Contractors guidelines & works item 
 
 
 
[Confidential / Internal Use Only] 
 
Prepared For 
Contractors 
  
Prepared by 
[insert name] 
Xtremax Pte Ltd 
[insert email address] 
+65 6778 4985 
 

 
www.xtremax.com  © Xtremax Pte Ltd. 2018. All 
Rights 
 

Document Confidentiality Statement 


 
The  information  in  this  document  is  confidential  to  the  person  to  whom  it  is  addressed 
and  should  not  be  disclosed to any other person. It may not be reproduced in whole, or in 
part,  nor  may  any  of  the  information  contained  therein  be  disclosed  without  the  prior 
consent  of  the  directors  of  Xtremax  Pte.  Ltd.  (‘the  Company’).  A  recipient  may  not  solicit, 
directly  or indirectly (whether through an agent or otherwise) the participation of another 
institution or person without the prior approval of the directors of the Company. 
 
The  contents  of  this  document  have  not  been  independently  verified  and  they  do  not 
purport  to  be  comprehensive, or to contain all the information that a prospective investor 
may  need.  No  representation,  warranty  or  undertaking,  expressed  or  implied  is  or will be 
made  or  given  and  no  responsibility  or  liability  is  or  will  be  accepted  by  the  Company  or 
by  any  of  its  directors,  employees  or  advisors  in  relation  to  the accuracy or completeness 
of  this  document  or  any  other  written  or  oral  information  made  available  in  connection 
with the Company. 
 
Any  form  of  reproduction,  dissemination,  copying,  disclosure,  modification,  distribution 
and or publication of this material is strictly prohibited. 
 
 
 
    

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 1  


 

Revision History 
Version  Date  Author  Description 

0.0.1  10 May 2019  Akbar Khrisna  Initial document and 


bullet points 

       

       
 

Prepared/ Reviewed By 


Date 
Designation  Name  Signature 
(DD/MM/YYYY) 

       

       

       
 

Agency Sign-Offs 
Date 
Designation  Name  Signature 
(DD/MM/YYYY) 

       

       

       

       

       

       

 
 

   

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 2  


 

Table of Contents 
​1​. Introduction 5 
​1.1.​ Background 5 
1.2. Document Objective 5 
1.3. Notes 5 

2. Site Plan and Areas 6 


2.1. Main Building 6 
2.2. Front Parking Lot 9 
2.3. Side Parking Lot 10 
2.4. Backyard 11 
2.5. Warehouse 1 12 
2.6. Warehouse 2 13 

3. Renovation Phases & Items 14 


3.1. Phase 1 14 
3.1.1. Main Building Area 14 
3.1.1.1. Building Facade 14 
3.1.1.3. Walls 14 
3.1.1.4. Floor 14 
3.1.1.5. Ceiling 15 
3.1.1.6. Bathrooms 15 
3.1.1.7. Windows 15 
3.1.1.8. Electricity Outlet 16 
3.1.1.9. Doors 16 
3.1.1.10. Stairs & Railing 16 
3.1.1.11. Water Line (Sambungan Air) 16 
3.1.1.14. Pantry 16 
3.1.1.15. Meeting Rooms 17 
3.1.1.16. Lighting 17 
3.1.2. Front Parking Lot Area 17 
3.1.2.1. Roof 17 
3.1.2.2. Fence Wall Inside (Pagar dinding dalam) 18 
3.1.2.3. Fence Wall Outside (Pagar dinding luar) 18 
3.1.2.4. Floor 18 
3.1.3. Side Parking Lot Area 19 
3.1.3.1. Roof 19 
3.1.3.2. Drain Pipe (Talang Air) 19 
3.1.3.3. Gutters (Saluran air bawah) 19 
3.1.3.5. Fence Wall Inside (Pagar dinding dalam) 19 
3.1.3.6. Warehouse Wall Outside (Dinding gudang luar) 20 
3.1.3.7. Lighting 20 
3.3. Phase 2 22 
3.3.1. Warehouse 1 Area 22 
3.3.1.1. Warehouse Wall Inside 22 

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 3  


 

3.3.1.2. Roof 23 


3.3.1.3. Ceiling & Insulation 23 
3.3.1.4. Floor 23 
3.3.1.5. Electricity Outlet 24 
3.3.1.6. Meeting Rooms 24 
3.3.1.8. Lighting 24 
3.3.1.9. Toilet & Partition 25 
3.3.1.11. Pantry 25 
3.3.1.12. Server Room or storage area 26 
3.4. Phase 3 27 
 
 
   

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 4  


 

​1​. Introduction   

​1.1.​ Background 
As Xtremax continue to grow, we are currently in need to move to a bigger office in 
Bandung. We are currently in a phase to look for contractor that can renovate our 
potential office. 

1.2. Document Objective 


To enable contractors to give quotation within the scope of work described in this 
document.  

1.3. Notes 
Several notes to the contractors regarding this renovation are as follows. 
● Renovation shall be done with utmost consideration to the expense or cost 
● Quotation  shall  be  done  by  following  the  items  described  in  ​Section  3. 
Renovation  Phases  &  Items​,  each  cost  can  be  traced  back to each item in all 3 
phases. 
● Should  there  is  high  cost  in  certain  items  for  renovation,  contractors  should  be 
able to provide several options to reduce the cost. 
● The deadline for Phase 1 renovation will be Mid August 2019 
● The deadline for Phase 2 can be discussed accordingly. 
 

 
 
 
   

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 5  


 

2. Site Plan and Areas 


The  whole  site  plan  of  the  building  can  be  downloaded  in  attached  Google  Drive in “Site 
Plan_Area” (named: Padasuka SitePlan.pdf) 

2.1. Main Building 


Site Plan  Current Condition 

A. Main Building 1st Floor 

 
 
A. Main Building 1st Floor 
 
For bigger picture can be seen in 
the attached folder: 1. First Floor 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 6  


 

 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
   
  The other photo of this area can be seen in the 
  attached folder: ​1. First Floor 
 
 
B. Main Building 2nd Floor 

 
B. Main Building 2nd Floor 
 
For bigger picture can be seen in 
the attached folder: 2
​ . Second Floor 
   

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 7  


 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
  The other photo of this area can be seen in the 
  attached folder: 2. Second Floor 
 
 
C. Working Area on 2nd Floor 

 
 
The other photo of this area can be seen in the 
attached folder: ​3. Working Area 
 
C. Working Area on 2nd Floor 
 
For bigger picture be seen in the 
attached folder: 3
​ . Working Area 
 

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 8  


 

2.2. Front Parking Lot 


Site Plan  Current Condition 

 
For bigger picture be seen in the 
attached folder: 2
​ . Front Parking 
Lot 

 
The other photo of this area can be seen in the 
attached folder: ​2. Front Parking Lot 
 

   

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 9  


 

2.3. Side Parking Lot 


Site Plan  Current Condition 

 
 
The other photo of this area can be seen in the 
attached folder: ​3. Side Parking Lot 

 
 
For bigger picture be seen in the 
attached folder: 3
​ . Side Parking Lot 
 
 
 
 
 
 
 
 
 
 
 
 
 

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 10  


 

2.4. Backyard 
Site Plan  Current Condition 

 
 
The other photo of this area can be seen in the 
attached folder: ​4. Backyard 
 
 
For bigger picture be seen in the 
attached folder: 4
​ . Backyard 
 

   

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 11  


 

2.5. Warehouse 1 
Site Plan  Current Condition 

 
 
For bigger picture be seen in the 
attached folder: 5
​ . Warehouse 1 

 
 
The other photo of this area can be seen in the 
attached folder: ​5. Warehouse 1 
 
 
 
 
 
 
 

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 12  


 

2.6. Warehouse 2 
Site Plan  Current Condition 

 
 
 
For bigger picture be seen in the 
attached folder: 6
​ . Warehouse 2 

 
 
The other photo of this area can be seen in the 
attached folder: ​6. Warehouse 2 
   

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 13  


 

3. Renovation Phases & Items 


The  area  described  in  the  following  sections  will  refer  to  the areas described in ​Section 2. 
Site  Plan  and  Areas.  ​The  renovation  works  will  be  done  with  the  assumption  that  all 
current furniture and storage will be emptied out by the owner. 

3.1. Phase 1 
3.1.1. Main Building Area 

3.1.1.1. Building Facade 

The  current  building  facade  needs  some  rejuvenation,  plenty  of  parts  is  rusty,  ceiling  is 
broken,  ceiling  is  broken.  We  expect  contractors  to  provide  a  rejuvenation  to the current 
facade.  By  closing  it  with  Aluminium  Composite  Panel  (ACP)  and  GRC  materials  to  the 
brick style in the building. 
 

Current Condition  Expected 

 
 

3.1.1.3. Walls 

All walls inside the main building, needs to be patched and painted with white color.  

3.1.1.4. Floor 

All  flooring  tiles in the main building, needs to be rejuvenated, cleaning and replacing the 


broken  tiles  might  be  needed.  ​For  the  working  areas  (see  ​Section  2.1.  Main  Building​), 
please  provide  quotation  for  adding  a  vinyl  floor  on  top  of  the  current  tile.  For  the 
rest of the building, please keep the current tile. 

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 14  


 

3.1.1.5. Ceiling 

All  ceiling  which  is  broken  needs  to  be  replaced.  Please  provide  2  quotation  for  different 
renovation: 
● Keep the current ceiling, but paint and patch all the holes and 
● Replace  the  current  ceiling  with  gypsum  materials  to  enhance  the  modern 
looking building from the inside. 

3.1.1.6. Bathrooms 

Bathrooms are in a poor state that needs rejuvenation by replacing the toilets and tiles. 
 

Current Condition  Expected 

 
 

3.1.1.7. Windows 

Plenty  of  windows  in  working  areas  needs  to  be  fixed,  by  replacing  the  patched  up 
window’s  glasses  and  frame,  repaint  the  frame  with  light  green  color  and  cleaning.  ​No 
need to replace the louvre window (kaca nako). 

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 15  


 

3.1.1.8. Electricity Outlet 

Ensure  that  all  electricity  lines  to  the  main  building  is  installed  correctly  and  able  to 
power all office activity during the first couple of months (until Phase 2 is completed). 

3.1.1.9. Doors 

Several  doors  and  door’s  frame  in main building working area needs to be rejuvenated or 


replaced. Painting and installing new doors might be needed. 

3.1.1.10. Stairs & Railing 

Stairs  and  railing  that  connects  the  first  and  the  second  floor  of  the main building is also 
in  a  poor  shape  and  dangerous.  Please  provide  quotation  for  rejuvenating  the  current 
stairs by replacing the railing with modern looking materials (Metal mesh). 
 

Current Condition  Expected 

   
 

3.1.1.11. Water Line (Sambungan Air) 

Do  ensure  that  the  renovation  work  is  also  includes  making  sure  that  the  water  line  is 
working  as  it  should,  from  the  water  supply  (PDAM/Sumur),  water reservoir (toren air) up 
to  water  faucet  in  bathrooms  are  working,  along  with  the  drainage  line  from  each 
bathroom and toilets. 

3.1.1.14. Pantry 

The  current  pantry  is  also  in  a  poor  shape  and  condition.  Thus  the  pantry  room  needs to 
be rejuvenated by painting the wall and ceiling also cleaning. 

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 16  


 

3.1.1.15. Meeting Rooms 

All  bedrooms  in  the  main  building,  shall  be  converted  to  meeting  room.  Please  ensure 
that  all  the  works  includes  cleaning,  painting  the  walls  and  ceiling  and  other  decorative 
parts to make the interior modern and fresh. 

3.1.1.16. Lighting 

Current  lighting  condition  is  too  dark  and  dim,  thus  to  create  a  more  comfortable 
environment, we expect more lighting to be installed (downlight) to enhance brightness. 
 

Current Condition  Expected 

3.1.2. Front Parking Lot Area 

3.1.2.1. Roof 

Roof  in  the  parking  lot  area  are  in  a  terrible  shape  and  needs  to  be  torn  down,  and 
replaced  with  a  new  roof  with  better  integrity.  The  new  roof  shall  not  extend  all  the  way 
through  the  inside  walls  of  the fence, but only 50% of the way (up to lamp pole) to ensure 
that  plenty  of  natural  light  can  go  through.  Current  storage  room  in  front  of  the parking 
lot shall be torn down. 

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 17  


 

3.1.2.2. Fence Wall Inside (Pagar dinding dalam) 

On  top  of  that,  needs  to  install  Aluminium  Composite  Panel  (ACP) to hide the top part of 
the  inside  walls  of  the  fence  (painted white) and extend all the way through the entrance 
gate.  The  bottom  part  shall  be  used  as  a  garden  with  plants  that  extends  all  the  way 
through the entrance gate. 
 

Current Condition  Expected 

 
 

3.1.2.3. Fence Wall Outside (Pagar dinding luar) 

Outside  wall  of  the  site,  needs  to  be  rejuvenated  as  well  by  painting  it  and  fixing  the 
broken parts. 

3.1.2.4. Floor 

The  current  floor  in  the  front  parking  lot  area  is  not  level,  thus  needs to fix to ensure that 
it’s level by using expose hard concrete floor. 
 

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 18  


 

3.1.3. Side Parking Lot Area 

3.1.3.1. Roof 

Roof  in  the  side  parking  lot  area  are  in  a  terrible  shape  and  needs  to  be  rejuvenated  by 
replacing  the  broken  roof  materials,  painting  the  structure  and  replace  parts  of  the  roof 
with a see-through fiber materials to let more natural light in. 

3.1.3.2. Drain Pipe (Talang Air) 

A  lot  of  drain  pipe  from  the  roof  that  goes  to  the  gutter  is  broken,  thus  some  work  is 
needed to fix this drain pipe. 
 

Current Condition  Expected 

3.1.3.3. Gutters (Saluran air bawah) 

Current  gutter  that  extend  all  the  way  in  the  side  parking  lot  area  is  broken.  Need  to  fix 
parts  of  it that is broken, painting, new construction, close the hole with steel mesh frame 
(to not let rat in) and ensure water can flow to the outside of the building. 

3.1.3.5. Fence Wall Inside (Pagar dinding dalam) 

The  fence  wall  in  the  inside  is  also  in  poor  shape  condition  that  needs to be rejuvenated. 
Provide quotation to install a GRC board along the walls with wood accent on the top. 
  

Current Condition  Expected 

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 19  


 

 
 
 

3.1.3.6. Warehouse Wall Outside (Dinding gudang luar) 

The  outside  of  the  warehouse  needs to be painted with light green color and textured for 


easy maintenance in the future - as in the picture below. 
 

Current Condition  Expected 

 
 

3.1.3.7. Lighting 

Along  the  side  parking  lot,  there  is  no  lighting  available.  Please  provide  quotation  to 
install  hanging  lamp along with spotlight (installed on the floor) - (Spotlight tanam) along 
the parking lot. 
 
 

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 20  


 

Current Condition  Expected 

 
 

   

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 21  


 

3.3. Phase 2 
3.3.1. Warehouse 1 Area 

3.3.1.1. Warehouse Wall Inside 

Warehouse  wall  is  currently  on  a  poor  shape  condition,  thus  needs  repainting  and 
rejuvenating.  Please  see  image  below  for  the  expected  results.  Parts  of  the  wall  can  be 
slightly  decorated  with  GRC  sheets with wood accent at the top. Parts of the wall that are 
exposed  to  the  outside  also  needs  to  be  enclosed  with  metal  sheets  as  depicted  on  the 
image below. 
 

Current Condition  Expected 

 
 

 
 

 
 

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 22  


 

3.3.1.2. Roof 

The  current  roof  has  plenty  of  holes,  which  enables  rain  water  to  drip  down.  Needs 
renovation  to  replace  the  broken  parts,  along  with  adding  some  see-through  materials 
(Fiberglass) to allow more natural light and lower the electricity bills. 

3.3.1.3. Ceiling & Insulation 

The  ceiling is exposed directly to the sunlight, thus gets hot during the day and gets noisy 
when  it  is  raining.  Thus,  needs  to  add  insulation  foil  to  lower  the temperature during the 
day and minimize the rain sound. 
 

Current Condition  Expected 

3.3.1.4. Floor 

The  floor  is  in  a  bad  shape,  needs  renovation  to  replace  it  with  hard  concrete  floor  and 
minimize the cost. 

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 23  


 

Current Condition  Expected 

 
 

3.3.1.5. Electricity Outlet 

Several  main  electricity  outlet  needs  to  be  installed  along the whole floor, to enable us to 


install  additional  outlet  in  the  future.  The  electrical  line  needs  also  to  be  inspected  to 
avoid shortage or over capacity in the future. 

3.3.1.6. Meeting Rooms 

Currently  there  are  3  enclosed  area  (closed  by  wooden  walls,  as  seen  on  the  current 
condition  image  below.  This  needs  to  be  renovated  to  3  meeting  rooms,  by  installing 
aluminium frame with glass along with its door. 
 

Current Condition  Expected 

 
 

3.3.1.8. Lighting 

There  are  no  lighting  available  on  the  warehouse  1  area.  Thus  renovation  needs  to  install 
lighting fixtures in several areas (along with the supporting frames). 

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 24  


 

Current Condition  Expected 

3.3.1.9. Toilet & Partition 

There  are  currently  5  broken  toilets  in  the warehouse 1 area, renovation needs to be done 


to  fix  the  current  toilet  by  replacing  the  tiles  and  toilet  along  with  installing  partition, 
mirror  and  washbasin,  with  subway  tile  installed  in  the  partition.  For  toilet styling, please 
see S
​ ection 3.1.1.6. Bathrooms. 
 

Current Condition  Expected 

 
 
 

3.3.1.11. Pantry 

There  is  one  area  in  the  warehouse  1  that  is  empty  and  currently  not  being  used  for 
anything.  We  think  it  is  better  to  create  a  small  pantry  by  attaching  light  aluminium 
doors with glasses. 
 
 
 

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 25  


 

Current Condition  Expected 

 
 

3.3.1.12. Server Room or storage area 

Adjacent  to  the  pantry  area  there  is  also  an  area  that  will  be  used  as  a  server  or  storage 
room. Thus, renovation needs to be done on the inside by painting and flooring as well. 
 

Current Condition  Expected 

 
 
 

www.xtremax.com © Xtremax Pte Ltd. 2018. All Rights I 26  


 

3.4. Phase 3 
Phase 3 planning is still on-progress. 