GRADING QUANTITIES

PAVING QUANTITIES
ITEM 311(2)e2-PORTLAND CEMENT CONCRETE PAVEMENT 0.28 M. THICK

LENGTH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,697.20 LN.M.

WIDTH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.50 L.M.

AREA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,545.80 SQ.M.

LENGTH (JUNCTION). . . . . . . . . . . . . . . . . . . . . . . . . . 99.00 LN.M.

WIDTH (JUNCTION) . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.50 L.M.

AREA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 247.50 SQ.M.

AREA (WIDENING) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15.75 SQ.M.

TOTAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,538.27 SQ.M.

TO ESTIMATE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,538.27 SQ.M.

SUMMARY OF QUANTITIES
ITEM NO. DESCRIPTION QUANTITY UNIT

PART B OTHER GENERAL REQUIREMENTS


B.5 Project Billboard/Signboard 2.00 ea.
B.7(1) Occupational Safety & Health Program 1.00 l.s
B.8(1) Traffic Management 5.67 mo.
B.9 Mobilization/Demobilization 1.00 l.s

PART C EARTHWORKS
100(3)a1 Individual Removal of Trees (small a, 150-300mmØ) 25.00 ea.
100(4) Individual Removal of Trees (large, above900mmØ) 5.00 ea.
101(6) Removal of Structure and Obstruction 228.18 cu.m.
101 (10) Removal of Existing Road Signs 14.00 ea.
102(2) Roadway Excavation (Surplus Common) 1,231.86 cu.m.
102(3) Structure Excavation (Common Soil) 2,843.78 cu.m.
105(1)a Subgrade Preparation (Common Material) 2,809.05 sq.m.

PART D SUBBASE AND BASE COURSE


200(1) Aggregate Subbase Course 704.99 cu.m.

PART E SURFACE COURSES


302(2) Emulsified Asphalt 2,619.00 sq.m.
310(1)c Bituminous Concrete Surface Wearing Course, Hot Laid, 50mm 2,619.00 sq.m.
Portland Cement Concrete Pavement (Unreinforced)
311(1)e2 (280mmthk.) 2,809.05 sq.m.

PART F BRIDGE CONSTRUCTION


404(1)a Reinforcing Steel (Grade 40) (Minor Structure) 93,573.48 kg.
405(1)a3 Structural Concrete, Class "A" (Minor Structure) 969.41 cu.m.

PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES


500(1)a3 Pipe Culverts, 910 mm Ø (Class II) 70.00 ln.m.

PART H MISCELLANEOUS STRUCTURES


600(4) Curb and Gutter (Cast in Place) 262.48 cu.m.
601(1) Sidewalk (100mm thk.) 351.00 sq.m.
612(1) Reflectorized Thermoplastic Pavement Markings (White) 555.03 sq.m.
801(8) Relocation of Utilities 1.00 l.s

PROJECT NAME AND LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDING APPROVAL : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
MARIO R. ALVARADO JR.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEERING ASSISTANT
REGIONAL OFFICE NO. 8 NETWORK DEVELOPMENT- ROAD WIDENING- PRIMARY
LEYTE SECOND ENGINEERING DISTRICT ROADS DAANG MAHARLIKA (LT)- K0953+572- K0954+448 PAVING AND SUMMARY OF QUANTITIES PREPARED : REMENITH M. BARRIO ROCHEL D. HERMANO DANIEL A. ESTIGOY CARLOS G. VELOSO SQ 5
CARIGARA, LEYTE ENGINEER II OIC-CHIEF, PLANNING & DESIGN SECT. OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
MC ARTHUR, LEYTE 1 1 25
JAIME S. REMETILLA, JR. DATE : DATE : DATE : DATE :
ENGINEER II
PAVEMENT DESIGN PARAMETER:

ITEM: DESIGN REQUIREMENT

1. PERFORMANCE PERIOD FOR PCCP 20 years


2. DESIGN TRAFFIC: ESAL 0.855 x 10⁶
3. DESIGN RELIABILITY: R 85%
4. STANDARD DEVIATION : So 0.35
5. DESIGN SERVICEABILITY LOSS: APSI 2.50
6. PCCP MODULUS OF RUPTURE: Sc 635.55 psi
7. PCCP MODULUS OF ELASTICITY: Ec 3.360 x 10⁶
8. SUBGRADE DESIGN CBR 22.63
9. EFFECTIVE ROADBED RESILIENT MODULUS: MR 33937.74
10. SUBBASE ELASTIC MODULUS: ESB 15,000 psi
11. SUBBASE THICKNESS 8" (200 mm)
12. EFFECTIVE MODULUS AT SUBGRADE REACTION: K (pci) 590.00
13. DRAINAGE COEFFICIENT: Cd 1.00
14. LOAD TRANSFER COEFFICIENT: J 3.90
15. LOSS OF SUPPORT: Ls 1.00
16. K ( corrected ) 215.00

18.10

1.50 0.40 0.30 1.50 10.70 1.50 0.30 0.40 1.50

1.50 % 1.50 %
8% 1.50 % 1.50 % NGL
EXISTING CONCRETE PAVEMENT AND ASPHALT
1.50

SEE CONNECTION DETAIL SEE CONNECTION DETAIL

ITEM 200 AGGREGATE SUBBASE ITEM 200 AGGREGATE SUBBASE


ITEM 311 P.C.C.P. THICKNESS=280 MM
COURSE THCK = 200MM/100MM
200MM COURSE THCK = 200MM/100MM SIDEWALK THICKNESS=100 MM
ASPHALT THICKNESS = 50 MM
ITEM 311 P.C.C.P. THICKNESS=280 MM
ASPHALT THICKNESS = 50MM

TYPICAL ROADWAY SECTION W/ DRAINAGE CANAL


SCALE 1 : 70 M

PROJECT NAME AND LOCATION : SHEET CONTENTS : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDING APPROVAL : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
MARIO R. ALVARADO JR.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEERING ASSISTANT
REGIONAL OFFICE NO. 8 NETWORK DEVELOPMENT- ROAD WIDENING- PRIMARY
TYPICAL ROADWAY SECTION W/ DRAINAGE CANAL
LEYTE SECOND ENGINEERING DISTRICT ROADS DAANG MAHARLIKA (LT)- K0953+572- K0954+448 PREPARED : REMENITH M. BARRIO ROCHEL D. HERMANO DANIEL A. ESTIGOY CARLOS G. VELOSO TS 6
CARIGARA, LEYTE ENGINEER II OIC-CHIEF, PLANNING & DESIGN SECT. OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
MC ARTHUR, LEYTE 1 2 10
25
JAIME S. REMETILLA, JR. DATE : DATE : DATE : DATE :
ENGINEER II

Вам также может понравиться