1 7/23/2019 Tuesday Joining formalitys completed

Syslog server trouble shoot


Tirchy Site configration-3
2 7/24/2019 Wednesday Troubleshoot of link from kumbakonam PE-PE link

3 7/25/2019 Thursday Trouble shoot of Vrrp from CBT node.


Remote to SAM
Nagarkovil visiblity check for 40 sites.
4 7/26/2019 Friday PM- activity for routers and switchs
Document prepration for PM
tirchy site configration for 3 sites.
5 7/27/2019 Saturday Document prepration for PM/log collection
PM Document verification and handover to BSNL
Nagarkovil site troubleshoot.
Salem 3 site re-configred.
Coimbatore site visiblity check/trouleshoot.
6 7/29/2019 Monday remote to SAM/Anoop
Salem 11 microwave site re-configred.
remote to SAM/Aggarwal
Nagarkovil site troubleshoot/site visiblity check
Coimbatore site visiblity check/trouleshoot.
7 7/30/2019 Tuesday Salem 10 microwave site re-configred.
Nagarkovil site troubleshoot/site visiblity check
Kombakonam port configration.
8 7/31/2019 Wednesday Coimbatore and Nagarkovil site visiblity check
to 01-08-19 Thursday Lag checkup
Netact-1 swichover activity
coimbatore microway site troubleshoot.
remort to Syslog
9 8/2/2019 Friday LACP details ROTN
Trichy site configration done to 10 sites
CBT- PM for BSC and RNC SR-08
Nagarkovil and salem site visiblity check

10 8/5/2019 Monday Trichy site configration done to 8 sites


trichy and salem site visiblity check
Node detail update.
remort to SAM
11 8/6/2019 Tuesday CBT local mw site test done
Site integrtion suppot
Trichy site configration done to 8 sites

# Nokia internal use


10/8/2019 Saturday Madurai 18 sites configred.
Site integration support

13-08-19 Tuesday Madurai 10 sites configer


Site integrtion suppot
KL integration support
14-08-19 Wednesday Madurai 10 site configer
Site integrtion suppot
VLR visiblity check
16-08-19 Friday VLR Prefix list added to MW sites
Trichy trouble shoot Vrrp
Visiblity check update
Remort to SAM and syslog team
Site integrtion suppot
17-08-19 Saturday Visiblity check update
Site integrtion suppot
VLR 3 sites configred
26/08/19 Monday PM document update for SZ
Remote to log manager tool
Visiblity check update
27/08/19 Tuesday configred 5 madurai sites
Reconfigred 3 vellore sites
Remote to SAM team to troubleshoot AP router issue.
TP clock server pending point closed.
Site visiblity taken to Tn nodes.
28/08/19 Wednesday MPR node creation in SAM
Site visiblity taken to Tn nodes.
Remote to SMS tool troubleshoot
KL visiblity check and troubleshoot
Yearly audit check
29/08/19 Thursday Netact switch over from madurai to coimbatore
Site audit previwe.
Site integrtion suppot
SAM visiblity taken

Switch CBT to madrai netact swith over


3/9/2019 Tuesday 50 site swapMPR node done t in SAM
site integration support 5 microwave sites in trichy
H2PM activty update for SZ
PM done to SAM and 2 switches in CBT
4/9/2019 Wednesday 30 TN Sites Swap to MPR node
SAM alaram cleared for ROTN

# Nokia internal use


SEPTMBER
S.No DATE DAY ACTIVITY STATUS
1 9/9/2019 Teusday SAM quary session attend.
SAM server troubleshoot done to costmer.
3 nagarkovile and 1 KKD 4 site integration support.
18 site audit completed to ROTN.
2 12/9/2019 Thursday 12 site audit completed to ROTN
coimbatore saibabacolony site integration support
PM activity updat done entier SZ
3 13/09/2019 Friday 40 site audit completed
SAM fault detection and TN Clear alram cleared.
Site integration support.
S.No DATE DAY ACTIVITY STATUS
1 16/09/2019 Monday Tech file uploded to CBT 4-SAR8 routers.
Salem PM completed for 6 nodes.
Audit report making done to ROTN 30 nodes.
2 17/09/2019 Tuesday 8 BSC site audit completed
Vellore PM completed for 6 nodes.
PM activity updat done entier SZ
3 18/09/2019 Wednesady BSCR subnets were added to all ROTN BSC routers.
TVL PM completed for 6 nodes.
6 BSC & RNC site audit completed
Nagarcovil site one 4g site troubleshoot.
Site audit updated for SZ.
4 19/09/2019 Thursday 8 BSC & RNC site audit completed
SBC troubleshoot config
VGR PM completed for 4 nodes.
4 CBT MW sites troubleshoot
5 20/09/19 Friday 10 BSC & RNC site audit completed
4 TRY MW sites visiblity taken
NGC PM completed for 2 nodes.
CBT 8 MW site troubleshoot
6 21/09/2019 Saturday TAS login troubleshoot
Pollachi one site VLAN site reconfigured router end
audit report making

# Nokia internal use


IN OUT

# Nokia internal use


SSA Site A PK ID-A Site B PK ID-B
VLR New Bus Stand_IP 5771 Vellore Main Exc 296
VLR Polytechnique- Bagayam 5772 Vellore Main Exc 296
VLR Toll Gate 5774 Vellore Main Exc 296
VLR Filterbed Road_IP 6379 Vellore Main Exc 296
VLR G Block_VIT University 8171 Katpadi_MW 294
VLR Kosapet_IP 8173 Vellore Main Exc 296
VLR Main Bazaar_VLR 8174 Vellore Main Exc 296
VLR Auxillium College_V.G.Rao Nagar, Katpadi_IP 8168 Katpadi_MW 294

# Nokia internal use


GW IP Site A IP Site B IP Subnet Mask VLAN Ring Name Router Name
10.49.78.113 10.49.78.115 10.49.78.114 255.255.255.248 953
10.49.78.121 10.49.78.123 10.49.78.122 255.255.255.248 954
10.49.78.137 10.49.78.139 10.49.78.138 255.255.255.248 956
10.49.78.161 10.49.78.163 10.49.78.162 255.255.255.248 959
10.49.78.201 10.49.78.203 10.49.78.202 255.255.255.248 964
10.49.78.209 10.49.78.211 10.49.78.210 255.255.255.248 965
10.49.78.217 10.49.78.219 10.49.78.218 255.255.255.248 966
10.49.78.241 10.49.78.243 10.49.78.242 255.255.255.248 969

# Nokia internal use


Router Port TMN Ethernet IP - A TMN Ethernet IP - B Subnet Mask
192.168.78.29 192.168.78.25 255.255.255.252
192.168.78.37 192.168.78.33 255.255.255.252
192.168.78.53 192.168.78.49 255.255.255.252
192.168.78.77 192.168.78.73 255.255.255.252
192.168.78.117 192.168.78.113 255.255.255.252
192.168.78.125 192.168.78.121 255.255.255.252
192.168.78.133 192.168.78.129 255.255.255.252
192.168.78.157 192.168.78.153 255.255.255.252

# Nokia internal use


S.No DATE DAY ACTIVITY STATUS
1 9/9/2019 Teusday SAM Training session attend. Minor
3 nagarkovile and 1 KKD 4 site integration support. Major
18 site audit completed to ROTN. Major
2 12/9/2019 Thursday 12 site audit completed to ROTN Major
coimbatore saibabacolony site integration support Minor
PM activity tracker updat done entier SZ Minor
3 13/09/2019 Friday 35 site audit completed in ROTN Major
SAM fault detection and TN Clear alram cleared. Major
TN Site integration support. Minor

# Nokia internal use