MBM- CAN PVT

Somesh Gobbur (PGP/21/358)

1. What could be the reasons for the unfavorable evaluation of PV technologies by Greg
Morgan?
The command monetary values of the competitor’s merchandises particularly BJ Solar’s
were significantly lower than PVT’s.
Solenergy was committed to a renewed focal point on disbursal control and the upfront
cost derived function was important degree Celsius) An enhanced care agenda. coupled
with a proactive quality control plan designed to place possible public presentations issues
before they occurred. should counterbalance for the inferior public presentation features of
the less dearly-won inverters. vitamin D ) The enhanced inadvertence and expanded care
agenda would raise operating cost. the lower net ownership costs argued in favour of
choosing the lowest cost merchandise.
2. Evaluate alternative course of action available to PVT to gain favorable evaluation
by Solenergy for the Barstow Project?
The four alternate class of action available to PVT
a ) Offer to widen the original guarantee at internal cost from 10 to 20 old ages
In the first scenario PVT would widen the merchandise guarantee to 20 old ages. Solenergy
would contractually prepay the guarantee premium yearly at the rate of 18 % of the
purchase monetary value of each inverter. PVT would execute guarantee services as
necessary throughout the twelvemonth and subject an bill monthly of existent internal costs
for parts. labour and service calls to Solenergy for its recordkeeping intents. At the
terminal. PVT would true up the prepayment and issue either a refund in the event of an
overpayment or an bill in the event of an underpayment. PVT offered a criterion 10
twelvemonth unlimited hr use guarantee. PVT besides offered an drawn-out guarantee.
Written in 5 twelvemonth increases at an extra cost. a status of this extension option was
that it must be exercised prior to the termination of the standard guarantee.
Those selling and gross revenues executives who were inclined to accept Solenergy’s high
acquisition cost rating favored this option because they believed the economic value of its
option would clearly countervail any merchandise cost related shortcoming Morgan may
hold identified. These executives believed that public presentation couldn’t be a believable
issue given the long public presentation history of PVT cardinal inverters and first-class
repute for the systematically successful taking border engineering. Finance. production and
technology executives. on the other. argued that PVT already had a important competitory
advantage with its 10 twelvemonth guarantee. B ) Offer a 99 % uptime warrant at no cost.
In this scenario. PVT would offer its 99 % uptime warrant for each inverter’s in service
life at no cost. believing it was improbable that the competition would fit the offer. In an
uptime warrant plan. if the inverter is non to the full functional due to a mechanical failure
for any part of productive daytime hours. the system proprietor would be compensated for
the value of the energy that would hold been delivered to clients during the period the
inverter was offline. The plan incorporated a “deductible”. whereby the first 44 hours of
downtime were treated as a negative accommodation in the reimbursement computation.
Since PVT intended to offer this coverage at no cost to Solenergy. PVT would besides
attach a care contract to the offer to guarantee the inverters were maintained as necessary
and to supply the chance for the regular onsite ocular observations. Gross saless and
marketing executives. moreover. believed the warrant reinforced the quality. lastingness.
and dependability of PVT’s merchandises and would reinforce its leading position.
Accelerate the debut of a new merchandise. scheduled to let go of shortly. with higher
capacity at 1. 25MW and 98. 5 % efficiency
In the 3rd scenario. PVT would speed up the debut of the 1. 25MW theoretical account that
was in the concluding phases of proving. This new merchandise utilized the following
coevals of power direction and PVT applied scientists believed that. with its 98. 5 %
efficiency rate and a service life that marched that of the 1. 0MW merchandise. it would
be the most efficient and dependable inverter on the market. Strategic be aftering felt that
this was the preferred manner to derive the top topographic point in the competition. It
would avoid compromising the current scheme and pricing attack. And the timing was
fortunate ; they believed that the debut of the new inverter. scheduled for April 2012. could
be moved up to mid-January 2012. by merely re-arranging the reliability/efficiency proving
waiting line and modifying the proving modus operandi. which would so run into
Solenergy’s merchandise handiness demands for the Barstow undertaking.
The gross revenues force believed the following coevals inverter. while potentially ask
foring a new set of aims. could be successfully sold to big users at the suggested net
monetary value of $ 187500 because public-service corporation undertakings were going
larger. Selling and Public Relations besides supported this attack. The new engineering
was what the market wanted for big scale undertakings and would reenforce PVT’s leading
place by being first to market. R & A ; D believed that. given the new inverter’s high
quality. Morgan would value Solenergy’s holding the chance to the first to use the latest
engineering and the most robust direction system
Tactfully initiate a duologue with Morgan to corroborate the reported findings of the rating.
Rubenstein and Salvatori suggested that before any alterations were made to merchandise
and market schemes. PVT should near Morgan straight. sharing the information PVT had
obtained about the reported rating. If Morgan confirmed what they’d heard. they could try
to carry him and Solenergy executives to portion or even re-evaluate the standards from
which they drew their decisions. Some PVT executives thought Morgan might be receptive
to a conversation. peculiarly given his employer’s relationship with PVT and his
relationship with Salvatori
3. What short term and long term policies and processes should PVT develop and
implement to effectively improve its marketing programs?
Most PVT executives suggested that a imperativeness release demand to be published but
they were unsure about the consequence on the cardinal inverter gross revenues or the
repute of PVT at least in the short term. On the other manus. some were convinced that if
PVT executives did non inquiry and get the better of the findings in the Morgan’s rating
before the seller choice procedure was concluded. PVT’s response to the RFP would
probably be rejected. Some executives believed that PVT should reexamine the current
policy of proving equipment public presentation and specifications against competitor’s
offerings. They besides urged that PVT revaluate the demands of its concern sections and
cardinal clients on a more frequent and on a regular basis scheduled footing to extenuate
the hazard that a similar state of affairs would happen in the hereafter. Those who supported
this policy believed that this work should be viewed as a long term investing in PVT’s
hereafter market place. Company applied scientists. nevertheless. were already
overcommitted. so a plan like this would necessitate extra hiring or outsourcing. Without
an addition in service staff. PVT would run the hazard of impairment in service quality for
current clients if resources were diverted to back up the new merchandise.