Page: 37
12.6.0H
Location: Date: 10-07-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GSK Config.: Normal
Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus7 0.420 0.01098 0.01451 0.01819 0.01098 0.01451 0.01819 0.02993 0.02454 0.03871 0.00000 0.00000 0.00000
Bus8 0.420 0.00570 0.01158 0.01291 0.00570 0.01158 0.01291 0.01332 0.01733 0.02186 0.00000 0.00000 0.00000
Bus12 0.420 0.00440 0.00965 0.01060 0.00440 0.00965 0.01060 0.00920 0.01259 0.01559 0.00000 0.00000 0.00000
Bus16 0.420 0.05873 0.00936 0.05948 0.05873 0.00936 0.05948 0.18036 0.01189 0.18075 0.00000 0.00000 0.00000
Bus20 0.420 0.05810 0.02078 0.06171 0.05810 0.02078 0.06171 0.17838 0.03997 0.18280 0.00000 0.00000 0.00000
Bus57 0.420 0.00386 0.00943 0.01019 0.00386 0.00943 0.01019 0.00751 0.01206 0.01421 0.00000 0.00000 0.00000
Bus59 0.420 0.01104 0.01584 0.01931 0.01104 0.01584 0.01931 0.03014 0.02781 0.04101 0.00000 0.00000 0.00000
Bus61 0.420 0.02508 0.00856 0.02651 0.02508 0.00856 0.02651 0.07436 0.00991 0.07502 0.00000 0.00000 0.00000
Bus65 0.420 0.05448 0.01672 0.05699 0.05448 0.01672 0.05699 0.16696 0.02998 0.16963 0.00000 0.00000 0.00000
Bus67 0.420 0.41392 0.01782 0.41430 0.41392 0.01782 0.41430 1.29919 0.03268 1.29961 0.00000 0.00000 0.00000
Bus73 0.420 0.61850 0.01826 0.61877 0.61850 0.01826 0.61877 1.94369 0.03377 1.94398 0.00000 0.00000 0.00000
Bus75 0.420 0.01104 0.01584 0.01931 0.01104 0.01584 0.01931 0.03014 0.02781 0.04101 0.00000 0.00000 0.00000
Bus77 0.420 0.01190 0.01523 0.01933 0.01190 0.01523 0.01933 0.03284 0.02631 0.04208 0.00000 0.00000 0.00000
Bus81 0.420 0.01207 0.01095 0.01630 0.01207 0.01095 0.01630 0.03338 0.01578 0.03693 0.00000 0.00000 0.00000
Bus83 0.420 0.03944 0.01649 0.04275 0.03944 0.01649 0.04275 0.11958 0.02941 0.12314 0.00000 0.00000 0.00000
Bus87 0.420 0.07284 0.01683 0.07476 0.07284 0.01683 0.07476 0.22480 0.03025 0.22683 0.00000 0.00000 0.00000
Bus89 0.420 0.03802 0.01131 0.03966 0.03802 0.01131 0.03966 0.11511 0.01667 0.11631 0.00000 0.00000 0.00000
Bus92 0.420 0.00761 0.01264 0.01476 0.00761 0.01264 0.01476 0.01932 0.01995 0.02778 0.00000 0.00000 0.00000
Bus94 0.420 0.04506 0.01778 0.04844 0.04506 0.01778 0.04844 0.13728 0.03259 0.14109 0.00000 0.00000 0.00000
Bus96 0.420 0.07722 0.02517 0.08122 0.07722 0.02517 0.08122 0.23859 0.05078 0.24393 0.00000 0.00000 0.00000
Bus106 0.420 0.00952 0.01442 0.01728 0.00952 0.01442 0.01728 0.02533 0.02432 0.03512 0.00000 0.00000 0.00000
Bus109 0.420 0.00761 0.01264 0.01476 0.00761 0.01264 0.01476 0.01932 0.01995 0.02778 0.00000 0.00000 0.00000
Bus111 0.420 0.00358 0.00889 0.00959 0.00358 0.00889 0.00959 0.00663 0.01073 0.01261 0.00000 0.00000 0.00000
Bus113 0.420 0.00568 0.00949 0.01106 0.00568 0.00949 0.01106 0.01326 0.01219 0.01801 0.00000 0.00000 0.00000
Bus115 0.420 0.00870 0.01365 0.01619 0.00870 0.01365 0.01619 0.02275 0.02244 0.03196 0.00000 0.00000 0.00000
Bus124 0.420 0.00918 0.00953 0.01323 0.00918 0.00953 0.01323 0.02425 0.01229 0.02719 0.00000 0.00000 0.00000