1
Objectives
• Drive a robust QOS within the supplier site by integrating
the five key Manufacturing Site Assessment (MSA)
elements into supplier's QOS.
• Reinforce the five focus MSA elements with in-process
measurable data.
• The five key MSA elements are:
– FMEA/Control Plan/Reaction Plan
– Sub-Supplier Quality Management
– Process Variability Monitoring
– Problem Solving/Corrective Action
– Manage the Change
Note:
Note: Suppliers
Suppliers are
are still
still responsible
responsible to
to be
be compliant
compliant to
to the
the entire
entire Manufacturing
Manufacturing Site
Site
Assessment, this process outlines a focused deep dive into the five key elements.
Assessment, this process outlines a focused deep dive into the five key elements.
2
Where Do We Need To Focus?
Supplier
Design FMEA/ Control
25% Plan
60% Sub-Supplier
40% Supplier Management
Internal
Supplier
Manufacturing Process Control
35%
Manage the (Cpk)
Change
Gage R & R
80%
38%
40% 49% % Plan
20% 20%
to Green
13% 37%
0% 0%
* **
6
6
06
06
6
06
-0
r-0
-0
l-0
-0
-0
g-
p-
n-
ay
ct
ov
ec
Ju
Ap
Au
Se
Ju
O
M
D
Target Q1 Score: 800 - 1600
Average Q1 Score
(24 Suppliers)
1600
942
813 863
740 755 787
800 642
400
0
6
6
06
06
06
6
06
6
-0
-0
r-0
-0
-0
-0
l-0
b-
g-
p-
n-
ar
ay
ov
ec
ct
Ju
Ap
Fe
Au
Se
Ju
O
M
D
4
Linkage to Manufacturing Site Assessment (MSA)
5 Systemic
Root Causes 5 MSA
Elements
FMEA/ Control
Plan
Sub-Supplier
1. FMEA/ Control Plan/ Reaction Plan
Management 2. Process Variability Monitoring
Process Control
• Process Capability
(Cpk) • Gage R&R
Gage R & R
3. Manage the Change
Manage the
Change
4. Problem Solving/Corrective Action
5. Sub-Supplier Quality Management
5
Robust QOS
MTC
Log
WORKING LEVEL
Paynter
MTC CHECKLIST CONTROL PM
DFMEA TRACKING
Code MTC # PLAN
Tool Control 12
DFMEA 12
7
Linkage to In-Process Metrics
In-Process Metrics
Supplier Information FMEA/Control Plan
Panel #1 Green
FMEA/Control Plan Peer Group Sign-Off
Supplier Name: ABC Company 100%
FMEA/Control Plan
60%
Month Reported: Mar-06
5 MSA
40%
Comments:
20%
0%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Elements
Panel #2 Green Panel #3 Red
Process Capability (Cpk) Gage R&R (ANOVA)
100% 100% 100% 100%
100%
7% 3% 97% 100% 100% 100% 100%
100% 7% 93% 90% 90%
7% 90%
7%
10%
17%
80%
80% 75% 30% 30% 30%
80% 80% 75% 75%
25%
73% 25%
67% 67% 67% 25%
% of Gages
60% 50% 25%
25%
97% 100% 100% 100% 100% 100% 25%
90% 93% 25%
83% 87% 40%
40% 77% 25%
67% 65% 65% 65% 65%
60%
55%
50%
45%
20% 20% 40%
35%
30%
25%
0% 0%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
% <1.33 and contained % Gages (<10%)
Total # of Characteristics = 30 % >1.33 or error proofed Total # of Gages = 20 % Gages (11% - 30%)
% Plan to >1.33 % Plan to <30%
30 26 27 75% 23
71%
Total # of 8Ds
25 20 67%
21 21 21 6
0%
60% 60%
18 19
20 17 15 16 17
14 4
0%
40%
15 11 11
10
10 8
2
0%
7 20%
3 5 5
5 3
0 0
%
0 0%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Repeat Issues
Cum. MTCs Planned % Closed 8Ds
% 8Ds to D3 (Contained)
Total # of Planned MTCs = 38 Cum. 8Ds Opened
% Compliance (QOE)
9
Questions?