PIPELINE REHABILITATION PROJECT

NCS5 OFF PLOT PIPELINES WORKS


BGC 341-A

COLD BEND INSPECTION CHECK LIST


Project NCS5 OFF PLOT PIPELINES WORKS BGC 341-A Date 27-09-2018
Client Basrah Gas Company ( BGC ) Report No. AKT- ST 135 –Report -01
No. of production 6 BENDS
REFERENCES: Cold Bending Procedure
Document Number 1300-AKTO-PL01-ISGP-U27000-LA-6180-00001

INSPECTION
NO. ACTIVITY REMARKS
CONCLUSION
The drawings are approved and version YES
1 is correct.
The bending angle shall be complied with YES
2
the drawing.
The maximum permissible curvature YES
3 produced by field bending shall be more
than 60 times the outside diameter.
The length of the straight section shall YES
4 meet the specifications. (More Than 1.5m
For Both Ends)
YES
The anti-corrosion coating shall be
5
smoothing and free of submerged bubbles,
folds, cracking, pits and voids.
YES
6 The cold bending pipes shall be identified
in accordance with requirements.
Ovality in the pipe shall not exceed 2.5% YES
7 of the nominal inside diameter.
Longitudinal weld of the pipes shall be on YES
8 the neutral axis and for side bends on the
top of the pipe.
9 Bends is free from buckling, cracks, or other YES
evidence of mechanical damage.

CONTRACTOR COMPANY
NAME

SIGNATURE

DATE

1300-AKTO-PL01-ISGP-U27000-QA-5733-00007 ITP FOR COLD BENDING PROCEDURE