COVER SHEET

PREPARED BY CHECKED BY APPROVED BY


REV.
NO. DATE DESCRIPTION

INTLS. SIGN. INTLS. SIGN. INTLS. SIGN.

0 29/06/15 FIRST SUBMISSION ABB HC SKS

1 03/08/15 Revised as per NTPC comment ABB HC SKS

PROJECT:
SCCL COAL BASED THERMAL POWER
PLANT (2X600 MW)
OWNER:
THE SINGARENI COLLIERIES COMPANY
LTD.

PREPARED ABB OWNER’S


BY: CONSULTANT:
NTPC LIMITED
CHECKED HC (A GOVERNMENT OF INDIA ENTERPRISE)
CONSULTANT WING
BY:

APPROVED SKS CONTRACTOR:


BY:

DATE:
McNally Bharat Engineering Company Limited
ECOSPACE BUSINESS PARK,
03/08/15 CAMPUS-2B, NEW TOWN, RAJARHAT, KOLKATA-700156
Digitally signed
Signature Not
by PVerified
R SEN
Date: 2015.08.07
MBE JOB NO.: 14:39:17
BP05IST
Reason: CAT I
. THIS DOCUMENT IS Location:
PROPERTY OF MBE AND NTPCEOC
MUST NOT BE USED EXCEPT Data Sheet and Dwgs of Transformer for NO. OF REV.
IN CONNECTION WITH WORK DOCUMENT TITLE: SHEETS NO.
OF MBE. REPRODUCTION, VFD (HCSD)
USE OR DISCLOSURE OF
THE CONTENTS OF THIS
DOCUMENT TO THIRD
PARTY/IES WITHOUT NTPC DOC. NO.: 9661-162-PVE-Y-001 1
EXPRESS / WRITTEN
PERMISSION OF MBE IS
STRICTLY PROHIBITTED 15
MBE DOC. NO.: 2-BP05-VDAHP-3-004 1
Title Reply Sheet
Customer Mbe_NTPC Singareni
Project

Sale order No 4201004970

Sl. No. COMMENTS FROM CUSTOMER ABB REPLY Customer response

Mention the following in Datasheet


1 Zero sequence impedance Noted & incorporated in the revised datasheet
2 Iron losses at rated voltage. Noted & incorporated in the revised datasheet
3 Copper losses at full load. Noted & incorporated in the revised datasheet
4 Withstand time for short ckt at terminals. Noted & incorporated in the revised datasheet
5 Over excitation withstand time (Sec). Noted & incorporated in the revised datasheet
6 HV and LV winding DC resistance at 75deg.C/Ph. at
Noted & incorporated in the revised datasheet
principal tap, MAx tap and Min. Tap.
7 Total quantity of oil (liters) Noted & incorporated in the revised datasheet
8 Tap changing equipment details. Noted & incorporated in the revised datasheet
9 Insulation level of HV winding and LV winding,HV and LV
Noted & incorporated in the revised datasheet
bushings and Neutral bushing.
10 Permissible overloading Noted & incorporated in the revised datasheet
11 Clearances Noted & incorporated in the revised datasheet
a. Min clearance of HV winding to tank in oil (mm) Noted & incorporated in the revised datasheet
b. Min. clearance of HV wdg to earth in oil. Noted & incorporated in the revised datasheet
c. Clearances between coil and core. Noted & incorporated in the revised datasheet
d. Clearances between neutral and ground in air. Noted & incorporated in the revised datasheet
12 Conservator details Noted & incorporated in the revised datasheet
13 Capacitance values. Noted & incorporated in the revised datasheet
14 Oil details. Noted & incorporated in the revised datasheet
15 Core details. Noted & incorporated in the revised datasheet
16 winding details. Noted & incorporated in the revised datasheet
17 Tank details Noted & incorporated in the revised datasheet
18 Efficiency ay unity power factor and 0.8 PF. Noted & incorporated in the revised datasheet
19 .% regulation details. Noted & incorporated in the revised datasheet