In 2010, taking “Green Economic, Industry Upgrading” as the mission, by combining PHDC and PRHC
piles, ZDOON creatively developed anti-seismic PRHC pile and Pre-bored Pre-cast Piling Method. PRHC
ZDOON has over 20 years’ mature experience and technic in manufacturing and application of Pre-cast
Pile industry till now.
2、By combining PRHC pile, High-strength pile, using Diameter Reducing Technology in the project, to
achieve the goal of meeting different requirements on anti-pressing, anti-pulling, anti-horizontal force
of the project,
3、Integrate virtues of cast-in-situ bored pile, deep mixed pile, pre-bored & root-enlarged pile, it is
advanced and reliable.
4、Root-enlarged diameter can reach 1.6 of drilling diameter. It can upgrade bearing strength of pile
foundation, control total settlement and uneven settlement by injecting cement paste into pile toe
(compressive strength above 20MPa).
5、Adapt diameter: 500~1200mm.
6、 Maxim piling depth: 80 m.
Nine Merits:
1、By combining PRHC pile and High-strength pile, use technology of root-enlargement, cement past
injection, this method can achieve the goal of anti-pressing, anti-pulling, anti-horizontal force.
2、Whole piling process is visible, controllable. Automatically monitoring devices, intelligent
management can assure the quality of the project.
3、Pre-bored pile sinking is zero-damage to pile body.
4、Can test viriation of bearing strautum by control electric current of drilling machine, not need to cut
the pile.
5、Soil-squeezing-free, noiseless, mud-emission-free, which solve the problem of mud discharge from
the very beginning, brings great social benefit.
6、Fully use of pile material intension. 50% less co2 emission compared with traditional piling method, it
is environment-friendly.
7、Decay-résistance ability increased for cement paste protection on pile body and joints.
8、Simple, quick, reliable mechanical connection method available, can assure the reliability of pile
extension and piling efficiency.
9、More efficient! Daily pile-sinking ability is over 300 meters. It can save cost at 20% on pile foundation
than that of cast-in-place pile.
Equipment
Blender,
crane,
drilling machine,
excavator,
expansion wings of the drill head.
It can construct in a comparatively low vibration and noise, and evaluation of the
bearing capacity calculation formula is higher than a pre-boring with root
hardening cement slurry method of construction.
For application of pile diameter, about 300-600mm and the maximum pile length
are about 40m.
.
1) Boring to specify depth by Earth Auger, and pull it up while injecting hardening slurry at the
bottom part of bored hole.
2) The pile that attached the movable shoe in the tip part is inserted in a hole.
3) Drive the movable shoe at the tip of a pile with a drop hammer in a pile hollow part.
4) Place cement paste in a pile tip part, and unify a movable shoe and the main part of a pile.