Вы находитесь на странице: 1из 2

PAMANTASAN NG LUNGSOD NG VALENZUELA

Tongco Street, Brgy. Maysan, Valenzuela City

Name: Christian D. Dado Course, Year and Section: BSA 4-1


Company Name: Flexo Manufacturing Corporation
Week: 05 (June 3, 2019 to June 7, 2019) Accumulated Number of Hours Rendered: 186

PROGRESS REPORT

DATE AND
EXPECTED LESSON/S
TASK/S ASSIGNED TIME TASK IS
OUTPUT LEARNED
ACCOMPLISHED

Encoding of Waste An updated version June 3, 2019 Even wastes are


disposal report from of Waste disposal Monday being monitored to
different areas of report summary that 8:00 AM to 9:00 AM make sure that every
production is more reliable 1 Hours waste that were being
declared were right.

Cutting of inventory A sufficient amount June 3,2019 In preparation for


tags in preparation of inventory tags to Monday Inventory counting, a
for semi-annual be used for inventory 9:00 AM to 10:30 lot of time must be
inventory counting counting PM considered and the
1.5 Hours things to be used
must be prepared way
ahead of time and it
must be complete.

Checking of An accurate number June 3, 2019 Even before


inventory tags on of inventories to be Monday inventory counting,
counted inventories. re-counted in our 10:30 AM to 12:00 there is an appointed
semi-annual PM person to determine
inventory counting 1.5 Hours which inventories are
before the month of included in semi-
June ended. annual inventory
counting.

Cutting of inventory A sufficient amount June 3,2019 In preparation for


tags in preparation of inventory tags to Monday Inventory counting, a
for semi-annual be used for inventory 1:00 PM to 5:00 PM lot of time must be
inventory counting counting 4 Hours considered and the
things to be used
must be prepared way
PAMANTASAN NG LUNGSOD NG VALENZUELA
Tongco Street, Brgy. Maysan, Valenzuela City

ahead of time and it


must be complete.

Sorting of New Easily accessible June 4 to June 7, In a continuous


Production reports production reports 2019 production there will
coming from because it is in order Tuesday to Friday always be a
different production 8:00 PM to 12:00 PM continuous passing of
areas 4 Hours Production Reports
coming from the
Production areas

Filing of sorted new Production reports June 4 to June 7, Files must be put into
production reports that were sorted were 2019 its place for it to be
put into its own Tuesday to Friday easily accessible and
folder. 12:00PM to 5:00 PM there’s a lesser
4 Hours chance of missing
reports.
TOTAL NUMBER OF HOURS RENDERED FOR THIS WEEK: 28

Prepared by: Christian D. Dado Noted:


Student- Trainee Signature Immediate Supervisor

Вам также может понравиться