RFI Details

Sr. No.
RFI Activity Description
RFI NO Area

Approval of temporary Target Laydown


1 RFI-ICP-001 Near Samsung Site office
area
PC WORKS FOR GRE PROJECT
RFI LOG

Approval
ls
Status/Code

Approved

Approved

Approved
With Note
RFI Submission

Not
Drawing No. Rev Inspection date Inspection Time
Date

00-IB-E-60075R 1 7-May-19 7-May-19 09:30 AM


ITP Details RFI Received On

Works CON/FDT/
ITP Reference
Discipline SURFACE
Remark
(Applicable Check Yes No
Sheet)
Construction of Interconnecting Platforms in Ruwais
West

Contract No: 18RRERASEPD12231

Request For Inspection and Test

Discipline: PIPING Mechanical

ITP Reference

Sr. No. Activity / Inspection Item Area / Location

1 Approval of temporary Target Laydown area Near Samsung Site office

Attach Sketch as may be required to show the location(s), if any:


00-IB-E-60075R

COMPANY Approval / Comments, if any:


The Works are

Approved Approved as Noted


Not Approved Inspection Re-scheduled

SUB-CONTRACTOR (AS APPLICABL) CONTRACTOR

Name:

Signature: N/A

Date:
cting Platforms in Ruwais Refinery
West

Project : ICP

RFI No. RFI-ICP-001


t
Date: 7-May-19

Electrical / Instrumentation Others

Proposed Inspection Applicable Check


/ Location
Sheet / Report No
Date Time

ung Site office 7-May-19 09:30 AM

Inspection Point:
AR: Approved Required
H: Hold Point
W: Witness Inspection
R: Review of Documentation
S: Surveillance
M: Monitoring
T/C: Test Certificate Required

Approved as Noted
Inspection Re-scheduled

CONTRACTOR COMPANY

RFI-ICP-001