PRESENTED BY:

Peter Kha Bang


Joyce D. Danila
Samantha Jacinto
Henry Lyn Romero
Adrian Bryan Estember
PRESENTED TO:
Dr. Tomas U. Ganiron Jr
• DM Consunji, Inc. (DMCI) – the lead contractor for the
Metro Manila Skyway Stage 2.

• Citra Metro Manila Tollways Corporation (CMMTC) – the


proponent for the Skyway Project.
• April 2009 Citra announced the construction on the
second stage.

• By May 2010, rotating the highest pierhead in the Sucat


area.

• By July, concreting 134 of the required 238 spans and


started pouring the Asphalt overlay.
• Started mobilization in May 2009 and finishing in March
2011.

• On December 15, 2010, The Bicutan-to-Sucat portion of


Stage 2 opened to the public.

• April 2011 – opened to public.


• STAGE 2 involved the construction of a 6.88km-long
expressway from BICUTAN to ALABANG.

• Accommodates an estimated of 300,000 vehicles per day


• 6-lane elevated toll way to the public from Bicutan to
Alabang.
• Total Project Cost: 2 Billion Pesos

• Minimum Speed : 60kph

• Maximum Speed : 100kph for Class 1 Vehicles


80kph for buses and trucks
• The project aims to provide a vital link between
ALABANG AND BICUTAN through elevated expressway
system.

• It also aimed at helping decongest Metro Manila’s major


road system

• The project is also to boost the conduct of trade and


commercial activities
ISSUE
• Worsening traffic condition in Metro Manila

SOLUTION
• The government proposed to build the Skyway Stage3.