Академический Документы
Профессиональный Документы
Культура Документы
CURRICULUM VITAE
1. Full Name: Oluokun, Gbenga Oyeniyi
2. Date and Place of Birth: 6th October, 1981/Oyo
3. Nationality: Nigerian
4. State of Origin/LGA: Oyo/Atiba
5. Permanent Home/Contact Address: No. 2, Road 12, Unity Estate,
Off Agbala Itura, New Ife Road
Ibadan, Oyo State
6. Current Postal Address: Civil Engineering Department, Adeleke
University, Ede, Osun State
7. Phone/GSM Number: 08131161719/08133614978
8. Marital Status: Married
9. Number of Children and their Ages 2 (6years-3months, 1year-6months)
10. Name and Address of Next of Kin: Oluokun Victoria O.
No. 2, Road 12, Unity Estate,
Off Agbala Itura, New Ife Road
Ibadan, Oyo State
11. Telephone No. of Next of Kin: 08060776926
12. Email Address of Next of Kin victoriaopayinka@yahoo.com
13. Present Position/Date: Lecturer II/April, 2017
14. Date of Confirmation of Appointment: Not yet Confirmed
Page 1 of 8
General Certificate Examinations (GCE/WASSCE) 2000
First School Leaving Certificate 1994
Page 2 of 8
Design of Structural Elements of building
Preparation of Bill of Engineering Measurement and Evaluation (BEME)
Construction of Infrastructure Cell Site for: (a) Etisalat (b) Airtel and Mtn
Preparation of material schedule and BEME for Construction of 35m, 45m, 50m and 70m
Infrastructure/BTS Cell Site
Construction of foundation for 35m, 45m, 50m and 70m
Construction of retaining wall, Plinth/slab for generators, diesel tank, shelter,
BTS/ACDB, Access ramp/step and palisade fence
Preparation and submission of site progress report (financial and technical report)
Client-relation on the project
Pre- THP test, preparation of safe-to-climb tower report and conduction of earth test
Concrete strength test and preparation of its report
Alphapride Limited, Allen, Avenue, Ikeja, Lagos Oct. 2009- Oct., 2010
Development of Mini-Estate for Odubunmi at Dideolu Court, Ogba, Lagos State/Team
member
Desk study of the existing drawing (project)
Writing of proposal for the project
Development of project charter
Design of the 6blocks of three bedroom flat and 3nox of terrace building
Preparation of bill of engineering measurement and evaluation (BEME)
Design and Preparation of Bill of Engineering Measurement and Evaluation for 1.2km
Asphaltic road for Iloti Farm, Agbara, Ogun State/Team member
Establishment of road profile (use of dumpy level and reduction of the profile using rise
and fall method)
Collection of soil samples and soil tests
Collation of soil tests report
Design of road using CBR approach
Design of line drain
Preparation of BEME
Design of formwork frame and Costing for construction of Walkway and manhole for
Servetek Engineering on Benin Airport Road Dualization/Site Engineer.
Design of the formwork frame
Costing of casting of drainage walkway
Compilation of the report
Construction of walkway with carpet finishing
Construction of Infrastructure Cell Site for :(a) Etisalat (b) Mtn and (c) Multi-links/Site
Engineer
Preparation of BEME for Construction of 35m, 45m, 50m and 70m Infrastructure/BTS
Cell Site
Construction of foundation for 35m, 45m, 50m and 70m
Page 3 of 8
Construction of retaining wall, Plinth/slab for generators, diesel tank, shelter,
BTS/ACDB, Access ramp/step and palisade fence
Preparation and submission of site progress report (financial and technical report)
Client-relation on the project
Pre- THP test, preparation of safe-to-climb tower report and conduction of earth test
Concrete strength test and preparation of its report
Development of Project Proposal for Taraba State Water Reform: Institutional Support
Services/Team member
Preparation and submission of Expression of Interest (EOI)
Collation of consultants’ data and approach paper submitted by individual consultant
Collation and submission of final proposal (Technical and Financial Proposal)
Costing and Construction of Hand Pump Boreholes (7Nos) for Sabongida LEEMP
Community/Team member
Field work/survey
Preparation of Bill of quantities
Preparation of tender document
Opening of tender document
Evaluation of tender document
Award of Contract
Supervision of the construction
Page 4 of 8
Compilation of inception, draft and final report
Baseline study for 60 LEEMP Communities for Local Empowerment and Environmental
Management Programme (LEEMP) Community, Bauchi State /Team member/Data Analysts
Community sensitization about LEEMP project
Conduction of community election on the choice of community project officials alongside
with Community Development Association (CDA)
Project Selection and Prioritization using tree matrix and other methods
Preparation of Community Development Plan (CDP)
Training of the community and the officials on the project execution (planning,
monitoring, accounting, procurement, conflict management, and project management)
Triacta Nig Ltd
Construction of asphaltic road with drainage at Warji LGA, Bauchi (served as checker)
Private Job executed
Supervision of 3km lateritic road with culverts for Fadama Community Association
(FCA), Warji 2008
Rehabilitation of Mini earth dam for Warji FCA, 2007
Construction of market stall for Bunga FCA, 2007
Supervision 5km access road with culvert lateritic road for Ranga FCA, Bauchi, 2006
Samdok Venture Nig. Ltd and Other Experience
Construction of shopping complex for PW, Alagbon, Oyo (IT), 2004
Site Engineer, Samdok Nigeria Venture, Oyo, Oyo State, 2003-2004
Assistant Quantity Surveyor, Physical Planning, Unilorin (IT), 2004
2. Oluokun, G.O., Agbede, O.A., Adeyemi, G.A., and Abidoye, N.A. (2017). Assessment
of the Effect of Leachate on Groundwater Quality around Lapite Dumpsite in Ibadan,
Southwestern Nigeria. Journal of Multidisciplinary Engineering Science Studies (JMESS)
ISSN: pp. 1937-1942 , Vol. 3 Issue 8.
3. Ola, S.A., Akinniyi B.D., Oluokun, G. O. and Akanbi O.T. (2016). X-Ray Analysis of
Igbokoda Sand, Southwestern Nigeria and its Application in Manufacturing and
Page 5 of 8
Construction Industries. International Journal of Advanced Research in Computer
Engineering & Technology, Volume 5, Issue 11, pp. 2670-2673.
4. Alomaja, J.A., Wilson, U. N. and Oluokun, G.O. (2016). Analytical Investigation on the
Seismic Response of Reinforced Concrete Frame Using Midasgen. The International
Journal of Science & Technoledge. Vol 4, Issue 6, pp. 49-52
5. Oluokun G.O., Agbede, O.A Adeyemi G.A., Akeredolu, R.J. and Akinniyi, B.D. (2017).
Impact of Leachate on Permeability Characteristic of Soil around Lapite Dumpsite in
Ibadan, Southwestern Nigeria. International Journal of Research in Engineering and
Applied Sciences (IJREAS), Vol. 7 Issue 4, pp. 1~10 ISSN (O): 2249-3905, ISSN(P):
2349-6525.
6. Agbede, O.A., Akanbi, O.T., Oluokun, G.O. and Alomaja, J.A. (2016). Effects of
Varying Concentrations of Chloride (Sodium Chloride) on the Compressive Strength of
Laterized Concrete International Journal Of Advanced Research in Engineering &
Management (IJAREM) ISSN: 2456-2033 || PP. 43-48.
7. Agbede, O.A., Akinyemi K., Oluokun, G.O. and Jaiyeoba, K.F. (2016). Impact of Firing
Temperature on the Comprehensive Strength of Lateritic bricks. IJAREM.
8. Oluokun, G.O., Salau, O.B.E. , Agbede, O.A. , Akanbi O.I. , and Idenyi, A.A.(2017).
Assessment of Pollution Level in the Rivers of Idah Town, Kogi State, North Central
Nigeria African Journal of Environmental Health Sciences Volume 4, [1], pp 31-40.
9. Oluokun G.O., Agbede, O.A Adeyemi G.A., Abidoye N.A. and Akanbi, O.T.
Evaluation of Suitability of Soil Around Lapite Dumpsite for Civil Engineering
Constructions. Ready for Publication
Page 6 of 8
4. 4th Annual Conference on Environmental Health Sciences, Ibadan, Nigeria. Pollution
control and Sustainable Technology.
2. Aderogba, B., Agbede, O.A. and Oluokun, G.O. (2015). Geotechnical Investigation of Saki
Township. 1st Annual Civil Engineering Conference, University of Ibadan.
3. Oluokun G.O., Agbede, O.A Adeyemi G.A., Abidoye N.A. and Akanbi, O.T. (2016).
Evaluation of Suitability of Soil Around Lapite Dumpsite for Civil Engineering
Constructions. 4th Annual Conference on Environmental Health Sciences, Ibadan, Nigeria.
Pollution control and Sustainable Technology.
4. Salau, O.B.E., Agbede, O.A., Oluokun, G.O., Idenyi, A.A., Akanbi O.T. (2016).
Assessment of Pollution Level In The Rivers Of Idah Town, Kogi State, Northwestern
Nigeria. 4th Annual Conference on Environmental Health Sciences, Ibadan, Nigeria.
Pollution control and Sustainable Technology.
Page 7 of 8
26. Referees
Engr. Prof. O.A. Agbede,
Civil Engineering Department,
University of Ibadan, Ibadan,
Nigeria.
08033847722
…………………………
Signature and Date
Page 8 of 8