Power consumtion during regular days

Items Nos
Tube lights 39 40 1560
Fans 20 60 1200
5HP motors 2 3250 6500
1HP motor 5 750 3750
3HP motor for RO plant 3 2250 6750
200Wts at construction area 3 200 600
1000wts at construction area 4 1000 4000
24360

Power consumtion
Items Nos
1000wts focus lights 15 1000 15000
100wts LED lights 25 100 2500
400wts day lights 2 400 800
Fans 13 60 780
30Wts LED lights 30 30 900
Projectors 2 60 120
Sound system(800wts) 1 100 100
20200

Total Load 86.66


16.86
22.6
126.12
140.1333333333
Load Details:
Project: LNS TEMPLE PAHSE - 1 BANJARA HILLS,
HYDERABAD

S.no Description Load in (KW)

1 Cellar Floor + 90.30 Lvl. 0.03


2 Cellar Floor + 94.00 Lvl. 0.30
3 Temple Level +96.50 Lvl. 27.32
Book Stalls & Pre-Darshan
4 5.51
Counter Areas
5 Temporary Ashram Block 51.51
6 Temporary Toilet Block 2.00
7 Sump
8 Pump

Total Load (KW) 86.66