Unit testing Procedure Instructions & Test


Results

Unit Testing Document -1-


“UNIFY”
Unit testing Procedure Instructions & Test
Results

TEST DETAILS
TEST SCENARIO ID CYIENT_QM 02 _ Master Inspection characteristics.

SCENARIO Master Inspection characteristics creation/change/Display.


SAP CLIENT CYIENT
CREATOR PeddiReddy.G
TESTER PeddiReddy.G
EXECUTION DATE 17.08.2018

TEST DATA

DATA OBJECT VALUE / CODE DESCRIPTION COMMENTS AND NOTES


MIC. Zlength Length
Plant 1102 Cyient DLM - Unit-2 DTA

Unit Testing Document -2-


“UNIFY”
Unit testing Procedure Instructions & Test
Results

TRANSACTIONAL STEPS: -

OUTPUT
INPUT DATA / DATA / Pass
No. PROCESS STEPS T code Test Result
SPECIAL INFORMATION ACTUAL (Y/N)
RESULT

1 Master Inspection QS21 Data will be “ZLength” Y


characteristics  Select Plant.: 1102 saved. MIC is
creation  Create Master Inspection characteristic.: ZLength created.
 Valid from.
 Select quantitative char.: tick
 Status: Released
 Select Reference characteristic
 Lower specif Limit: 1 and Upper specif Limit :10
 Enter & Save.

2 Master Inspection QS23  Select Plant: 1102 Data should be “ZLength” Y


characteristics  Enter Master Inspection characteristic: ZLength change. MIC is
change  Execute Changed.
 Change the data and save

3 Master Inspection QS24  Select Plant. Data should be “ZLength” Y


Characteristics  Enter Master Inspection characteristic. Display. MIC is
Display  Execute Displayed.

COMMENTS: -
……………………………………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………………………………....

Sign-off: (Tester/Team Member Name and sign) ______________________________ Date: __/__/____

Unit Testing Document -3-


“UNIFY”
Unit testing Procedure Instructions & Test
Results

Unit Testing Document -4-