dk;Z dk xzsoy jksM xzke v.

Mksy dh iz/kkuea=h lMd ls laxzkeiqj rd


xzke vUMksy] laxzkeiqj xzke iapk;r
vUMksy
Lenth 2700 m tuin iapk;rlkaph
S. S.O.R.
Item No. Length Width Depth Quantity Unit Rate Amount
No. Item No.
1 2 3 4 5 6 7 8 9 10 11
1 0102 Jungle clearance including uprooting of
(Apply rank vegetation, grass, brush wood,
Distt.
SOR)
saplings and tree not exceeding 30cm girth
and removing not exceeding 50meters 1 2700 10 0 27000 Sqm 4.3 116100
outside the periphery of the area cleared.
Embankment
2 1802 Collection of approved soil having CBR not
(Apply less than 5, including stacking at quarry 1 2700 (9.5+8.3)/2 0.3 7209 Cum
Distt. 7209 Cum 94.5 681251
SOR)
3 1902 (f) Transportation i/c Loading and Unloading (av
(Apply Lead km as shown below)
Distt.
7209 Cum 104.22 751322
SOR) 5
4 1818 (a) Stacking without boxing.
(Apply
Distt.
SOR) 7209 Cum 11 79299
5 2041 Compaction of embankment with approved
materials, already collected and spreaded at
site, obtained from roadway cutting, excavated
from drains, foundation of other structures or
from borrow pit, making longitudinal and cross
fall (Grade & camber) by tractor mounted
grader, watering at OMC and compacted by
rollers of 80 to 100 kN static weight to meet
requirements of table 300.1 and 300.2 and 7209 Cum 18.4 132646
clause
Subgrade301.4 & 301.5 of pecifications for rural
roads, i/c all leads and lifts etc. complete.
6 1802 Collection of approved soil having CBR not
(Apply less than 5, including stacking at quarry
Distt.
SOR) 1 2700 (9.5+8.3)/2 0.3 6237 Cum 94.5 589397
7 1902 (f) Transportation i/c Loading and Unloading (av
(Apply Lead km as shown below)
Distt. 1 2700 (8.3+7.1)/2 0.3 6237 Cum 104.22 650020
SOR) 5
8 1818 (a) Stacking without boxing.
(Apply
Distt.
SOR) 1 2700 (8.3+7.1)/2 0.3 6237 Cum 11 68607
9 2043 Compaction of soil for construction of
subgrade & earthen shoulders with approved
transported material collected and stacked at
site, i/c spreading, making proper grade and
camber by tractor mounted grader or manual
labour, watering at OMC and compacted by
rollers of 80 to 100kN static weight to achieve
density atleast 100% of the MDD as per
IS:2720 (Part-7), as per clause 303 of 1 2700 (8.3+7.1)/2 0.3 6237 Cum 23 143451
specifications
GRAVEL for rural roads, i/c all leads and
10 2048
lifts etc. complete.
Construction of gravel base course by
naturally occurred gravel or river born
material or by crushed metal or mixture of two
or more to bring the material in appropriate
grading confirming to clause 2.2.2.2, plasticity
characteristics of fines as per clause 2.2.3 of
IRC:SP:77-2008 and CBR not less then 80,
having Liquid Limit and Plasticity Index less
than 25 and 10 respectively, mixing by mix in
place method on prepared surface, spreading
in uniform layers with tractor mounted grader,
watering at OMC and compacting with roller
of 80-100 kN static weight to achieve density
atleast 100% of the MDD as per IS:2720
1 2700 3 0.225 1822.5 Cum 468 852930
(Part-7), as per specifications for rural roads
clause 402, i/c all leads and lifts etc.complete.
S. S.O.R.
Item No. Length Width Depth Quantity Unit Rate Amount
No. Item No.
1 2 3 4 5 6 7 8 9 10 11
11 2049 Construction of gravel surface course by
naturally occurred gravel or river born material
or by crushed metal or mixture of two or more
in appropriate grading confirming to clause
2.2.2.2, plasticity characteristics of fines as per
clause 2.2.3 of IRC:SP:77-2008, having Liquid
Limit less than 25 and Plasticity index should
range between 6-15, mixing by mix in place
method on prepared surface, spreading in
uniform layers with tractor mounted grader
watering at OMC and compacting with roller of
80-100 kN static weight to achieve density
atleast 100% of the MDD as per IS:2720 (Part-
7), as per specifications for rural roads clause 1 2700 3 0.05 405 Cum 360.4 145962
402,
Eartheni/c Shoulders
12 1802 all leads and
Collection of lifts etc. complete.
approved soil having CBR not
(Apply less than 5, including stacking at quarry
Distt.
SOR) 1 2700 {(7.1+6.4)/2-3} 0.175 1771.88 Cum 94.5 167442
13 1902 (f) Transportation i/c Loading and Unloading (av
(Apply Lead km as shown below )
Distt.
1 2700 {(7.1+6.4)/2}-3 0.175 1771.88 Cum 104.22 184665
SOR)
5
14 1818 (a) Stacking without boxing.
(Apply
Distt.
SOR)
1 2700 {(7.1+6.4)/2}-3 0.175 1771.88 Cum 11 19490.625
15 2043 Compaction of soil for construction of
subgrade & earthen shoulders with approved
transported material collected and stacked at
site, i/c spreading, making proper grade and
camber by tractor mounted grader or manual
labour, watering at OMC and compacted by
rollers of 80 to 100kN static weight to achieve
density atleast 100% of the MDD as per
IS:2720 (Part-7), as per clause 303 of
specifications for rural roads, i/c all leads and 1 2700 {(7.1+6.4)/2}-3 0.175 1771.88 Cum 23 40753
lifts
Hardetc. complete.
Shoulder
16 1803 Collection of approved soil having CBR not
(Apply less than 12, including stacking at quarry
Distt.
SOR) 1 2700 {(6.4+6)/2-3} 0.1 864 Cum 110.2 95213
17 1902 (j) Transportation i/c Loading and Unloading (av
(Apply Lead km as shown below)
Distt.
SOR) 1 2700 (6.4+6)/2-3 0.1 864 Cum 191.52 165473.28
20
18 1818 (a) Stacking without boxing.
(Apply
Distt.
SOR) 1 2700 (6.4+6)/2-3 0.1 864 Cum 11 9504
19 2045 Construction of hard shoulder collected at site,
(Apply i/c making cross fall 4-5% (camber) by tractor
Distt. mounted grader, watering at OMC and
SOR) compacted by rollers of 80 to 100kN static
weight to achieve density atleast 100% of the
MDD as per IS:2720 (Part-7),as per clause
407 of specifications for rural roads i/c all
leads and lifts etc. complete.
1 2700 (6.4+6)/2-3 0.1 864 Cum 30.8 26611.2
Total 4920136
Work Charge and Contigency 3.5% 172205
For Karmkar Mandal 1%
49201
Tender Rate Above 20 %
984027
GRAND TOTAL 6125569
SAY Rs. In Laks 61.26
Percentage %

mi;a=h
tuin iapk;r
dk;Z dk xzsoy jksM lu[ksMh xqyfj;k ds ?kj gksrs gq, fctksh Vksyk ls fo'ku[ksMk rd
xzke lu[ksMh xzke iapk;r
lu[ksMh
Lenth 2800 m tuin iapk;rlkaph
S. S.O.R.
Item No. Length Width Depth Quantity Unit Rate Amount
No. Item No.
1 2 3 4 5 6 7 8 9 10 11
1 0102 Jungle clearance including uprooting of
(Apply rank vegetation, grass, brush wood,
Distt.
SOR)
saplings and tree not exceeding 30cm girth
and removing not exceeding 50meters 1 2800 10 0 28000 Sqm 4.3 120400
outside the periphery of the area cleared.
Embankment
2 1802 Collection of approved soil having CBR not
(Apply less than 5, including stacking at quarry 1 2800 (9.5+8.3)/2 0.3 7476 Cum
Distt. 7476 Cum 94.5 706482
SOR)
3 1902 (f) Transportation i/c Loading and Unloading (av
(Apply Lead km as shown below)
Distt.
7476 Cum 104.22 779149
SOR) 5
4 1818 (a) Stacking without boxing.
(Apply
Distt.
SOR) 7476 Cum 11 82236
5 2041 Compaction of embankment with approved
materials, already collected and spreaded at
site, obtained from roadway cutting, excavated
from drains, foundation of other structures or
from borrow pit, making longitudinal and cross
fall (Grade & camber) by tract

7476 Cum 18.4 137558


Subgrade
6 1802 Collection of approved soil having CBR not
(Apply less than 5, including stacking at quarry
Distt.
SOR) 1 2800 (9.5+8.3)/2 0.3 6468 Cum 94.5 611226
7 1902 (f) Transportation i/c Loading and Unloading (av
(Apply Lead km as shown below)
Distt. 1 2800 (8.3+7.1)/2 0.3 6468 Cum 104.22 674095
SOR) 5
8 1818 (a) Stacking without boxing.
(Apply
Distt.
SOR) 1 2800 (8.3+7.1)/2 0.3 6468 Cum 11 71148
9 2043 Compaction of soil for construction of
subgrade & earthen shoulders with approved
transported material collected and stacked at
site, i/c spreading, making proper grade and
camber by tractor mounted grader or manual
labour, watering at OMC and compacted b

1 2800 (8.3+7.1)/2 0.3 6468 Cum 23 148764


GRAVEL
10 2048 Construction of gravel base course by
naturally occurred gravel or river born
material or by crushed metal or mixture of two
or more to bring the material in appropriate
grading confirming to clause 2.2.2.2, plasticity
characteristics of fines as per clau

1 2800 3 0.225 1890 Cum 468 884520


S. S.O.R.
Item No. Length Width Depth Quantity Unit Rate Amount
No. Item No.
1 2 3 4 5 6 7 8 9 10 11
11 2049 Construction of gravel surface course by
naturally occurred gravel or river born material
or by crushed metal or mixture of two or more
in appropriate grading confirming to clause
2.2.2.2, plasticity characteristics of fines as per
clause 2.2.3 of IRC:SP:

1 2800 3 0.05 420 Cum 360.4 151368


Earthen Shoulders
12 1802 Collection of approved soil having CBR not
(Apply less than 5, including stacking at quarry
Distt.
SOR) 1 2800 {(7.1+6.4)/2-3} 0.175 1837.5 Cum 94.5 173644
13 1902 (f) Transportation i/c Loading and Unloading (av
(Apply Lead km as shown below )
Distt.
1 2800 {(7.1+6.4)/2}-3 0.175 1837.5 Cum 104.22 191504
SOR)
5
14 1818 (a) Stacking without boxing.
(Apply
Distt.
SOR)
1 2800 {(7.1+6.4)/2}-3 0.175 1837.5 Cum 11 20212.5
15 2043 Compaction of soil for construction of
subgrade & earthen shoulders with approved
transported material collected and stacked at
site, i/c spreading, making proper grade and
camber by tractor mounted grader or manual
labour, watering at OMC and compacted b

1 2800 {(7.1+6.4)/2}-3 0.175 1837.5 Cum 23 42263


Hard Shoulder
16 1803 Collection of approved soil having CBR not
(Apply less than 12, including stacking at quarry
Distt.
SOR) 1 2800 {(6.4+6)/2-3} 0.1 896 Cum 110.2 98739
17 1902 (j) Transportation i/c Loading and Unloading (av
(Apply Lead km as shown below)
Distt.
SOR) 1 2800 (6.4+6)/2-3 0.1 896 Cum 191.52 171601.92
20
18 1818 (a) Stacking without boxing.
(Apply
Distt.
SOR) 1 2800 (6.4+6)/2-3 0.1 896 Cum 11 9856
19 2045 Construction of hard shoulder collected at site,
(Apply i/c making cross fall 4-5% (camber) by tractor
Distt. mounted grader, watering at OMC and
SOR) compacted by rollers of 80 to 100kN static
weight to achieve density atleast 100% of the
MDD as per IS:2720 (Part-7),as per

1 2800 (6.4+6)/2-3 0.1 896 Cum 30.8 27596.8


Total 5102363
Work Charge and Contigency 3.5% 178583
For Karmkar Mandal 1%
51024
Tender Rate Above 20 %
1020473
GRAND TOTAL 6352442
SAY Rs. In Laks 63.52
Percentage %

mi;a=h
tuin iapk;r
rduhdh izfrosnu
1 dk;Z dk uke %&xzsoy jksM xzke v.Mksy dh iz/kkuea=h lMd ls laxzkeiq

2 dqy yackbZ %& 2700 fdeh-

3 xzke %&vUMksy] laxzkeiqj

4 xzke iapk;r %&vUMksy

5 tuin iapk;r 3 %&lkaph

6 vuqekfur ykxr %& 61.26 yk[k esa

7 vko';drk %&o"kkZ _rq esa Hkh vkokxeu dh


lqqfo/kk cuh jgsxh rFkk jkstxkj pkgus
okys xzkeh.kksa dks jkstxkj Hkh
8 rduhdh Lohd`frdrkZ vf/kd %&eksfg;k
dk;Zikyugks
;a=hldsxkA
xzk-;ka-lssok laHkkx jk;lsu
9 iz'kkldh; Lohd`frdrkZ vf/k %&dysDVj jk;lsu
10 ekinaM %&ckjgeklh lM+d ;kstuk vUrxZr
izko/kkfud ekinaM vuqlkj izkDdyu rS;kj
fd;k x;k gSA
11 njs %&iapk;r ,oa xzkeh.k fodkl foHkkx e-iz-
'kklu Hkksiky }kjk izpfyr fnukad 12-4-
2010 ,l-vks-vkj- ,oa vkt rd la'kksf/kr nj
ds vk/kkj ij izkDyu rS;kj fd;k x;kA

mi;a=h
tuin iapk;r
ftyk jk;lsu
=h lMd ls laxzkeiqj rd

Hkkx jk;lsu
rduhdh izfrosnu
1 dk;Z dk uke %&xzsoy jksM lu[ksMh xqyfj;k ds ?kj gksrs gq,
fctksh Vksyk ls fo'ku[ksMk rd

2 dqy yackbZ %& 2800 fdeh-

3 xzke %&lu[ksMh

4 xzke iapk;r %&lu[ksMh

5 tuin iapk;r 3 %&lkaph

6 vuqekfur ykxr %& 63.52 yk[k esa

7 en %&

8 vko';drk %&o"kkZ _rq esa Hkh vkokxeu dh lqqfo/kk


cuh jgsxh rFkk jkstxkj pkgus okys
xzkeh.kksa dks jkstxkj Hkh eksfg;k gks
ldsxkA
9 rduhdh Lohd`frdrkZ vf/kd %&dk;Zikyu ;a=h xzk-;ka-lssok laHkkx jk;lsu

10 iz'kkldh; Lohd`frdrkZ vf/k %&dysDVj jk;lsu

11 ekinaM %&ckjgeklh lM+d ;kstuk vUrxZr izko/kkfud


ekinaM vuqlkj izkDdyu rS;kj fd;k x;k gSA
12 njsa %&iapk;r ,oa xzkeh.k fodkl foHkkx e-iz-
'kklu Hkksiky }kjk izpfyr fnukad 12-4-
2010 ,l-vks-vkj- ,oa vkt rd la'kksf/kr nj
ds vk/kkj ij izkDyu rS;kj fd;k x;kA

mi;a=h
tuin iapk;r
ftyk jk;lsu