Robust QOS / In-Process

Metrics (IPM) Roll-out

December 2007

"The information contained herein is FORD PROPRIETARY information and may include FORD CONFIDENTIAL information as defined in Ford's Ford's Global Information Standard
II. Reproduction of this document, disclosure of the information,
information, and use for any purpose other than the conduct of business with
with Ford is expressly prohibited."

1
Objectives
• Drive a robust QOS within the supplier site by integrating
the five key Manufacturing Site Assessment (MSA)
elements into supplier's QOS.
• Reinforce the five focus MSA elements with in-process
measurable data.
• The five key MSA elements are:
– FMEA/Control Plan/Reaction Plan
– Sub-Supplier Quality Management
– Process Variability Monitoring
– Problem Solving/Corrective Action
– Manage the Change

Note:
Note: Suppliers
Suppliers are
are still
still responsible
responsible to
to be
be compliant
compliant to
to the
the entire
entire Manufacturing
Manufacturing Site
Site
Assessment, this process outlines a focused deep dive into the five key elements.
Assessment, this process outlines a focused deep dive into the five key elements.

2
Where Do We Need To Focus?

Analysis of Supplier Quality Issues Shows:

Supplier
Design FMEA/ Control
25% Plan

60% Sub-Supplier
40% Supplier Management
Internal

Supplier
Manufacturing Process Control
35%
Manage the (Cpk)
Change
Gage R & R

Opportunity - 5 Systemic Root Causes 3


IPM Results: Pilot Suppliers
Target: 100% Metrics Green
In-Process Metrics -- Overall Status
(24 Suppliers x 5 Metrics = 120 Data Points)
3%
100% 11% 8% 3% 3%
100%

13% 86% Red


20%
26% 31% 91% 24%
80% 24%
Element Ratings

80%

50% 38% 30% 26% Yellow


60% 40% 60%

38% 58% 63% 71% 73% 73% Green


40% 40%

38%
40% 49% % Plan
20% 20%

to Green
13% 37%
0% 0%

* **
6
6

06

06

6
06
-0
r-0

-0
l-0

-0

-0
g-

p-
n-
ay

ct

ov

ec
Ju
Ap

Au

Se
Ju

O
M

D
Target Q1 Score: 800 - 1600
Average Q1 Score
(24 Suppliers)
1600

1200 1004 1009 996


974
Q1 Score

942
813 863
740 755 787
800 642

400

0
6

6
06

06

06

6
06

6
-0

-0
r-0

-0

-0

-0
l-0
b-

g-

p-
n-
ar

ay

ov

ec
ct
Ju
Ap
Fe

Au

Se
Ju

O
M

D
4
Linkage to Manufacturing Site Assessment (MSA)

5 Systemic
Root Causes 5 MSA
Elements
FMEA/ Control
Plan

Sub-Supplier
1. FMEA/ Control Plan/ Reaction Plan
Management 2. Process Variability Monitoring
Process Control
• Process Capability
(Cpk) • Gage R&R
Gage R & R
3. Manage the Change
Manage the
Change
4. Problem Solving/Corrective Action
5. Sub-Supplier Quality Management

5
Robust QOS

• Living process GOVERNANCE


• Closed loop for
effective
implementation of FMEA/ Control
Plan
Sub-Supplier
Management
Process
Variability
corrective actions
• Governed process Sub-
Sub-Tier
Replication
• Continuous
improvement system Manage the
Change
Problem Solving/
Corrective Actions

Closed Loop Process


“Permanently addresses systemic failure modes” 6
Operational QOS
PROBLEM SOLVING
External Inputs
Warranty
PROBLEM
TGW PROCESS MANAGE THE
SOLVING/ CORRECTIVE
Quality Data VARIABILITY CHANGE
ACTIONS
Internal Inputs Sup. K 8D MTC
(Special Characteristic
Productivity DOCUMENTATION CHECKLIST
Linkage)
Capability
Sup. K1
FTT (Change Management &
Other Problem
Scrap Problem Solving Linkage) solving tools:
e.g.,: 6-Sigma, Shainin
AUDIT Gage R & R

MTC
Log
WORKING LEVEL
Paynter
MTC CHECKLIST CONTROL PM
DFMEA TRACKING
Code MTC # PLAN
Tool Control 12

DFMEA 12

PFMEA 12 WORK SUB-TIER


Control Plan 12 PFMEA INSTRUCTIONS IMPACT
Work Instructions 12

7
Linkage to In-Process Metrics
In-Process Metrics
Supplier Information FMEA/Control Plan
Panel #1 Green
FMEA/Control Plan Peer Group Sign-Off
Supplier Name: ABC Company 100%

Site Code: AB123 80%

FMEA/Control Plan
60%
Month Reported: Mar-06

5 MSA
40%
Comments:
20%

0%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

% Sign-off Planned % Sign-off Actual


Total # of FMEA/CP Reviews = 18
% Audit Planned % Audit Actual

Process Variability Monitoring

Elements
Panel #2 Green Panel #3 Red
Process Capability (Cpk) Gage R&R (ANOVA)
100% 100% 100% 100%
100%
7% 3% 97% 100% 100% 100% 100%
100% 7% 93% 90% 90%
7% 90%
7%
10%
17%
80%
80% 75% 30% 30% 30%
80% 80% 75% 75%
25%
73% 25%
67% 67% 67% 25%

% of SC, CC, HIC


60%
60% 20%

% of Gages
60% 50% 25%
25%
97% 100% 100% 100% 100% 100% 25%
90% 93% 25%
83% 87% 40%
40% 77% 25%
67% 65% 65% 65% 65%
60%
55%
50%
45%
20% 20% 40%
35%
30%
25%

0% 0%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
% <1.33 and contained % Gages (<10%)
Total # of Characteristics = 30 % >1.33 or error proofed Total # of Gages = 20 % Gages (11% - 30%)
% Plan to >1.33 % Plan to <30%

Manage The Change Problem Solving / Corrective Action


Panel #4 Green Panel #5 Red
Manage The Change Checklist Compliance Problem Solving / Corrective Action Capability
100% 100% 100% 100% 100% 100%
40 100% 96% 96%
1
00%

100% 100% 100%


93% 30 100% 100% 94% 100%
96%
100
%

91% 94% 89% 100% 96%


35 94% 38 38 91%
88% 88% 88%
26
82% 30 86%
8
0%

25 80% 82% 25 80%

30 26 27 75% 23
71%

Total # of 8Ds
25 20 67%
21 21 21 6
0%

60% 60%

18 19
20 17 15 16 17
14 4
0%
40%

15 11 11
10
10 8
2
0%
7 20%

3 5 5
5 3

0 0
%

0 0%

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Repeat Issues
Cum. MTCs Planned % Closed 8Ds
% 8Ds to D3 (Contained)
Total # of Planned MTCs = 38 Cum. 8Ds Opened
% Compliance (QOE)

1. FMEA/Control Plan • Engineering Documents


Linkages
2. Process Variability • Process Capability and
Monitoring Gage R&R
3. Manage The Change • Manage The Change QOE
Compliance
4. Problem Solving/ • Problem Solving / Corrective
Corrective Action Action Capability
5. Sub-Supplier Mgt. • Sub - Tier Replication 8
Summary

Move from REACTIVE to more PREDICTIVE


Quality Management System

Living Lessons Learned

Closed Loop Robust QOS

Move from Compliance Review Mindset


to Data Driven Quality-of-Event!

9
Questions?

10