THERMAX

12-07-2000
DESIGN OF EFFLUENT PIT

PROJECT :- D.M.PLANT FOR SOLVENT DEWAXING / DEOILING UNIT


CLIENT:- INDIAN OIL CORPORATION LTD., DIGBOI
CONSULTANT :- E.I.L., NEW DELHI

GRADE OF CONCRETE :- M20


GRADE OF REINFORCEMENT :- Fe415

Permissible Stresses :
Concrete -

Direct compressive stress = 5 N/mm2


Bending stress = 7 N/mm2

For Water - retaining structures -


Direct Tension = 1.2 N/mm2
Bending Tension = 1.7 N/mm2

Reinforcement steel -
Tensile stress = 230 N/mm2
Compressive stress in column = 190 N/mm2

For Water - retaining structures -


Tensile stress on water face = 150 N/mm2
Tensile stress on face away from water
For members < 225mm thk. = 150 N/mm2
For members > 225mm thk. = 190 N/mm2
Tensile stress in shear = 175 N/mm2

References :

IS codes -
IS 456 - 1978.
IS 875 - 1987.
IS 1893 - 1984.
IS 3370 - 1967.

Books -
Plain and Reinforced Concrete by Jain and Jaikrishna.
(Volume - I and II)

D.M. PLANT FOR SOLVENT


DEWAXING / DEOILING UNIT 1
THERMAX
12-07-2000

DESIGN OF EFFLUENT PIT

DATA : FFL = 26.10


Bottom Level (IL) = 22.00
TWL = 24.50
REF. HPP (EL) = 25.80
Ground water level = 25.80
Width (inside clear) = 9.00 m
Length (inside clear) = 12.00 m
Height of Soil = 3.80 m
Unit Wt. of Soil (gsat) = 18 kN/m3

DESIGN OF COVER SLAB : (CS)


Loadings -
Assume Cover slab 150 mm thick
Loads :
Self wt. of slab = 0.15 x 25 = 3.75 kN/m2
Live load = = 3.00 kN/m2
Total load (w1) = 6.75 kN/m2

Cover slab is designed as Two Way slab

Short Span of slab (lx) = 2.197 m


Long Span of slab (ly) = 3.112 m

Ratio = ly = 1.42
lx
Cover slab is designed as Two Way slab

Bending Moments - (Refer IS 456, Appendix C, Case 1)


Along Short span :
-ve BM at support = 0.0478 x w1 x lx2 = 1.56 kNm
+ve BM at midspan = 0.0366 x w1 x lx2 = 1.19 kNm

Along Long span :


-ve BM at support = 0.032 x w1 x lx2 = 1.04 kNm
+ve BM at midspan = 0.024 x w1 x lx 2
= 0.78 kNm
D.M. PLANT FOR SOLVENT
DEWAXING / DEOILING UNIT 2
THERMAX
12-07-2000

Design BM = Mmax = 1.56 kNm

Thk. reqd. for = Mmax x 106 = 71.19 mm


Uncracked section Q x 103 T'fore OK
(Q= 0.3078 N/mm ) 2

Effective depth provided = d = 121 mm

Reinforcement -

Along Short span :


Ast reqd. for -ve BM = 1.56 x 106 = 95.50 mm2
(at bottom) 150 x 0.9 x 121
Ast reqd. for +ve BM = 1.19 x 106 = 72.85 mm2
(at top) 150 x 0.9 x 121

Along Long span :


Ast reqd. for -ve BM = 1.04 x 106 = 63.67 mm2
(at bottom) 150 x 0.9 x 121
Ast reqd. for +ve BM = 0.78 x 106 = 47.75 mm2
(at top) 150 x 0.9 x 113

Minimum steel reqd. as per IS 3370 in each direction


% Steel = 0.228 %
Ast min = 0.171 x 150 x 1000 = 342 mm2
100
Ast min provided on each face and in each direction = 171.00 mm2

Provide 8F @ 230 c/c (= 217.4 mm2) bothways at top and bottom

D.M. PLANT FOR SOLVENT


DEWAXING / DEOILING UNIT 3
THERMAX
12-07-2000

DESIGN OF COVER BEAMS : (B1,B2,B3,B4 & B5)

Analysis of Grid :

The Grid supporting platform at FFL 26.1 is analysed by STAAD III

Refer Page to of Analysis

Loading on Members -

CASE 1 : FOR ANALYSIS OF GRID and TO WORK COMPRESSIVE REACTION


ON PILE

Members 1,2 -
Udl from Cover slab (CS) = 6.75 x 1.685 = 5.69 kN/m
2
Members 11,12 -
Udl from Cover slab (CS) = 6.75 x 1.484 = 5.01 kN/m
2
Members 3,5 -
Udl from Cover slab (CS) = 6.75 x 0.53 = 1.79 kN/m
2
Members 3, 5 -
Equi. Udl from Cover slab (CS) = 6.75 x 2.197 1 - 1 = 6.19 kN/m
2 3 x 1.422
Members 18 -
D.M. PLANT FOR SOLVENT
DEWAXING / DEOILING UNIT 4
THERMAX
12-07-2000
Eqi. Udl from Cover slab (CS) = 6.75 x 2.197 = 4.94 kN/m
3
Members 5,7 -
Udl from Cover slab (CS) = 6.75 x 1.32 = 4.63 kN/m
2
Members 7,9 -
Udl from Cover slab (CS) = 6.75 x 1.102 = 3.72 kN/m
2
Members 9,11 -
Udl from Cover slab (CS) = 6.75 x 1.131 = 3.82 kN/m
2
Members 1 to 27-
Floor load (within mem 2,12, 14 to 19 & 22 to 26) = 6.75 kN/m2

Member 1,3 -
Pt. Load due to PC = 3.5 kN
(2 Nos on Each member)

Member 2,4 -
Pt. Load due to PC = 3.5 kN
(1 Nos on Each member)

Node 2,5 -
Pt. Load due to PC = 3.5 kN
(1 Nos on Each Node)

Members 5,6,7,8 -
Working wt. of Pump = 8 kN
Dynamic factor = 1.25
Load intensity due = 1.25 x 8 = 7.62 kN/m2
to Pump 0.82 x 1.6
Load intensity due = 0.5 x 25 = 12.50 kN/m2
to Pump foundn

Partial udl from Pump = (7.62 + 12.5 ) x 1.37/2 = 13.78 kN/m


and its foundn

Members 9,11 -
Working wt. of MHL-N = 40.03 kN
Plan area of foundn = A = (p/4) x 1.82 = 2.54 m2
Load intensity due = 40.03 = 15.73 kN/m2
to MHL-N A
Load intensity due = 0.5 x 25 = 12.50 kN/m2
D.M. PLANT FOR SOLVENT
DEWAXING / DEOILING UNIT 5
THERMAX
12-07-2000
to Pump foundn

Partial udl from Pump = (18.29 + 12.5 ) x 1.131/2 = 15.96 kN/m


and its foundn

CASE 2 : FOR ANALYSIS OF GRID and TO WORK TENSILE REACTION


ON PILE DUE TO BUOYANCY

Members 1,2 -
Udl from Cover slab (CS) = 3.75 x 1.685 = 3.16 kN/m
2
Members 11,12 -
Udl from Cover slab (CS) = 3.75 x 1.484 = 2.78 kN/m
2
Members 3,5 -
Udl from Cover slab (CS) = 3.75 x 0.53 = 0.99 kN/m
2
Members 3, 5 -
Equi. Udl from Cover slab (CS) = 3.75 x 2.197 1 - 1 = 3.44 kN/m
2 3 x 1.422
Members 18 -
Eqi. Udl from Cover slab (CS) = 3.75 x 2.197 = 2.74 kN/m
3
Members 5,7 -
Udl from Cover slab (CS) = 3.75 x 1.32 = 2.47 kN/m
2
Members 7,9 -
Udl from Cover slab (CS) = 3.75 x 1.102 = 2.07 kN/m
2
Members 9,11 -
Udl from Cover slab (CS) = 3.75 x 1.131 = 2.12 kN/m
2
Members 1 to 27-
Floor load (within mem 2,12, 14 to 19 & 22 to 26) = 3.75 kN/m2

Member 1,3 -
Pt. Load due to PC = 0.75 kN
(2 Nos on Each member)

Member 2,4 -
Pt. Load due to PC = 0.75 kN
(1 Nos on Each member)

Node 2,5 -
Pt. Load due to PC = 0.75 kN
D.M. PLANT FOR SOLVENT
DEWAXING / DEOILING UNIT 6
THERMAX
12-07-2000
(1 Nos on Each Node)

Members 5,6,7,8 -
Working wt. of Pump = 8 kN

Load intensity due = 8 = 6.09 kN/m2


to Pump 0.82 x 1.6
Load intensity due = 0.5 x 25 = 12.50 kN/m2
to Pump foundn

Partial udl from Pump = (7.62 + 12.5 ) x 1.37/2 = 12.73 kN/m


and its foundn

Members 9,11 -
Working wt. of MHL-N = 2 kN
Plan area of foundn = A = (p/4) x 1.82 = 2.54 m2
Load intensity due = 40.03 = 0.79 kN/m2
to MHL-N A
Load intensity due = 0.5 x 25 = 12.50 kN/m2
to Pump foundn

Partial udl from Pump = (18.29 + 12.5 ) x 1.131/2 = 7.51 kN/m


and its foundn

Beam (B1): (Supporting Priming Chamber)


Mem No. - 1,2,3,4

D.M. PLANT FOR SOLVENT


DEWAXING / DEOILING UNIT 7
THERMAX
12-07-2000
Width of Beam = b = 230 mm
Depth of Beam = D = 400 mm

REFER PAGE OF ANALYSIS FOR RESULTS GIVEN BELOW


Max Hogging BM at Support (Mhog) = 14.61 kNm
(Mem no. 3)
Max Sagging BM at midspan (Msag) = 10.23 kNm
(Mem no. 3)
Max Shear Forec(SF) = 23.24 kN
(Mem no. 3)

Effective depth reqd. -


Beam is designed as Cracked section at support :

Effective depth reqd. = Mhog x 106 = 264.20 mm


Qxb T'fore OK
(Q= 0.91 N/mm2)
Effective depth provided = d = 367 mm

Total depth reqd. -


Beam is designed as Non cracked section at midspan :

Total depth reqd. = Msag x 106 = 380.14 mm


Qxb T'fore OK
(Q= 0.3078 N/mm ) 2

Effective depth provided = d = 367 mm

Reinforcement -
Ast reqd. for Mhog = 14.61 x 106 = 232.80 mm2
at support at top 190 x 0.9 x 367

Ast reqd. for Msag = 10.23 x 106 = 206.48 mm2


at midspan at bottom 150 x 0.9 x 367

Ast min = 0.87 x b x d = 176.96 mm2


fy

Provide 10F - 2 Nos (= 156 mm2) straight bars at bottom


Provide 8F - 2 Nos (= 100 mm2) as Anchor bars at top
Provide 10F - 1 Nos (= 78.5 mm2) curtailed bars at midspan at bottom
Provide 12F - 2 Nos (= 226 mm2) as Extra bars at support bars at top

D.M. PLANT FOR SOLVENT


DEWAXING / DEOILING UNIT 8
THERMAX
12-07-2000

Check for Shear -


Max Shear Force = SF = 23.24 kN
Reinf. provided at support = Ast = 326 mm2
Refer SP 16, Table 80
100Ast = 0.386
bd
Refer SP16, Table 80 -
Perm. shear stress in concrete = tc = 0.266 N/mm2
Nominal shear stress = tv = SF = 0.28 N/mm2
bxd
- t
Design Shear in stirrups = Vs = v c) x b x d
(t = 786.94 N

Use 8F bars as stirrups, ssv = 175 N/mm2


Spacing reqd. = ssv x Asv x d = 8161 mm
Vs
Provide 8F two legged stirrups @ 200 c/c throughout

Beam (B2): (Supporting Pumps)


Mem No. - 5,6,7,8

Width of Beam = b = 230 mm


Depth of Beam = D = 600 mm

REFER PAGE OF ANALYSIS FOR RESULTS GIVEN BELOW


Max Hogging BM at Support (Mhog) = 35.89 kNm
(Mem no. 8)
Max Sagging BM at midspan (Msag) = 16.16 kNm
(Mem no. 5)
Max Shear Forec(SF) = 36.42 kN
(Mem no. 5)

Effective depth reqd. -


Beam is designed as Cracked section at support :

Effective depth reqd. = Mhog x 106 = 414.10 mm


Qxb T'fore OK
(Q= 0.91 N/mm2)

D.M. PLANT FOR SOLVENT


DEWAXING / DEOILING UNIT 9
THERMAX
12-07-2000
Effective depth provided = d = 567 mm

Total depth reqd. -


Beam is designed as Non cracked section at midspan :

Total depth reqd. = Msag x 106 = 477.77 mm


Qxb T'fore OK
(Q= 0.3078 N/mm ) 2

Effective depth provided = d = 567 mm

Reinforcement -
Ast reqd. for Mhog = 35.98 x 106 = 370.16 mm2
at support at top 190 x 0.9 x 567

Ast reqd. for Msag = 16.16 x 106 = 211.12 mm2


at midspan at bottom 150 x 0.9 x 567

Ast min = 0.87 x b x d = 273.39 mm2


fy

Provide 12F - 2 Nos (= 226 mm2) straight bars at bottom


Provide 10F - 2 Nos (= 156 mm2) as Anchor bars at top
Provide 10F - 1 Nos (= 78.5 mm2) curtailed bars at midspan at bottom
Provide 12F - 2 Nos (= 226 mm2) as Extra bars at support bars at top

Check for Shear -


Max Shear Force = SF = 36.42 kN
Reinf. provided at support = Ast = 382 mm2
Refer SP 16, Table 80
100Ast = 0.293
bd
Refer SP16, Table 80 -
Perm. shear stress in concrete = tc = 0.237 N/mm2
Nominal shear stress = tv = SF = 0.28 N/mm2
bxd
Design Shear in stirrups = Vs = (tv - tc) x b x d = 5512.83 N

Use 8F bars as stirrups, ssv = 175 N/mm2


Spacing reqd. = ssv x Asv x d = 1800 mm
Vs
Provide 8F two legged stirrups @ 200 c/c throughout

D.M. PLANT FOR SOLVENT


DEWAXING / DEOILING UNIT 10
THERMAX
12-07-2000

Beam (B3): (Supporting MHL-N Tank)


Mem No. - 9,10,11,12

Width of Beam = b = 230 mm


Depth of Beam = D = 400 mm
Span = l = 3.112 m

REFER PAGE OF ANALYSIS FOR RESULTS GIVEN BELOW


Max Hogging BM at Support (Mhog) = 19.6 kNm
(Mem no. 9)
Max Sagging BM at midspan (Msag) = 14.2 kNm
(Mem no. 11)
Max Shear Forec(SF) = 41.87 kN
(Mem no. 11)

Effective depth reqd. -


Beam is designed as Cracked section at support :

Effective depth reqd. = Mhog x 106 = 306.02 mm


Qxb T'fore OK
(Q= 0.91 N/mm2)
Effective depth provided = d = 367 mm

Total Depth required -


Beam is designed as Non cracked section at midspan :

1131.000
(bf)
150

250

230

lo = 0.7 x l = 2178.4 m
bf = (lo/6) + bw + 6Df = 1493.07 mm
bf (available) = 1131.00 mm
Area of crossection of 'T' beam = 227150 mm2
Location of C.G of section from top = yt = 125.63 mm
Location of C.G of section from bottom = yb = 274.37 mm
Moment of Inertia @ Axis through C.G. = I = 9525000000 mm4

D.M. PLANT FOR SOLVENT


DEWAXING / DEOILING UNIT 11
THERMAX
12-07-2000

Modulus of Section = zb = I / yb = 34715895 mm3


Msag = 14200000 Nmm
(tension at top)
sbt = Msag = 0.409 N/mm2
zb < 1.7 N/mm2
Hence SAFE

Reinforcement -
Ast reqd. for Mhog = 19.6 x 106 = 312.32 mm2
at support at top 190 x 0.9 x 367

Ast reqd. for Msag = 14.2 x 106 = 286.61 mm2


at midspan at bottom 150 x 0.9 x 367

Ast min = 0.87 x b x d = 176.96 mm2


fy

Provide 12F - 2 Nos (= 226 mm2) straight bars at bottom


Provide 8F - 2 Nos (= 100 mm2) as Anchor bars at top
Provide 10F - 1 Nos (= 78.5 mm2) curtailed bars at midspan at bottom
Provide 12F - 2 Nos (= 226 mm2) as Extra bars at support bars at top

Check for Shear -


Max Shear Force = SF = 41.87 kN
Reinf. provided at support = Ast = 326 mm2
Refer SP 16, Table 80
100Ast = 0.386
bd
Refer SP16, Table 80 -
Perm. shear stress in concrete = tc = 0.266 N/mm2
Nominal shear stress = tv = SF = 0.50 N/mm2
bxd
Design Shear in stirrups = Vs = (tv - tc) x b x d = 19416.94 N

Use 8F bars as stirrups, ssv = 175 N/mm2


Spacing reqd. = ssv x Asv x d = 331 mm
Vs
Provide 8F two legged stirrups @ 200 c/c throughout

D.M. PLANT FOR SOLVENT


DEWAXING / DEOILING UNIT 12
THERMAX
12-07-2000
Beam (B4):
Mem No. - 13 to 20 & 28

Width of Beam = b = 300 mm


Depth of Beam = D = 750 mm
Span = l = 3.167 m

REFER PAGE OF ANALYSIS FOR RESULTS GIVEN BELOW


Max Hogging BM at Support (Mhog) = 75.09 kNm
(Mem no. 17)
Max Sagging BM at midspan (Msag) = 49.27 kNm
(Mem no. 14)
Max Shear Forec(SF) = 96.85 kN
(Mem no. 28)

Effective depth reqd. -


Beam is designed as Cracked section at support :

Effective depth reqd. = Mhog x 106 = 524.46 mm


Qxb T'fore OK
(Q= 0.91 N/mm2)
Effective depth provided = d = 717 mm

Total Depth required -


Beam is designed as Non cracked section at midspan :

1569.483
(bf)
150

600

300

lo = 0.7 x l = 2216.9 m
bf = (lo/6) + bw + 6Df = 1569.48 mm

D.M. PLANT FOR SOLVENT


DEWAXING / DEOILING UNIT 13
THERMAX
12-07-2000
bf (available) = 1998.00 mm
Area of crossection of 'T' beam = 415422.5 mm2
Location of C.G of section from top = yt = 237.49 mm
Location of C.G of section from bottom = yb = 512.51 mm
Moment of Inertia @ Axis through C.G. = I = 2.02E+10 mm4
Modulus of Section = zb = I / yb = 39413865 mm3
Msag = 49270000 Nmm
(tension at top)
sbt = Msag = 1.250 N/mm2
zb < 1.7 N/mm2
Hence SAFE

Reinforcement -
Ast reqd. for Mhog = 75.09 x 106 = 612.44 mm2
at support at top 190 x 0.9 x 717

Ast reqd. for Msag = 49.27 x 106 = 509.01 mm2


at midspan at bottom 150 x 0.9 x 717

Ast min = 0.87 x b x d = 450.93 mm2


fy

Provide 16F - 2 Nos (= 402 mm2) straight bars at bottom


Provide 12F - 2 Nos (= 226 mm2) as Anchor bars at top
Provide 16F - 1 Nos (= 201 mm2) curtailed bars at midspan at bottom
Provide 16F - 2 Nos (= 402 mm2) as Extra bars at support bars at top

Check for Shear -


Max Shear Force = SF = 96.85 kN
Reinf. provided at support = Ast = 628 mm2
Refer SP 16, Table 80
100Ast = 0.292
bd
Refer SP16, Table 80 -
Perm. shear stress in concrete = tc = 0.237 N/mm2
Nominal shear stress = tv = SF = 0.45 N/mm2
bxd
Design Shear in stirrups = Vs = (tv - tc) x b x d = 45871.30 N

Use 8F bars as stirrups, ssv = 175 N/mm2


Spacing reqd. = ssv x Asv x d = 274 mm
Vs
Provide 8F two legged stirrups @ 200 c/c throughout

D.M. PLANT FOR SOLVENT


DEWAXING / DEOILING UNIT 14
THERMAX
12-07-2000

Beam (B5):
Mem No. - 21 to 27

Width of Beam = b = 300 mm


Depth of Beam = D = 750 mm

REFER PAGE OF ANALYSIS FOR RESULTS GIVEN BELOW


Max Sagging BM at midspan (Msag) = 29.18 kNm
(Mem no. 25)
Max Shear Forec(SF) = 21.12 kN
(Mem no. 21)

Effective depth reqd. -


Beam is designed as Cracked section at support :

Effective depth reqd. = Msag x 106 = 562.14 mm


Qxb T'fore OK
(Q= 0.3078 N/mm2)
Effective depth provided = d = 717 mm

Reinforcement -
Ast reqd. for Msag = 29.18 x 106 = 301.46 mm2
at midspan at bottom 150 x 0.9 x 717

Ast min = 0.87 x b x d = 450.93 mm2


fy

Provide 12F - 2 Nos (= 226 mm2) straight bars at bottom


Provide 10F - 2 Nos (= 156 mm2) as Anchor bars at top
Provide 10F - 2 Nos (= 156 mm2) curtailed bars at midspan at bottom
Provide 10F - 2 Nos (= 156 mm2) as Extra bars at support bars at top

Check for Shear -


Max Shear Force = SF = 21.12 kN
Reinf. provided at support = Ast = 312 mm2
Refer SP 16, Table 80
100Ast = 0.145
bd

D.M. PLANT FOR SOLVENT


DEWAXING / DEOILING UNIT 15
THERMAX
12-07-2000

Refer SP16, Table 80 -


Perm. shear stress in concrete = tc = 0.2 N/mm2
Nominal shear stress = tv = SF = 0.10 N/mm2
bxd
Design Shear in stirrups = Vs = (tv - tc) x b x d = -21900.00 N

Use 8F bars as stirrups, ssv = 175 N/mm2


Spacing reqd. = ssv x Asv x d = Min mm
Vs
Provide 8F two legged stirrups @ 200 c/c throughout

DESIGN OF COLUMNS : (C)

For results of analysis of GRID the maximum Axial force


on Column = 187 kN

Design of Column - Refer Page no. 15 and 16

D.M. PLANT FOR SOLVENT


DEWAXING / DEOILING UNIT 16
THERMAX
12-07-2000

D.M. PLANT FOR SOLVENT


DEWAXING / DEOILING UNIT 17
PROJECT
FFFFFFFFFF FFFFF & FFFFFFFFFF FFFFFFFFFF
FF FFFFF FFFFFFF FFFFFFF

CLIENT
FFF FFFF FFFF & FFFFF FF. FFF.

CONTRACTOR
FFFFFFF FFF.
FFFFF & FFFFF FFFFFFFFF
FFFF.

DOCUMENT NO. : WWS/7324/PBW_PS


NO. OF PAGES : 12(DESIGN) + 1(FIG.) +
7(STAADIII OUTPUT)
Rev. : 0
Date. : 5-Jan-04
THERMAX LTD.

DESIGN OF PUMP SHED

DESIGN DATA :
Span of rafter = 4.50 m

Wind Pressure -
Vb = 47 m/s
Vz = k1 x k2 x k3 xVb
= 1.07 x 1.00 x 1 x 47 = 50.29 m/s

pz = 0.6 Vz2 = 1517.5 N/m2


1.517 KN/m2
Design wind pressure pd = 1517 N/m2
= 1.517 kN/m2
Max. spacing of frames B = 6.70 m

Earthquake Coeff. -
Earthquake Zone II
ah = b I ao
= 1 x 1.5 x 0.02
= 0.03

DESIGN CALCULATIONS :
q = 4 o

1. DESIGN OF PURLIN

Max. spacing of purlins s = 1.500 m

Dead load on purlin -


Weight of sheeting = 0.16 kN/m2
Total = qs = 0.16 kN/m2

Dead load on purlins ws = qs s = 0.240 kN/m


Self weight = 0.225 kN/m
DL = 0.47 kN/m
Total dead load on purlin = Wd = 3.12 kN
Live load on purlin -
Live load on purlins wl = 0.75 s = 1.13 kN/m
Total live load on purlin = Wl = 7.54 kN
Total DL+LL = Wd+l = 10.65 kN

TISCO 19
THERMAX LTD.

As per IS875 code, Table 7,


Wind Coefficient on roof with q(deg) = 3.50 deg
Cpe = -0.7 0.061087 Rad.
Cpi = 0.4

Wind parallel to ridge causes a total outward pressure


= coeff. x pd x A
= 10.68 kN OR 6.10
Bending Moments -
Purlin is subjected to biaxial bending by dead load and uniaxial by wind load.
Mdx = Wd cosq B = 2.60 kNm
8
Mlx = Wl cosq B = 6.30 kNm
8
Mdy = Wd+l sinq B = 0.54 kNm
8
Mwx = Ww B = 8.94 kNm 5.11 kNm
8
Moment for Moment for
outward inward
Design Moments - pressure pressure
Mx = Mdx + Mwx = = -6.34 kNm 7.71
or Md+lx = 8.91
My = Mdy = = 0.54 kNm

Y
Considering ISMC 200 ISMC 200
Zxx = 181900 mm3 X X
Zyy = 26300 mm3
Ixx = 18193000 mm4 Y
Check for Stress in purlin -
Mx My
Zxx Zyy
= 69.67 N/mm2 < 165 N/mm2 hence safe.
Check for deflection -
wdef. = 1.98 kN/m
D = 14.31 mm < 20.62 mm hence safe.

Loading on Frame -
Dead load from purlins = 1.56 kN
Live load = 3.77 kN
Wind load from purlins = 5.34 kN upward
3.05 kN downward

The truss along with the supporting columns is analysed and designed on
STAADIII package

TISCO 20
THERMAX LTD.

For results refer enclosed sheets

TISCO 21
THERMAX LTD.

2. DESIGN OF 1T CAPACITY MONORAIL :

Point load due to Monorail = 20 kN


Add @ 25% for impact = 5 kN
T'fore total point load = P = 25 kN

Clear Span of Monorail = L = 2.784 m

Try ISMB 250


Self wt. of ISMB = w = 0.254 kN/m
Max BM = P x L + w x L2 = 17.6 kNm
4 10
Max Reaction = P+ wxL = 12854 N
2
Properties of ISMB 250 :
D = 250 mm
d1 = 194.1 mm
ry = 26.5 mm
T = 12.5 mm
tw = 6.9 mm
Ixx = 5132 cm4
Zxx = 410.5 cm3
fy = 250 N/mm2
Modulus of Elasticity = E = 200000 N/mm2

T = 1.812 < 2.0


tw
d1 = 28.130 < 85
tw
Refer IS 800, Table No. 6.1.B
For D = 18.00
T
L = 105 Say 300
ry
Max. permissible bending stress = sbc = 81 N/mm2

Check for Section Modulus -


Section Modulus reqd. = Zreqd = Max BM = 217.28 cm3
sbc < Zxx , T'fore OK

Check for deflection -


Dperm = L = 3.712 mm
750
Dactual = 5 x wL4 + WL3 = 1.114 mm

TISCO 3
THERMAX LTD.

384 x EIxx 48 x EIxx < Dperm , T'fore OK


3. DESIGN OF RAFTER :

Max BM = = 12.56 KNm


( Refer Analysis result )
Max Reaction = = 19.52 KN
( Refer Analysis result )
Properties of ISMC 200 :
D = 200 mm
d1 = 150.2 mm
ry = 22.3 mm
T = 11.4 mm
tw = 6.1 mm
Ixx = 1819.3 cm4
Zxx = 181.9 cm3
fy = 250 N/mm2
Modulus of Elasticity = E = 200000 N/mm2

T = 1.869 < 2.0


tw
d1 = 24.623 < 85
tw

Effective length of compression flange = 1.5 m

Refer IS 800, Table No. 6.1.B


For D = 17.54
T
L = 67
ry
Max. permissible bending stress = sbc = 147 N/mm2

Check for Section Modulus -


Section Modulus reqd. = Zreqd = Max BM = 85.44 cm3
sbc < Zxx , T'fore OK

Check for deflection -


Dperm = L = 20.000 mm
325
Actual Staad deflection = mm
Therefore safe.

TISCO 4