2 and 3
Design of Pier
Concrete M20
Steel Fe 500
Left Span 25 m
Right Span 25 m
Superstructure DL/m Left span 151.01 kN/m
DL per m Right span 151.01 kN/m
HFL 134.80 m
LWL 130.56 m
Average bed level (dry) 132.00 m
Scour Level 115.4 m
RL of pavement 142.10 m
Well diameter 8m
Well Cap Thickness 2m
Steining Length 22.0 m
Steining Thickness 1.30 m
Design of Pier No. 2 and 3
Max. SF 2250 kN
(reaction of two 25 m span beams only)
shear stress 1.13 N/mm2
Case II (DL+LL+EQ)
eccentricity, e(x-x) 1082 mm
eccentricity, e(y-y) 689 mm
e(x-x)/D(x-x) 0.68
e(y-y)/D(y-y) 0.08
Moment along x-x will be analyzed as e/D along y-axis is small compared to x-axis
,where p = (1.5m-1)*c*(n-100)/n
t = m*c*(D-100-n)/n
The two equations are satisfied when n and c have the following values
Then, n = 486 mm
Case I (DL+LL)
e (x-x) 486 mm
Since e (Case I) << e (Case II), stresses in Concrete and Steel will be governed by Case II
Design of Pier No. 2 and 3
WELL CAP
k= 0.033 m
B= 8.00 m
D= 22.00 m
Force
Lever Moment
SN Description Horizontal
Vertical arm
x-x y-y y-y x-x
1a Case I (Dl+LL) 7989.56 0.00 386.74 - 3880.73
1b M due to Case I 2.00 - 773.47
2a Case II (DL+LL+EQ) 7989.56 719.06 1036.36 5507.10 8642.15
2b M due to Case II 2.00 1438.12 2072.73
3 Water Current 231.93 22.31 1.33 309.24 29.74
4a Well cap 2412.74
4b EQ due to Well Cap 217.15 217.15 1.00 217.15 217.15
Let q1 and q2 be the angle between edges of pier stem on outer and inner well dia. from center
cos(q1/2) = 0.20 q1/2 = 1.37
cos(q2/2) = 0.30 q2/2 = 1.27
3. DESIGN OF STEINING
Reinforcement of Steining
Vertical reinforcement@0.12%= 32836 mm2
no. of 16 dia. bars = 163 nos.
Total perimeter available = 46 m
Spacing of bars required = 283 mm
I = Ib+mIv(1+2m'a)
m= 1.00
m' 0.36
a 0.29
m 0.58
Hence, I = 1537.94 m4
r = (D/2).(I/mIv) 5.96 m
TOTAL H 3989.03 kN
P = M/r = 10141.23 kN
D/B = 1.11
C = 0.285
Mb = CVB(tanf) = 39763.03 kNm f = 33