Pre-bored Pre-cast piling method

Outline of Pre-bored Pre-cast Piling Method


In early 20th century, steel bar concrete pile appeared in China as growing up of cement industry.
In mid-80th, China introduced High-strength concrete pile from Japan.
In 1988, ZDOON introduced the first pile production line of Zhejiang Province.
In 1989, ZDOON developed Pre-tensioned Reinforced Thin Wall Concrete Pile, and it was listed into the
National Spark Program.

In 2010, taking “Green Economic, Industry Upgrading” as the mission, by combining PHDC and PRHC

piles, ZDOON creatively developed anti-seismic PRHC pile and Pre-bored Pre-cast Piling Method. PRHC

pile has the character of anti-seismic, energy-saving and environmental-friendly.

ZDOON has over 20 years’ mature experience and technic in manufacturing and application of Pre-cast
Pile industry till now.

Outline of Pre-bored Pre-cast Piling Method


1、Range of Application
(1)It is suitable for cohesive soil, floury soil, sandy soil, filled earth, gravel ground and terrane of
complicated geological condition, multi-interlayered, uneven-weathering, soft and hard transformed.
(2)Applicable for project that controlling of compacting effect is required.

2、By combining PRHC pile, High-strength pile, using Diameter Reducing Technology in the project, to
achieve the goal of meeting different requirements on anti-pressing, anti-pulling, anti-horizontal force
of the project,
3、Integrate virtues of cast-in-situ bored pile, deep mixed pile, pre-bored & root-enlarged pile, it is
advanced and reliable.
4、Root-enlarged diameter can reach 1.6 of drilling diameter. It can upgrade bearing strength of pile
foundation, control total settlement and uneven settlement by injecting cement paste into pile toe
(compressive strength above 20MPa).
5、Adapt diameter: 500~1200mm.
6、 Maxim piling depth: 80 m.

Nine Merits:
1、By combining PRHC pile and High-strength pile, use technology of root-enlargement, cement past
injection, this method can achieve the goal of anti-pressing, anti-pulling, anti-horizontal force.
2、Whole piling process is visible, controllable. Automatically monitoring devices, intelligent
management can assure the quality of the project.
3、Pre-bored pile sinking is zero-damage to pile body.
4、Can test viriation of bearing strautum by control electric current of drilling machine, not need to cut
the pile.
5、Soil-squeezing-free, noiseless, mud-emission-free, which solve the problem of mud discharge from
the very beginning, brings great social benefit.
6、Fully use of pile material intension. 50% less co2 emission compared with traditional piling method, it
is environment-friendly.
7、Decay-résistance ability increased for cement paste protection on pile body and joints.
8、Simple, quick, reliable mechanical connection method available, can assure the reliability of pile
extension and piling efficiency.
9、More efficient! Daily pile-sinking ability is over 300 meters. It can save cost at 20% on pile foundation
than that of cast-in-place pile.
Equipment

Blender,
crane,
drilling machine,
excavator,
expansion wings of the drill head.

Monitoring of the engineering process


Whole process of Pre-bored Pre-cast Piling Method is auto-monitored and intelligent-managed.
Electric Current Detector,
Depth Detector,
Piling-management Device,
Cement paste flow measurement Device,
Flow Control Device for Water-cement Ratio of Cement Paste
Hydraulic Expansion Management Device,
Drilling Stem Perpendicularity Detector,
Lading Capacity Management Device
The example is shown although there are some from which a construction
process differs. After carrying out precedent boring by Auger and injecting slurry
for to stabilize the pile circumference, the pile having a special tip shoe and tip
metallic is inserted into the bored hole, a top or a tip part is driven by free drop
hammer, and bearing capacity is made to ensure.

It can construct in a comparatively low vibration and noise, and evaluation of the
bearing capacity calculation formula is higher than a pre-boring with root
hardening cement slurry method of construction.

For application of pile diameter, about 300-600mm and the maximum pile length
are about 40m.

.
1) Boring to specify depth by Earth Auger, and pull it up while injecting hardening slurry at the
bottom part of bored hole.
2) The pile that attached the movable shoe in the tip part is inserted in a hole.
3) Drive the movable shoe at the tip of a pile with a drop hammer in a pile hollow part.
4) Place cement paste in a pile tip part, and unify a movable shoe and the main part of a pile.