0 оценок0% нашли этот документ полезным (0 голосов)
25 просмотров3 страницы
The submittal is given a status of "C" meaning revisions are required. Several comments are provided:
1. References are missing for project specifications, shop drawings, and approved materials.
2. Details for sleeves, retaining angles, sealing damper openings are missing. Connection details between ducts and dampers need to be included for vertical and horizontal orientations.
3. References are needed for usage and location of MSFDs with approved materials and drawings.
4. Damper operations must be tested after installation and documented.
5. Manufacturer recommendations for approved materials must be followed.
6. COSHH assessments are required for sealants and chemicals listed.
7. Risk assessment needs measures
The submittal is given a status of "C" meaning revisions are required. Several comments are provided:
1. References are missing for project specifications, shop drawings, and approved materials.
2. Details for sleeves, retaining angles, sealing damper openings are missing. Connection details between ducts and dampers need to be included for vertical and horizontal orientations.
3. References are needed for usage and location of MSFDs with approved materials and drawings.
4. Damper operations must be tested after installation and documented.
5. Manufacturer recommendations for approved materials must be followed.
6. COSHH assessments are required for sealants and chemicals listed.
7. Risk assessment needs measures
The submittal is given a status of "C" meaning revisions are required. Several comments are provided:
1. References are missing for project specifications, shop drawings, and approved materials.
2. Details for sleeves, retaining angles, sealing damper openings are missing. Connection details between ducts and dampers need to be included for vertical and horizontal orientations.
3. References are needed for usage and location of MSFDs with approved materials and drawings.
4. Damper operations must be tested after installation and documented.
5. Manufacturer recommendations for approved materials must be followed.
6. COSHH assessments are required for sealants and chemicals listed.
7. Risk assessment needs measures
: 00 Submittal Title: Method of statement for installation of fire damper and MSFD Discipline: Architectural Civil Electrical Plumbing HVAC Landscape ID Others (HVAC)
A = Approved (Work May Proceed)
B = Approved as Noted (Work May Proceed subject to incorporation of changes indicated) Overall Submittal Review Status: (C) C = Revise & Resubmit (Work Shall Not Proceed) D = Rejected N= Noted Initial review comments & responses are to remain within the re-submissions to keep a full review history within the same DRC until the "Review Status" states an "status A or B".
By Originator (Contractor / Reviewer
By Reviewer (Consultant/Client) Sub-Contractor) Response Document / Contractor Reference of Status SL# Rev. Reviewer Comments Drawing No. Response Compliance (Open/Closed) 1 WHCP11-QDTC-MST-0008 0 Mechanical Comments:
2 Documents reference are missing for Project specs,
Shop Drawing and approved material 3 Details Of Sleeves, Retaining angle and sealing of the damper opening missing in damper installation details. Include the details of connection between Form No. 1999-FRM-C014, Rev. 0, 10/2018 Page 1 of 3 duct and damper. Provide same detail for vertical and horizontal orientations of FD installation. 4 Provide the reference for usage and location of MFSD in the project with references of approved material and drawing numbers 5 A damper operation shall be tested after installation is complete. A written certificate shall be issued by the contractor stating the identification of damper as to location ,date tested, and names sign of testing personal- Shall be reflected in MST –Certificate sample shall be attached. 6 Comply all the instruction provided in manufacturer recommendations as per approved material 8 HSE Comments Refer to page 12, fig 6 (materials) sealant and other chemical product stated require COSHH assessment. Also refer to page 18 under the heading “chemical” 13 Refer to the risk assessment section, serial #5, no measures are stated for the use of drilling machine or associated hazards such as use of damaged drill bit or fabrication with the risk of puncture and twisting of wrist due to forceful repetitive action. 14 Refer to the risk assessment section- serial #3&5, include unauthorized maintenance of tools by incompetent operatives under the subheading “hazard” and control measures to be provided. 19 Emergency contact list requires the inclusion of the main contractor’s emergency team
Form No. 1999-FRM-C014, Rev. 0, 10/2018 Page 2 of 3