Design of Pier
Concrete M20
Steel Fe 500
Left Span 25 m
Right Span 55 m
Superstructure DL/m Left span 151.00 kN/m
DL per m Right span 203.64 kN/m
HFL 134.80 m
LWL 130.56 m
Average bed level (dry) 127.00 m
Scour Level 115.40 m
RL of pavement 142.10 m
Well diameter 7m
Well Cap Thickness 1.5 m
Steining Length 22.5 m
Steining Thickness 1.15 m
Design Calculation for Pier No. 18
Although the code provision requires the design shear force @d, take max. SF
Design SF 3402 kN
Shear stress = 1.43 N/mm2
5 Longitudinal Forces
5a due to braking (25m span) 110.80 9.44 1045.95
5b due to braking (55m span) 159.40 12.74 2030.76
5c others (25m span) 56.25 9.44 531.00
5d Friction (55m span) 336.30 12.74 4284.43
7 Earthquake 0.09
7c Pier Cap 69.85 69.85 7.94 554.64 554.64
7d pier cap trapezoidal 47.63 47.63 6.34 301.96 301.96
7e Stem 21.74 21.74 2.67 58.05 58.05
7f Superstructure, DL 673.88 673.88 10.54 7102.64 7102.64
7g LL (only in x-x direction) 130.32 12.74 1660.29
Case I (1.5DL+1.5LL)
Diameter of pier stem 2.4 m
Area of pier stem 4.52 m2
Perimeter of pier stem 7.54 m
From SP16 Design Aid Chart 59 and 60 for circular column (For Fe500 Steel)
p/fck 0.01 0.015
p= 0.25 0.375
Area bars 11310 16965
WELL CAP
k= 0.033 m
B= 7.00 m
D= 22.50 m
Force
SN Description Vertical Horizontal Lever arm Moment
1a Case I 10482.45 681.58 9712.60
1b 1.50 1022.37
2a Case II 10482.45 1372.33 15991.17
2b 1.50 2058.49
3 Water Current 13.40 1.00 13.40
4 Well cap 1385.44
5 Well cap 124.69 0.75 93.52
Case I: DL + LL
smax 962.13 kN/m2
smin 160.92 kN/m2
Case II: DL + LL + EQ
smax 1238.25 kN/m2
smin -115.20 kN/m2
Design Calculation for Pier No. 18
chord AD = 6.90 m
chord BC = 4.54 m
At Support At Center
i) Mr = Mt = 9321.02
ii) Mr -9321.02
Mt 1677.78
At Support At Center
1) Mr = Mt = 9321.02
2) Mr -7410.21
2) Mt -8977.07
3) Mr -55.13 32.52
3) Mt -9.92 32.52
1) Mr = Mt = 9321.02
2) Mr -9321.02
2) Mt 1677.78
3) Mr 85.86 87.65
3) Mt 45.20 87.65
Design Calculation for Pier No. 18
Case I (DL+LL)
M1 4478.48 kNm
Max reactive M at support 559.81 kNm
Max M at center of well cap 2799.05 kNm
Max M at the edge of well cap -559.81 kNm
3. DESIGN OF STEINING
Reinforcement of Steining
Vertical reinforcement = 25362 mm2 (0.12% of steining area)
no. of 16 dia. bars = 126
Total perimeter available = 40 m
Spacing of bars required = 320 mm
PROVIDE 16 dia.@250 c/c vertical bars & 12@300 hoop reinforcement (staggered)
Design Calculation for Pier No. 18
r = D/2*(I/(mI(v))
r= 5.59 m
P = M/r = 13313.30 kN
pt = (V - m'P)/A + MB/2I = 743.21 kN/m2 < 1.25×650 OK
Design Calculation for Pier No. 18
D/B = 1.26
C = 0.29
Mb = CVB*tan(f) = 35130.58 kNm f = 33
P = M/r = 5927.60 kN
pt = (V - m'P)/A + MB/2I = 715.05 kN/m2 < 800 OK
ph = (V - m'P)/A - MB/2I = 557.72 kN/m2 > 0 OK
Design Calculation for Pier No. 18
N 1320.23 kN/m
d 6.43 m
q 48.19
m 22
T= 3267.34 kN
Permissible stress in steel 95 N/mm2 (As per IRC:21 Table 10)
Ast reqd 5353 mm2/m
Spacing using 4-16 dia hoops 150 mm/m
Provide 4 rings @150 c/c 108224 mm2-m/m (Min Ast will govern the reinforcement requirement)
Hence, t = 1.47 m
tmin = 2.35 m (half of inner well diameter)