Prequalification
Contents
Page No.
Company Details………………………………………………………………………..……………………………………… 3
Key Personnel………………………………………………………………………………………………..…………………. 4
Equipment and Resources………………………………………….………………………………………………………. 6
Services Offered…………………………………………………………………………………………....…………………. 10
Organizational Structure……………………………………………………………………………..….………………….. 12
Appendices
Company Details
Name of Company : Gulf Laboratories Co. W.L.L
Head Office Address : P.O. Box 4024, Doha, Qatar
Commercial Registration No. : 14419
Nature of Business : Ground Investigations and Materials / Environmental Testing
Established : Mid-1970’s
Owners : Mannai Corporation QPSC, Doha
Employees : 400 +
Geotechnical and Drilling Site Street No. 24, Gate 21, Al Kassarath Street
Investigation Department : Salwa Industrial Area
Telephone Nos. : +974 446 06585 / +974 445 02371
Fax No. : +974 446 06562
E-mail Address : gulflabs@mannai.com.qa
Workshop Location : Street 46, Salwa Industrial Area
Ministry of Environment
Approval No. for Soil
Investigation : SI-106
Ministry of Environment
Approval No. for Material
Testing lab : ML-427
We are certified to ISO 9001:2015, ISO 14001:2015, OHSAS 18001:2007 and are accredited to
ISO 17025:2005.
Key Personnel
General Manager : Andrew Slate, B.Sc, C.Geol, Eur.Geol
Microbiologist : 1 nos.
Laboratory Staff : 250 nos.
Physical Lab Senior Supervisor : Roberto A. Samia Jr, B.C.E
2 no. Beretta T44 Rigs, 9 Hanjin P4000SD Rigs. 9 no. DESCO SP5500S, 6no. BEC 800, 1no. Getech
DTHR 300
Services Offered
GROUND INVESTIGATION
Onshore Soil Investigations, Near shore Soil Investigations
Contaminated Land and Environmental Investigations
Exploratory Borehole Drilling and Sampling
Trial Pitting
In-Situ Testing
Static “Dutch” Cone Penetration Testing
Dynamic Cone Penetration Testing
Probe hole Surveys
Geophysical Investigations
Soil Resistivity Testing
OTHER SERVICES
Pile Integrity Testing
Underground Service Detection
Ground Penetrating Radar
Electromagnetic Surveys
Electrical Resistivity Survey
Thermal Resistivity Testing
APPENDIX A
Ministry of Finance Certificate of Classification – Preparing and Marking Sites for Drilling
and Clearing
APPENDIX B
Note: Scope of Accreditation Not Included. Please refer to Appendix D for list of tests
under the laboratory’s scope of accreditation.
APPENDIX C
RESUME OF COMPANY
EXPERIENCE
2018
Qatar NASSER SAEED AL HAJRI CO. DOHA PROJECT SITE (EARTH PIT BOREHOLES) 16-Sep-2018 (On going)
6,453.00
FUGRO PENINSULAR
Qatar PROVISION OF GEOLOGIST 16-Sep-2018 (On going)
SERVICES CO. 9,504.00
AL FARAG INTERNATIONAL
30-Aug-2018
Qatar FOR TRADING & VILLA PROJECT IN RAYYAN
2,700.00 (Completed)
CONSTRUCTION
26-Aug-2018
Qatar RAWDAT AL HAMMAM MOSQUE PROJECT IN RAYYAN
2,700.00 (Completed)
GEOTECHNICAL INVESTIGATION
GEOTECHNICAL INVESTIGATION –
WORKSHOP, OFFICE AND ACCOMMODATION 01-May-2018
Qatar ARAB ENGINEERING BUREAU
AT BIRKAT AL AWAMER, AL WAKRA FOR 5,857.65 (Completed)
PROFIT HOLDING.
DRILLING).
19-Mar-2018
Qatar UNIQUIP HOELSCHER W.L.L. SHALLOW MONITORING WELL.
13,269.15 (Completed)
SHEIKHA MOUZA BINT JABER DRILLING OF WATER WELL IN FARM 831, 04-Mar-2018
Qatar
AHMED AL THANI. KHARRARA – WAKRA. 8,100.00 (Completed)
ISMAIL BIN ALI TRDG & CONT. DRILLING OF BOREHOLES AT SITE 148 – 26-Feb-2018
Qatar
CO GEOTECHNICAL SOIL INVESTIGATION 2,362.50 (Completed)
18-Feb-2018
Qatar UNIQUIP HOELSCHER W.L.L DEEP RECHARGE WELL.
86,123.25 (Completed)
FERNAS CONSTRUCTION EPIC FOR MTBE TANKS & PIPELINES BETWEEN 12-Feb-2018
Qatar
COMPANY INC QAFAC & QP REFINERY 10,388.25 (Completed)
AL AQSA ENGINEERING VILLA IN LUSAIL (PLOT NO. WRW-B/45 & B/46 22-Jan-2018
Qatar
CONSULTANCY – GEOTECHNICAL INVESTIGATION WORK. 3,240.00 (Completed)
2017
Qatar RITE GEOSYSTEMS W.L.L DRILLING SERVICES FOR GROUNDWATER 25,987.50 03.Jan.17 ~ 31.May.17
MONITORING WELLS, DOHA
Qatar WEST BAY PETROL STATION GEO ENVIRONMENTAL INVESTIGATION 29,471.85 08.Jan.17 ~ 31.May.17
Qatar KOOP WATER MANAGEMENT 6" DIAMETER BOREHOLES FOR WELL POINT. 12,717.00 08.Jan.17 ~ 31.May.17
Qatar Qcon- QATAR BORING WORKS FOR EARTH PIT TO IWMP. 8,653.50 12.Jan.17 ~ 31.Mar.17
ENGNG.&CONSTR.CO. W.L.L
Qatar DOGUS INSAAT VE TIC. A.S CONSTRUCTION & UPGRADEOF RAYYAN 108,000.00 17.Jan.17 ~ 31-Dec.17
ROAD PROJECT CONTRACT 2
Qatar WSP MIDDLE EAST GEOTECHNICAL INVESTIGATION & 110,601.45 22.Jan.17 ~ 30.Jun.17
GEOPHYSICAL INVESTIGATION FOR LUSAIL
Qatar AL SAADANI CONTRACTING PROPOSED
TOWER G+1 VILLA WUKAIR, QATAR 1,620.00 11.Feb.17 ~ 31-Mar.17
Qatar H.E SHEIKH SULTAN BIN DRILLING WATER WELL IN PRIVATE FARM-621, 5,400.00 18.Feb.17 ~ 30.Apr.17
JASSIM BIN MOHMAMMED ABU HASYA, UMM SALAL,QATAR
Qatar AMANA
AL THANIQATAR FOUNDATION EXCAVATION INSPECTION 4,455.00 20.Feb.17 ~ 30.Nov.17
CONTRACTING CO.W.L.L
Qatar CONSTRUCTION DRILLING 450mm DIA BOREHOLE - ASPIRE 2,065.50 21.Feb.17 ~ 30.Apr.17
DEVELOPMENT COMPANY ACADEMY PROJECT
Qatar SAMSUNG
L.L.C C&T UMM HOUL POWER IWPP-ADDITIONAL SPT 4,781.03 22.Feb.17 ~ 30.Apr.17
CORPORATION BOREHOLES
Qatar MOONBEAM TRADING & VILLA PROJECT IN RAWDAT HAMMAM 2,430.00 23.Feb.17 ~ 30.Apr.17
CONSTRUCTION
Qatar AL JABER TRADING & DESIGN & BUILT OF NEW PORT PROJECT - 13,335.30 23.Feb.17 ~ 30.Jun.17
CONTRACTING CO. W.L.L PORT VISITOR CENTER BUILDING &
Qatar J&P ORBITAL HIGHWAY P023 - STANDARD
INFRASTRUCTURE 2,646.00 02.Mar.17 ~ 30.Apr.17
PENETRATION TESTS
Qatar UNIQUIP HOEL SCHER W.L.L DRILLING 300MM WELLS, DUKHAN 67,500.00 04.Mar.17 ~ 31.Oct.17
Qatar QATAR SHELL GTL LIMITED PEARL GTL PROJECT - RAS LAFFAN 52,738.85 04.Apr.17 ~ 30.Nov.17
Qatar QATAR KENTZ W.L.L RLIC QG PROJECT-622 WRR PROJECT- 21,675.60 04.Apr.17 ~ 30.Nov.17
DRILLING EARTHING BOREHOLE.
Qatar ARCADIS - HYDER KAHRAMMA PIPELINE FOR MEGA RESERVOIR 95,850.00 05.Apr.17 ~ 31.Dec.17
CONSULTING (RAS LAFFAN)
Qatar AL JABER & PARTNERS UMM AL HOUL - DRILLING BOREHOLES FOR 5,305.50 05.Apr.17 ~ 30.Jun.17
DEWATERING
Qatar MACMET - AL KHALEEJ NORMAL BOREHOLE TESTS FOR 3,267.00 06.Apr.17 ~ 31.May.17
CONSTRUCTIONS UNDERGROUND WATER TANK
Qatar BUTEC QATAR W.L.L ASPIRE ZONE PROJECT - BORING WORKS 5,305.50 12.Apr.17 ~ 30.Jun.17
Qatar HYUNDAI ENGINEERING & CONSTRUCTION OF AL BUSTAN STREET 22,207 03.Oct.17 ~ 28.Feb.18
CONSTRUCTION SOUTH (P007 C5 P1).
Qatar PENINSULAR PETROTECH ROTARY DRILLING OF BOREHOLE FOR CP 1,700 09.Oct.17 ~ 31.Dec.17
ENGINEERING W.L.L DUKHAN JABEL TANK FARM PROJECT
Qatar ABU NAKHLA PETROL DRILLING TO 8" DIAMETER BOREHOLE. 463 12.Oct.17 ~ 31.Dec.17
STATION
Qatar DAR AL HANDASAH SUB SURFACE SOIL INVESTIGATION FOR NCO 1,159 16.Oct.17 ~ 31.Jan.18
CONSULTANTS BUILDING WITHIN THE ISF CAMPT AT DUHAIL.
Qatar GALFAR AL MISNAD EPIC FOR HOOK-UP OIL/PWI WELLS & 30.022 18.Oct.17 ~ 28.Feb.18
ENGINEERING & FLOWLINES IN DUKHAN 2016-2019
Qatar SCHLUMBERGER WATER
CONTRACTING W.L.L. DEEP WELLS WITHIN DOHA & WAKRAH CITY 2,046 18.Oct.17 ~ 31.Dec.17
SERVICES
Qatar UNIVERSITY PETROL STATION DRILLING OF BOREHOLES AT UNIVERSITY 3,488 19.Oct.17 ~ 31.Jan.18
& CAR SERVICES. PETROL STATION
Qatar AL MANA PETROL STATION DRILLING OF BOREHOLES AT AL MANA 5,486 19.Oct.17 ~ 31.Jan.18
W.L.L PETROL STATION.
Qatar AL SELEEN PETROL STATION DRILLING OF BOREHOLES AT AL SELEEN 4,293 19.Oct.17 ~ 31.Jan.18
W.L.L PETROL STATION.
Qatar NASSER S. AL-HAJRI CO.LTD. 12 HANGERS AND WORKSHOP FOR NEW TANK 10,383 21.Oct.17 ~ 31.Jan.18
REGIMENT CAMP AT AL DUHAILIYAT –
Qatar A.AZIZ BIN KHALID AL DRILLING
DRILLING &
OFINSTALLATION OF WATER WELL IN
EARTHPIT BOREHOLES. 1,889 25.Oct.17 ~ 31.Dec.17
GHANEM KARARRAH CAMP, QATAR
Qatar AMANA QATAR DRILLING 100MM DIAMETER BOREHOLES. 511 01.Nov.17 ~ 31.Jan.18
CONTRACTING CO MANNAI HEADQUARTERS SHOWROOM &
Qatar MINISTRY OF MUNCIPALITY DRILLING
WAREHOUSEWATER WELLS IN NAQSHA,
CONSTRUCTION QATAR
PROJECT. 944 13.Nov.17 ~ 31.Jan.18
AFFAIRS & ENVIRONMENT
2016
Location Client 2
Project Value (US$) Period
Qatar SWISSBORING QATAR WLL Umm Al Houl IWPP 6,696.00 02.Jan.16 ~ 31.Mar.16
Qatar PETROLEUM TECHNOLOGY Groundwater Quality Monitoring Well 4,981.50 16.Apr.16 ~ 30.Jun.16
CO.W.L.L
Qatar Qcon- QATAR DRILLING OF OPEN BOREHOLE 14,931.00 02.Jan.16 ~ 30.Apr.16
ENGNG.&CONSTR.CO. W.L.L
Qatar HAYIL TRADING & B+G+6 Residential Building at Mansoura 4,320.00 10.Jan.16 ~ 31.Mar.16
CONTRACTING
Qatar HAMTON INTERNATIONAL Al Andalus School at Umm Salal 33,480.00 15.Jan.16 ~ 30.Apr.16
Qatar GEI CONSULTANTS National Center for cancer care and research 2,700.00 16.Jan.16 ~ 29.Feb.16
Qatar CENTURY TRADING W.L.L Metal Recycling Factory in New Industrial Area 2,295.00 20.Jan.16 ~ 31.Mar.16
Qatar M.E.S INDIAN SCHOOL Geotechnical Investigation Work 4,822.20 26.Jan.16 ~ 31.Mar.16
Qatar KEO INTERNATIONAL Geotechnical Investigation for development of 24,300.00 06.Feb.16~ 31.May.16
ISF camp in Al Duhail.
Qatar BATEC CONTRACTING Proposed Mosque and Quran School 4,741.20 18.Feb.16~ 30.Apr.16
Qatar TRINITY ENVIRONMENTAL Drilling & Installation of Groundwater 19,353.60 19.Feb.16~ 31.May.16
Monitoring Wells- Al Shamal
Qatar AL ZAMAAN CONSULTANTS Proposed Development of Oil Recycling Plant 6,277.50 25.Feb.16~ 31.May.16
Qatar TRAFFIC TECH GULF W.L.L Gantries for Traffic Signals, Pearl Qatar 5,508.00 17.Mar.16~ 30.Jun.16
Qatar MANNAI TRADING CO. Proposed Facility for Qatar Logistics in Doha 2,700.00 12.Mar.16~ 31.May.16
Industrial area
Qatar IZZELDIN MOHAMMAD AL Cleaning and Deepening water wells in Umm 4,455.00 19.Mar.16~ 31.May.16
BAHSSER Birka
Qatar JAMES CUBITT AND Geotechnical Investigation -Al Kaaban Health 3,450.60 24.Mar.16~ 31.May.16
PARTNERS Center
Qatar HAMTON INTERNATIONAL Plate Load Testing 4,860.00 26.Mar.16~ 30.Jun.16
Qatar CHAIRMAN TRADING & Private Palance in Umm Al Affai, Qatar 16,456.50 26.Mar.16~ 30.Jun.16
CONTRACTING
Qatar UNITED INTERNATIONAL Rental of Jack up Pontoon 10,395.00 02.Apr.16~ 30.Jun.16
TRADIND & CONT. W.L.L
Qatar QVC-QATAR VINYL COMPANY EDC Sale tank, Messaid 12,085.20 31.Mar.16~ 30.Jun.16
Qatar AL HUDA ENGINEERING Lusail Development for Primary 6,274.80 02.Apr.16~ 31.Oct.16
WORKS Infrasytructure CP12D
Qatar DOPET (DOHA PETROLEUM Expansion of Pilot CNG Refueling Station at 7,103.70 02.Apr.16~ 30.Sep.16
CONSTRUCTION CO. LTD) (SAMI)
Qatar KEO INTERNATIONAL Sub Consultancy Agreement for New 38,582.46 09.Apr.16~ 31.Jul.16
Swimming Pool At Al Rayyan and Qatar Sports
Qatar NATIONAL INDUSTRIAL Extension
Club of Distribution Network - Phase 6 7,290.00 16.Apr.16~ 31.Jul.16
CONTRACTING COMPANY
Qatar CAT BOOM Geotechnical Investigation - Transmission 18,316.80 14.Apr.16~ 31.Dec.16
Pipelines for Mega Reservoir
Qatar LARSEN & TOUBRO Design Supply and Installation of Substations 40,576.95 15.Apr.16~ 31.May.16
for LusailWadi, West North Marina
Qatar SCHLUMBERGER ASR South Additional Works 140,526.90 20.Apr.16~ 31. Dec.16
Qatar ALI MOHAMED AL MAHSADI Drilling Water Well in Private Farm Ummbab 5,670.00 21.Apr.16~ 30. Jun.16
& SONS
Qatar KEO INTERNATIONAL Al Wafra Residential Tower Lusail 30,069.90 21.Apr.16~ 31. Dec.16
CONSULTANTS
Qatar AL SAEED TRADING AND Proposed G+5 Residential Building, Najma 2,430.00 27.Apr.16~ 30. Jun.16
CONTRACTING
Qatar MADINA GROUP Shell GTL Plant- Ras Laffan Drilling Earthing 26,055.00 28.May.16~ 30. Jun.16
Borehole
Qatar OKAZ FOR TRADING & Proposed new Factory in New Industrial Area 4,725.00 28.Apr.16~ 30. Jun.16
CONTRACTING
Qatar QATAR ENGINEERING & Qatar Logistics building Drilling Earthing 18,225.00 28.Apr.16~ 31. Jan.17
CONSTRUCTION Borehole
Qatar SAMSUNG C&T Umm Al Houl Project 3,091.50 07.May.16~ 31. Jul.16
CORPORATION
Qatar SIX CONSTRUCT LTD Extension of Taxiways and Aircraft Parking 4,050.00 09.May.16~ 31. Jul.16
Stands - Plate Load Test
Qatar GULF EARTH MOVING Tunnel Excavation Project- AlWakra 5,373.00 09.May.16~ 31. Jul.16
Qatar F&M INGEGNERIA HIA Midfield CT02 Cargo Terminal - Doha 90,559.62 11.May.16~ 31. Mar.17
Qatar SINOHYDRO CP1 LUSAIL Additional Geotechnical Investigation Work 7,651.26 14.May.16~ 31. Jul.16
PROJECT for Settlement Area
Qatar QATAR FERTILIZER COMPANY Geotechnical Investigation at QAFCO 5&6 38,835.45 16.May.16~ 31. Aug.16
(QAFCO) Sites
Qatar GULF CONTRACTING CO. Soil Investigation Work for Amiri Link Road 24,104.25 17.May.16~ 31. Oct.16
Qatar SIX CONSTRUCT LTD Extension of Taxiways and Aircraft Parking 29,112.75 24.May.16~ 31. Aug.16
Stands QA2, Dynamic Probing
Qatar ISG Additional Geotechnical Investigation at 340,882.60 24.May.16~ 31. Oct.16
Emergency Exit at Al Bidda Park.
Qatar WORLEY PRSONS QG Feed for Waste Heat Recovery Unit at 31,342.95 24.May.16~ 30. Jun.16
RasLaffan LNG Plant
Qatar ISG Supply and Installation of Piezometer for 48,051.63 28.May.16~ 30. Sep.16
Katara West Underpass.
Qatar ALI HATEM MOHAMMED Water Well Drilling in Private Farm UmmBab 5,265.00 30.May.16~ 31. Jul.16
IBRAHIM AL MAHSADI Road.
Qatar KOOP WATER MANAGEMENT Quotation for drilling 400mm diameter wells 81,000.00 04.Jun.16 ~ 31.Dec.17
in industrial area Doha (Package 6)
Qatar AGUAS DE VALENCIA Hamad International Airport - Geotechnical 10,011.60 15.Jun.16 ~ 31.Dec.17
31.Aug.16
Investigation
Qatar UNITED CONSULTANTS Villa Extension - Al rayyan - Geotechnical 3,105.00 18.Jun.16 ~ 31.Dec.17
31.Aug.16
Investigation
Qatar URBACON TRADING & New Islands Lusail Island Resort Project 157,975.65 25.Jun.16 ~ 31.Dec.17
31.Dec.16
CONTRACTING
Qatar KEO INTERNATIONAL Al RayyanHuwar Street 32,363.55 28.Jun.16 ~ 31.Dec.17
30.Jun.17
CONSULTANTS
Qatar SINOHYDRO CP1 LUSAIL Additional Geotechnical Investigation - 8,077.05 04.Jul.16 ~ 31.Jan.17
31.Dec.17
PROJECT Settlement Area Near Storm Water
Qatar DOHA ENTRPRISES GROUP Geo Environmental Investigation - Doha Petrol 48,220.65 13.Jul.16 ~ 30.Apr.16
31.Dec.17
Center
Qatar Qcon- QATAR Treated Industrial & Process Water Project in 35,071.65 14.Jul.16 ~ 31.Dec.16
31.Dec.17
ENGNG.&CONSTR.CO. W.L.L Ras Gas
Qatar SCHLUMBERGER WATER BaniHajer Package 01 & 02 for core drilling 10,341.00 26.Aug.16 ~31.Dec.17
31.Jan.17
SERVICE
Qatar MR. KHALIFA OMRAN AL Well Drilling in Private Farm 2,916.00 10.Aug.16 ~31.Dec.17
31.Oct.16
KHALAF AL BAKR AL KUWARI
Qatar QATARI DEVELOPMENT FOR Office Building at D-Ring road 5,670.00 17.Aug.16 ~ 31.Dec.16
TRADING & CONTRACTING
Qatar PENINSULAR PETROTECH Revamping of Waste Water Treatment Facility 35,768.25 20.Aug.16 ~ 31.Mar.17
ENGINEERING in QAPCO
Qatar DOHA INTERNATIONAL Proposed New RO Water Station at Abu Samra 66,937.05 03.Sep.16 ~ 31.Dec.16
COMPANY
Qatar GULF EARTH MOVING Geotechnical Investigation - New Port Food 17,550.00 08.Sep.16 ~ 31.May.17
Storage
Qatar IBA- ISMAIL BIN ALI TRADE & Proposed Accomodation Building 6,480.00 05.Sep.16 ~ 30.Nov.16
CONT.
Qatar AL JABER & PARTNERS Coastal Road Preliminery Investigation 85,774.14 10.Sep.16 ~ 31.Dec.17
Qatar GULF EARTH MOVING New Port Project - Additional 13,974.12 18.Sep.16 ~ 31.May.17
Qatar SEVEN STAR TRADING & Hole Drilling in Industrial Area 4,043.25 23.Sep.16 ~ 31.Oct.16
GENERAL SERVICE
Qatar EXXON MOBIL RESEARCH Bedrock Coring 76,584.15 26.Sep.16 ~ 28.Feb.17
QATAR LIMITED
Qatar QATAR ALUMINIUM 4" Dia Borehole Well Drilling 1,890.00 29.Sep.16 ~ 30.Nov.16
EXTRUSION COMPAN Y
Qatar AL KHAYAT TRADING & B+G+1+P Villa HazmMarkhiya 3,982.50 01.Oct.16~ 31.Dec.16
CONTRACTING
Qatar SUEZ TRATTAMENTO QG1- PMP Water Resuse Project 37,559.70 09.Oct.16~ 30.Jun.17
Qatar MIDDEL EAST TECHNICAL Drilling Earthing Borehole Substation - Rayyan 1,620.00 08.Oct.16~ 31.Dec.16
SERVICE
Qatar FIVES FCB - CASH CUSTOMER Drilling Earthing Boreholes - Ummbab Project 15,950.25 13.Oct.16~ 30.Nov.16
Qatar KEO INTERNATIONAL Geotechnical Investigation for Al Rayyan Road 31,972.05 08.Nov.16~ 31.Jan.17
CONSULTANTS & Al Bustan Street
Qatar ACACAIA INTERNATIONAL Geotechnical Investigation for Building at Al 2,430.00 08.Nov.16~ 31.Jan.17
GROUP Wakra
Qatar SCHLUMBERGER WATER Core Drilling - Mall of Qatar 10,146.60 08.Nov.16~ 28.Feb.17
SERVICE
Qatar GULF CONTRACTING NDIA - Amiri Link Road 2,565.00 08.Nov.16~ 31.Jan.17
COMPANY
Qatar AL SULAITEEN Soil Investigation - North Road Muslal Ali 5,400.00 12.Nov.16~ 31.Jan.17
AGRICULTURAL &
Qatar TEBODIN MIDDLE
INDUSTRIAL EAST
COMPLEX Feed for MTBE Tanks & Pipeline connecting 48,552.75 14.Nov.16~ 30.Jun.17
QP Refinery and QAFAC in Mesaieed
Qatar CONSTRUCTION Villa Project - Maizer 3,167.10 17.Nov.16~ 31.Jan.17
ENGINEERING COMPANY
Qatar K&H SONS OF M. ALMANA Al Mana Headquarters -Geotechnical 4,846.50 21.Nov.16~ 31.Jan.17
CO Investigation
Qatar AL ALFIA HOLDING L.L.C Lusail Hotel Tower 157,202.10 27.Nov.16~ 30.Jun.17
Qatar ENERGY TECHNICAL SERVICES EPIC of Replacement of Fire Water Pumps At 11,748.24 06.Dec.16~ 28.Feb.17
Khatiyah Main And Ummbab
Qatar DELMON SCAFFOLDING Drilling 6" Diameter Borehole In Shahniyah 1,755.00 06.Dec.16~ 31.Jan.17
Qatar SIX CONSTRUCT LTD HIA Pizocone Penetration Tests 11,191.50 06.Dec.16~ 28.Feb.17
Qatar IMCO ENGINEERING & HIA-Extension of Taxiways And New Aircraft 19,887.12 07.Dec.16~ 28.Feb.17
CONSTRUCTION Parking Stands
Qatar GREEN ENERGY AND Geoenvironmental Works for HIA 14,114.93 14.Dec.16~ 28.Feb.17
ENVIRONMENTAL SERVICES
Qatar FIVES FCB - CASH CUSTOMER Drilling Earthing Boreholes Ummbab Project 16,915.50 14.Dec.16~ 31.Mar.17
Qatar MR. SALEH ALI S AL SHARQI Drilling Water Well in Salwa Road 6,750.00 21.Dec.16~ 28.Feb.17
Qatar AL RAYYAN OILS W.L.L Installation of Geoenvironmental boreholes 7,830.00 27.Dec.16~ 28.Feb.17
And Lab Tests
2015
Qatar ASHGHAL - FRAME WORK ROADS INFRASTRUCTURE RAWDAT RASHEED 290,984.33 04.Jan.15~ 31.Dec.17
CONTRACT (QS015) VILLAGE
Qatar ASHGHAL - FRAME WORK DW077- ROADS INFRASTRUCTURE RAWDAT 144,284.48 18.Feb.15~ 28.Sep.17
CONTRACT RASHEED VILLAGE
Qatar AL HUDA END WORKS AIN KHALID SCHOOL 9,013.02 24.Feb.15~ 31.Mar.15
Qatar JOANNOU & PARASKEVAIDES PIEZOCONE PENETRATIONTEST FOR ORBITAL 72,540.8 01.Feb.15~ 30.Apr.15
SITE
Qatar MSHEIREIB PROPERTIES ZULAL DESTINATION SPA AND FIVE STAR 162,768.77 08.Apr.15~ 31.Dec.15
RESORT
Qatar MWH QP GROUNDWATER FLOODING – MIC 311,734.6 12.Apr.15~ 30.Jun.17
Qatar SAMSUNG C&T FACILITY D INDEPENDENT POWER & WATER 346,784.32 12.Mar.15~ 31.Oct.15
PROJECT
Qatar ENERGO PROJEKT ENTEL LTD. LC14100900-FEED FOR EXTENSION OF 45,685.74 22.Mar.15~ 31.Oct.15
MANIFOLDS AT JALEHA, FS and KMDS
Qatar AL JABER PARTNERS W.L.L MESAIEED – UMM AL HOUL 42,044.28 03.May.15~ 30.Nov.15
Qatar KEO INTERNATIONAL QATAR UNIVERSITY ADMINISTRATION & 37,278.26 27.May.15~ 31.Aug.15
CONSULTYATNTS SERVICES BUILDING
Qatar GULF EARTH MOVING LAGOON AREA – NEW PORT PTOJECT, 114,944.01 14.Jun.15~ 31.Oct.15
MESAIEED, QATAR
Qatar HYDER CONSULTING AL DHAKIRA SEWAGE TREATMENT WORKS 234,744.95 23.Jun.15~ 31.Mar.16
TRANSFER PUMPING STATION AND
Qatar J&P NEW ORBITALPIPELINES
ASSOCIATED HIGHWAY & TRUCK ROUTE 29,240.14 15.Jul.15~ 30.Sep.15
JUNCTION - 17
Qatar AMIRI FLIGHT FACILITIES NDIA SITE INVESTIGATION WORKS 1,115,533.67 15.Aug.15~ 30.Apr.17
Qatar KATARA PROJECT GEOTECHNICAL AND BATHYMETRIC SURVEY 17,0084.36 25.Jul.15~ 31.Dec.15
Qatar CAT BOOM TRANSMISSION PIPELINE FOR MEGA 25,254.03 04.Aug.15~ 30.Nov.15
RESERVOIRS
Qatar HYDER CONSULTING MIDDLE MEGA RESERVIORS- GROUND INVESTIGATION 93,053.53 06.Aug.15~ 31.Jan.16
EAST
Qatar LARSEN & TOUBRO LIMITED GEOTECHNICAL INVESTIGATION FOR LUSAIL 49,383.49 13.Aug.15~ 30.Nov.16
WADI 66/11 KV SUBSTATION
Qatar AECOM NEW ORBITAL HIGHWAY AND TRUCK ROUTE 265,529.83 26.Aug.15~ 30.Nov.15
(PO23)
Qatar GEI CONSULTANTS NATIONAL CENTER FOR CANCER CARE AND 128,252.91 03.Oct.15~ 31.Mar.16
RESEARCH
Qatar LARSEN & TOUBRO LIMITED QATAR POWER TRANSMISSION SYSTEM 49,386.24 14.Sep.15~ 30.Apr.16
EXPANSION – PHASE 12 SUBSTATION
Qatar FOSTER & PARTNERS PASSENGER TERMINAL COMPLEX EXPANSION 544,4691.98 15.Sep.15~ 31.Mar.17
AT NEW DOHA HIA
Qatar BARADA CONTRACTING 8,702.7 21.Sep.15~ 31.Dec.15
COMPANY
Qatar LARSEN & TOUBRO LIMITED GEOPHYSICAL SURVEY WORKS FOR 86,271.52 29.Sep.15~ 31.Dec.16
SUBSTATION FOR LUSAIL WADI
Qatar HYDER CONSULTING LIMITED AL MAHA CENTER – HAMAD MEDICAL 10,3957.3 30.Sep.15~ 31.Mar.16
CORPOATION
Qatar HALCROW QATAR ACADEMY EXPANSION 11,0908.2 06.Oct.15~ 31.Mar.16
Qatar GSIC AL BAYT STADIUM – AL KHOR CITY PACKAGE 2 192,074.54 15.Oct.15 ~ 30.Apr.16
&4
Qatar QPMC QUARRY DEVELOPMENT IN AL SAQAA 12,020.11 02.Nov.15 ~ 30.Jun.17
Qatar ISG IMPREGILO RED LINE NORTH UNDERGROUND 109,644.68 05.Jul.15 ~ 31.Aug.15
Qatar CAPE EAST LIMITED SOIL THERMAL RESISTIVITY TEST 41,668.05 03.Oct.15 ~ 31.Dec.15
Qatar SALINI IMPREGILO ABU HAMOUR SURFACE & GROUND WATER 5,080.47 15.Jun.15 ~ 30.Nov.15
DRAINAGE TUNNEL – PHASE 1
Qatar SAMSUNG C&T ADDITIONAL SOIL INVESTIGATION UMM AL 14,159.39 03.Dec.15 ~ 31.Mar.16
CORPORATION HOULM
Qatar H.E SHEIKH AHMED KHALIFA PROPOSED PRIVATE VILLA IN RAYYAN 5,025.54 31.Oct.15 ~ 31.Dec.15
AL THANI
Qatar BATEC CONTRACTING PROPOSED RESIDENTIAL TOWER AT AL WAAB 2,746.2 02.Nov.15 ~ 31.Jan.16
2014
Location Client 2
Project Value (US$) Period
Qatar TR ENGINEERING CO. FEED FOR EXPANSION OF FUEL & GAS HEADER, 91,709 13.Apr.14 ~ 30.Sep.14
RLIC, QATAR.
Qatar ACTION INTERNATIONAL GEOTECHINCAL INVESTIGATION at DOHA 112,260 03.Feb.14 ~ 30.Apr.14
SERVICES LLC AIRPORT, QATAR.
Qatar ENERGOPROJEKT-ENTEL FEED FOR REPLACEMENT OF DIESEL ENGINE 38,469 16.Feb.14 ~ 31.Mar.15
DRIVEN IAC PACKAGEDUKHAN.
Qatar SAMSUNG C&T/MITSUBISHI QATAR FACILITY D/WPP-OFFSHORE PROJECT- 66,731 01.Mar.14 ~ 30.Apr.14
MESAIEED.
Qatar GHD GLOBAL PTY LTD FEED for SITE DEVELOPMENT AT MESAIEED 34,756 02.Mar.14 ~ 30.Jun.14
(MIC)-GEOPHYSICAL SURVEY
Qatar RASGAS CO. LTD GROUND WATER MONITORING WELLS, TIW 35,964 13.Mar.14 ~ 31.May.14
LOCATION
Qatar HYUNDAI HEAVY QATAR FACILITY D/WPP-OFFSHORE PROJECT- 66,649 10.Mar.14 ~ 30.Apr.14
INDUSTRIES MESAIEED.
Qatar GS ENGINEERING & CONSTR. QATAR FACILITY D/WPP-OFFSHORE PROJECT- 75,418 20.Mar.14 ~ 31.May.14
CORP MESAIEED.
Qatar GHD GLOBAL PTY LTD FEED for SITE DEVELOPMENT AT RLIC- 29,365 20.Mar.14 ~ 30.Apr.14
GEOPHYSICAL SURVEY
Qatar SHELL GLOBAL ENVIRONMENTAL WALKOVER SURVEY, AL 19,561 02.Apr.14 ~ 30.Jun.14
KARAANA PERTROCHEM. COMPLEX
Qatar URBACON INTERNATIONAL LUSAIL RECLAIMED ISLANDS- MARINE PROJECT 150,110 03.Apr.14 ~ 31.Jul.14
Qatar ALYSJ JV QATAR INTEGRATED RAIL PROJECT –GOLD LINE 945,855 21.Apr.14 ~ 31.Jan.16
UNDER GROUND
Qatar IMPREGILO CONSTRUCTION OF ABU 43,606 04.May.14 ~ 30.Sep.14
HAMOUR(MUSAIMEER) DRAINAGE TUNNEL -
Qatar PUBLIC WORKS AUTHORITY FRAME
Phase 1WORK CONTRACT 8,236,101 22.Jul.14 ~ 30.Sep.17
(ASHGHAL)
Qatar AL-ANDALUS PETROL GROUND WATER MONITORING WELLS 24,019 14.May.14 ~ 31.Jul.14
STATION
Qatar EXXON MOBIL RESEARCH SABKHA CORE DRILLING- AL ZAREQ AREA 14,649 20.May.14 ~ 30.Nov.14
QATAR
Qatar SWISSBORING QATAR EPIC OF WELLHEAD SCADA AND CATHODIC 4,667,124 01.Jun.14 ~ 31.May.16
PROTECTION IN DUKHAN
Qatar FIVES FCB Qatar Cement Plant - Ext.5 61,688 15.Jul.14 ~ 28.Feb.15
Qatar HYDER CONSULTING DOHA EXPRESSWAY GROUP 5 - Al Khor Bypass 700,819 24.Aug.14 ~ 30.Jun.16
Qatar SHELL GLOBAL SOLUTIONS Al Karaana Petrochemical Complex-Ras Laffan. 39,287 25.Aug.14 ~ 30.Sep.14
INTERNATIONAL BV - Call Off No.3
Qatar HYUNDAI ENGG & CONST. QEZ 3 Canal Excavation, Quay Walls and 433,087 18.Sep.14 ~ 31.Mar.15
CO. LTD. Channel Dredging
Qatar LANE - SOLID TADMUR A MMUP PH.2, PKG 14 (PACKAGE 1) 346,258 30.Sep.14 ~ 31.Jul.17
JOINT VENTURE
Qatar SHELL GLOBAL SOLUTIONS Al Karaana Petrochemical Complex, Ras Laffan- 10,322 30.Sep.14 ~ 31.Oct.14
INTERNATIONAL BV CALL OFF No.4
Qatar ENERGO PROJEKT ENTEL LC14104800-FEED FOR NEW CRUDE OIL 7,680.5 16.Feb.14 ~ 31.Mar.15
LTD. STORAGE TANK
2013
Location Client 2
Project Value (US$) Period
Qatar SOLETANCHE BACHY QATAR RED LINE NORTH UNDERGROUND. 80,900 31.Dec.13 ~ 31.May.14
W.L.L.
2012
QD-SBG DUKHAN ROAD PROJECT EAST CONTRACT LABORATORY TESTING WORKS 03-07-2017 - ONGOING
CONTRACT # TS-WSO-031-16
ORYX GTL LIMITED ENVIRONMENTAL ANALYTICAL SERVICES 01-04-2017 – ONGOING
CALL –OFF CONTRACT FOR
AMANA QATAR ENVIRONMENTAL
MANNAI ANALYTICAL
HEAD QUARTERS SERVICES
BUILDING
LABORATORY TESTING 24-01-2017 – ON GOING
CONTRACTING CO. CONSTRUCTION AT SALWA INDUSTRIAL
AREA
AL BAYT STADIUM PROJECT – AL KHOR NDT TECHNICIAN WITH INSTRUMENT FOR
GALFAR AL MISNAD 03-01-2017 – ON GOING
CITY BACK FILLING WORKS - PO NO. 4100688010
AMWAJ CATERING
POTABLE WATER SAMPLING LABORATORY TESTING WORKS 19-08-2015
SERVICES
SINO HYDRO GROUP DOHA EXPRESS WAY PACKAGE 6 LABORATORY TESING WORKS 29-06-2015
DRAIEH CONTRACTING
BURJ DAMAC WATER FRONT RES LABORATORY TESTING WORKS 17-05-2016
WLL
QATAR ALUMINIUM WATER COLLECTION & LEGIONELLA LABORATORY TESING WORKS 24-02-2015
CHIYODA ALMANA
WASTE WATER SAMPLING & ANALYSIS LABORATORY TESING WORKS 12-01-2015
ENGINEERING
QATAR KENTZ THIRD PARTY CIVIL LABORATORY SERVICES LABORATORY TESING WORKS 22-02-2015
AKTOR - FACILITY
WATER ANALYSIS LABORATORY TESTING WORKING 15-06-2014
MANAGEMENT
KEO INTERNATIONAL TREATED SEWAGE EFFLUENT SAMPLING LABORATORY TESTING WORKS 22-05-2014
CARILLION QATAR LLC ANALYSIS OF DRINKING WATER WATER SAMPLE TESTING 23-02-2014
CH2M HILL
DC-QOP-684C, WITH DOLPHIN ENERGY WATER ANALYSIS AND SERVICE 26-01-2014
INTERNATIONAL
DOHA PETROLEUM
POTABLE WATER ANALYSIS POTABLE WATER ANALYSIS 13-05-2013 completed
(DOPET)
URBACON GENERAL COAST GUARD PROJECTS, SUMAISMAH – WATER AND SEDIMENT QUALITY
17-04-2013 -Completed
CONTRACTING WATER AND SEDIMENT QUALITY MONITORING
MONITORING
TARGET ENGINEERING RAF A2 DESALINATION PLANT – SEA
LABORATORY TESTING WORKS 28-03-2013 completed
CONSTRUCTION CO. WATER INTAKE PUMP HOUSE & OFFICE
PIPE LINE WORKS – LABORATORY TESTING
CONSOLIDATED DUKHAN
WORKS – HIGHWAY PROJECT (CENTRAL
LABORATORY TESTING WORKS 27-03-2013 – completed
CONTRACTORS GROUP CONTRACT )
MARUBENI WATER SAMPLING AND ANALYSIS WATER SAMPLING AND ANALYSIS 05-02-2013 – completed
DESCON ENGINEERING PMP AND OTHER VARIOUS PROJECT LABORATORY TESTING WORKS 10/01/ completed
XYLEM WATER SOLUTION DOHA SOUTH WWTP WATER ANALYSIS 2013 – completed
PUNJ LLOYD PLOYSILICON PLANT RASLAFFAN LABORTORY TESTING WORKS 10/01/2012 completed
MEDGULF CONSTRUCTION TEST FOR EARTH WORKS SOIL TESTING 22/01/2012- completed
Q-CON 02-N2, PIPELINE BACKBONE IN RASLAFFAN LABORATORY TESTING SERVICES 07/06/2012 completed
SINOHYDRO GROUP KAHRAMA AWARENESS PARK PROJECT LABORATORY TESTING WORKS 01/07/2012 completed
REDCO INT’L Burj marina LABORATORY TESTING WORKS Mar 2011 completed
HYDER CONSULTING PACKAGE 24 – AL KHOR – AL THAKIRA SOIL AND GROUND WATER SAMPLING Apr 2011 - Oct 2011
DEGREMONT MARUBANI DOHA WEST SEWAGE TREATMENT WORKS WASTE WATER ANALYSIS Apr – 2011 completed
QATAR GAS SOIL SAMPLING AND ANALYSIS SOIL SAMPLING AND ANALYSIS Apr 2011 – completed
QATAR ALUMINIUM
SEA WATER SAMPLING AND ANALYSIS SEA WATER SAMPLING AND ANALYSIS May 2011 - completed
(QATALUM)
QATAR SHELLGTL TECHNOLOGY & SCIENCE PARK – QATAR ANALYSIS OF DESULPHIRIZATION SOLUTION
June 2011 completed
RESEARCH AND FOUNDATION FOR HEAVY METALS
TECHNOLOGY CENTRE
QATAR ENGINEERING AND
JETTY BOIL OF GAS RECOVERY LABORATORY TESTING WORKS June 2011 completed
CONSTRUCTION CO.
QATAR AIRWAYS CREW SOIL SAMPLING AND LABORATORY Jul 2011 -2012 -
REDCO INT’L
ACCOMMODATION TESTING WORKS Completed
REDCO INT’L DOHA LAND LABORATORY TESTING WORKS Jul 2011 On going
NASSER AL HAJRI BARZAN ONSHORE FACILITIES LABORATORY TESTING WORKS Sep 2011 On going
YUKSEL MIDMAC DOHA EXPRESS – PACKAGE 7 NUCLEAR DENSITY Nov 2011 -Completed
JGC CORPORATION BARZAN ONSHORE PROJECT SAMPLING AND ANALYSIS OF WATER Nov 2011- completed
Q-CON PLATEAU MAINTENANCE PROJECT LABORATORY TESTING WORKS Dec 2011 completed
Dec 2011
TECHNITAL DEVELOPMENT OF AL WAKRA JETTY ENVIRONMENTAL TESTING
completed
PUBLIC WORK AUTHORITY DRAINAGE NETWORKS ANALYSTICAL
TENDER#AA/DOM/10-11M/1398 Jan 2011 completed
(ASHGHAL) PROGRAMME
DA/07-08/D/025/1 – SECOND PHASE EXPANSION OF INDUSTRIAL AREA SEWAGE Jan 2011 Feb 2011--
HYDER CONSULTING`
EXPANSION OF INDUSTRIAL AREA TREATMENT FACILITY Completed
SEWERAGE TREATMENT FACILITY
SINOHYDRO ONSITE LABORATORY FOR SOIL,
NDIA – CP- 1 PROJECT – LUSAIL Year 2008 and Ongoing
CORPORATION AGGREGATE , CONCRETE , STEEL AND
ASPHALT TESTING
ONSITE LABORATORY FOR SOIL,
HYUNDAI ENGINEERING QAFCO 5 & QAFCO 6 July 2008 -Completed
AGGREGATE , CONCRETE , AND ASPHALT
TESTING
MALE & FEMALE STUDENTS HOUSING AT ONSITE LABORATORY FOR SOIL,
J&P PARASKEVAIDES Nov 2010 -Completed
QATAR FOUNDATION AGGREGATE , CONCRETE TESTING
QATAR ENGINEERING Q3 99 – WASTE WATER DISPOSAL SOIL, AGGREGATE AND CONCRETE TESTING
Feb 2011 completed
CONSTRUCTION SURFACE FACILITIES - CALL ON BASIS
QATAR CONSTRUCTION CONSTRUCTION OF OPERATATOR SHELTER SOIL, AGGREGATE AND CONCRETE TESTING
Dec 2012 completed
ENGINEERING LIFTING STATION AND SEWER NETWORK – - CALL ON BASIS
DOLPHIN
QATAR ENGINEERING ONSITE LABORATORY FOR SOIL,
Q 356 – HALUL ISLAND Feb 2011 -Completed
CONSTRUCTION AGGREGATE , CONCRETE , AND TESTING
REDCO INTERNATIONAL BARWA CITY PROJECT CONCRETE AND MATERIAL TESTING Jan 2010 – completed
CONSTRUCTION OF THE CULTURAL CONCRETE, MATERIALS AND IN-SITU Jan 2009 – April 2010-
GALFAR AL MISNAD
VILLAGE TESTING Completed
DEGREMONT DOHA WEST STP SEWAGE WATER ANALYSIS Jan 2009 On going
Mar 2010
DEGREMONT BARWA HOUSING PROJECT SEWAGE WATER ANALYSIS
Aug 2011--Completed
FIVE OCEANS – OMAN ODC ENVIRONMENTAL MONITORING ENVIRONMNETAL ANALYSIS Dec 2010 --Completed
Feb 2011
QDVC SHERATON CAR PARK GROUND WATER ANALYSIS
Jul 2011 --Completed
COMPASS CATERING QATAR SHELL GTL POTABLE WATER ANALYSIS March 2009 - Ongoing
DOLPHIN ENERGY GROUND WATER MONITORING WELLS ENVIRONMENTAL ANALYSIS Aug 2009 - Ongoing
RIG – GULF4, AL ZUBARAH, ADL DOHA, POTABLE WATER AND SEWAGE WATER
GULF DRILLING Aug 2008 – Ongoing
GULF 3 ANALYSIS
J&P PARASKEVAIDES PEARL QATAR SOIL AND AGGREGATE TESTING Feb 2009 – Ongoing
CONSTRUCTION OF ADVANCE WORKS FOR ONSITE LABORATORY FOR SOIL, Aug 2009 – Aug 2010-
J&P PARASKEVAIDES
THE CONVENTION CENTRE - QATAR AGGREGATE , CONCRETE TESTING Completed
FOUNDATION
J&P PARASKEVAIDES AL WAKRAH HOSPITAL ASPHALT TESTING Jun 2010 – May 2011
DOHA SOUTH STW & INDUSTRIAL AREA AUG 2009 – OCT 2010-
VEOLIA QATAR SAMPLING & ANALYSIS OF SEWAGE WATER
STP Completed
QATAR ALUMINUM QATALUM SEA WATER AND WASTE WATER ANALYSIS Jan 2010 --Completed
QATAR AIRWAYS WATER ANALYSIS POTABLE WATER ANALYSIS Apr 2010 – Ongoing
QATAR COOL PEARL QATAR CHILLED WATER ANALYSIS Apr 2010 – Ongoing
QATAR COOL WEST BAY DISTRICT COOLING CHILLED WATER ANALYSIS Apr 2010 – Ongoing
SIX CONSTRUCT SEWAGE TREATMENT PLANT SEWAGE WATER SAMPLING AND ANALYSIS Aug 2010 – Ongoing
WAAGNERBIRO QATAR ASGHAL SEWAGE WATER SAMPLING AND ANALYSIS Oct 2009 - Ongoing
Mar-06
URS CORPORATION ORYX GTL, RAS LAFFAN ENVIRONMENTAL TESTING
Feb 2009-Completed
Mar 2006 – Jun 2009-
A.A. ENGINEERING INDUSTRIAL AREA STW SEWAGE WATER TESTING
Completed
DESCON ENG.CO OLEFIN PROJECT, RAS LAFFAN MATERIALS AND IN-SITU TESTING Jul 2006- Jul 2009
Sep2006-
FLUOR MIDDLE EAST RAS GAS, RAS LAFFAN MATERIALS AND IN-SITU TESTING
Apr 2009-Completed
Sep 2006- Mar 2009-
NASSER AL HAJRI RAS GAS, RAS LAFFAN MATERIALS AND IN-SITU TESTING
Completed
CDC/TAKENAKA NEW INTERNATIONAL AIRPORT SOIL, & CONCRETE TESTING Sep 2006- Ongoing
ITT INDUSTRIES DOHA SOUTH SEWAGE WATER ANALYSIS SEWAGE WATER TESTING Jun - Jul 2005-Completed
ASHGHAL AL DHAKIRA SEWAGE TREATMENT WORK SEWAGE WATER TESTING May - Jun 2005-Completed
BASE LINE SURVEY OF GROUND WATER GROUNDWATER SAMPLING AND Jul 2004 – Apr 2008-
QATAR PETROLEUM
MONITORING WELLS AT MIC LABORATORY TESTING. Completed
NEW DOHA INTERNATIONAL AIRPORT SOIL AND WATER SAMPLING AND TESTING
OVERSEAS BECHTEL INC. Feb - Aug 2004-Completed
PROJECT FOR VARIOUS CONTAMINANT SPECIES
AL BAIDA TECHNICAL DEEP WELL DRILLING PROJECTS, SW HEAVY METAL ANALYSIS OF GROUND
Jul-03-Completed
SERVICES QATAR WATER SAMPLES
MMAA – DRAINAGE GROUND WATER SAMPLING AND GROUND WATER SAMPLING AND
May-03-Completed
DEPARTMENT ANALYTICAL LABORATORY TESTING – LABORATORY TESTING FOR VARIOUS
PUMP STATIONS ENVIRONMENTAL CONTAMINANT SPECIES
MMAA – DRAINAGE IMPACT STUDY LABORATORY ANALYSIS OF SEWAGE
CP-505 INDUSTRIAL AREA SEWERAGE Feb-03-Completed
DEPARTMENT SAMPLES
WOQOD BITUMEN STORAGE AND SOIL AND WATER SAMPLING AND TESTING
QATAR PETROLEUM Jan-03-Completed
LOADING FACILITIES – MESAIEED FOR VARIOUS CONTAMINANT SPECIES
MMAA – DRAINAGE MARINE WATER, LAKE SURFACE WATER & Jun 2002 - Apr 2003-
ABU HAMOUR SOUTHERN OUT FALL.
DEPARTMENT SEDIMENT AND DISCHARGE WATER Completed
SAMPLING AND ANALYSIS FOR
QATARGAS – DEBOTTLENECKING PROJECT, CONTAMINATION STUDY. OFFSHORE Jul 2002 – Jul 2005-
GULF HOUSING & CONST. MATERIALS AND IN-SITU TESTING
RAS LAFFAN CURRENT AND TIDAL MONITORING. Completed
READINESS MANAGEMENT U.S. AIRBASE, AL UDEID ASPHALT AND CONCRETE TESTING WORKS Apr - Jun 2002-Completed
RAS ABU FONTAS, SAILIYAH, WAJBAH AND SAMPLING AND ANALYSIS OF SOIL AND
ERM / LAHMYER Sep-01-Completed
DOHA SOUTH – EIA WATER FOR CONTAMINATION STUDY
NGL-4 BASE CASE, NGL-3 AND NGL TANK SAMPLING AND ANALYSIS OF SOIL AND
DAMES & MOORE Aug-99-Completed
FARM – ENVIRONMENTAL IMPACT WATER FOR CONTAMINATION STUDY
ASSESSMENT
MIDMAC CONTRACTING LAB AND FIELD TESTING OF SOIL, CONCRETE
QAFCO – III EXPANSION, MESAIEED 1996 – 1998-Completed
CO & AGGREGATE
QATAR GAS UPSTREAM PROJECT, RAS ALL TESTING WORKS INCLUDING ONSITE
TOYO ENGINEERING 1995 – 1998-Completed
LAFFAN LABORATORY
APPENDIX D
Insoluable Residue
Standard Test Methods for Chemical
214 Cement ASTM C 114 Analysis of Hydraulic Cements Cl. 10
Fe2O3
Standard Test Methods for Chemical
215 Cement ASTM C 114 Analysis of Hydraulic Cements Cl. 14 -
Al2O3
Standard Test Methods for Chemical
216 Cement ASTM C 114 Analysis of Hydraulic Cements; Cl. 18 -
Loss on Ignition
Standard Test Methods for Chemical
217 Cement ASTM C 114-15 Analysis of Hydraulic Cements; Cl. 23 -
CaO (Alternative Method)
Standard Practice for Sampling Bituminous
218 Asphalt ASTM D 979/D 979M
Paving Mixtures
Standard Practice for Sampling
219 Asphalt ASTM D 5361/D 5361M Compacted Bituminous Mixtures for
Laboratory Testing
Preparation of Bituminous Specimens
220 Asphalt ASTM D 6926
using Marshall apparatus
Standard Test Method for Bulk Specific
221 Asphalt ASTM D 2726/D 2726M Gravity and Density of Non Absorptive
Compacted Bituminous Mixtures
Bulk Specific Gravity and density of
222 Asphalt ASTM D 1188 Compacted Bituminous Mixtures using
Coated samples.
Standards Test Method for Theoretical
Maximum Specific Gravity and Density of
223 Asphalt ASTM D 2041/D 2041M
Bituminous Paving Mixture. Procedure
9.5.1 (Weighing in water)
Standard Test Method for Thickness or
224 Asphalt ASTM D 3549/D 3549M Height of Compacted Bituminous Paving
Mixture Specimens
Standard Test For Marshall Stability and
225 Asphalt ASTM D 6927
Flow of Bituminous Materials
Standard Practice for Estimating
Tack Coat/Prime
226 ASTM D 2995 Application Rate and Residual Application
Coat
Rate of Bituminous Distributors
Quantitative Extraction of Bitumen from
227 Asphalt ASTM D 2172/D 2172M Bituminous Paving Mixtures Ashing
Method Clause 11.6.1
Standard Test Method for Mechanical Size
228 Aggregates ASTM D5444
Analysis of Extracted Aggregate
Standard Test Method for Density of
229 Asphalt ASTM D 2950/D 2950M
Bituminous Concrete in Place by Nuclear
Methods
Bituminous mixtures-Test Methods for Hot
230 Asphalt BS EN 12697-27:2001
Mix Asphalt- Sampling
Bituminous mixtures-Test Methods for Hot
Mix Asphalt- Preparation of samples for
231 Asphalt BS EN 12697-28:2001
determining binder content, water content
and grading
Bituminous Mixtures Test Method for Hot
232 Asphalt BS EN 12697-Part 30:2012 Mix Asphalt , Specimen preparation by
Impact Compactor
Bituminous mixtures. Test Methods for Hot
233 Asphalt BS EN 12697-Part 1:2012 Mix Asphalt. Soluble binder content.
Centrifuge extraction method
Bituminous Mixtures Test Method for Hot
234 Asphalt BS EN 12697-Part 2:2015 Mix Asphalt, Determination of Particle size
Distribution
Bituminous mixtures-Test Methods for Hot
235 Asphalt BS EN 12697-5:2009 Mix Asphalt- Determination of the
maximum density
Bituminous mixtures-Test Methods for Hot
236 Asphalt BS EN 12697-6:2012 Mix Asphalt- Determination of bulk density
of bituminous specimens
Bituminous mixtures-Test Methods for Hot
237 Asphalt BS EN 12697-8:2003 Mix Asphalt- Determination of void
characteristics of bituminous specimens
Bituminous mixtures-Test Methods for Hot
238 Asphalt BS EN 12697-9:2002 Mix Asphalt- Determination of the
reference density
Bituminous mixtures-Test Methods for Hot
239 Asphalt BS EN 12697-13_2000
Mix Asphalt- Temperature measurement
Bituminous mixtures- Test Methods for Hot
240 Asphalt BS EN 12697-29:2002 Mix Asphalt- Determination of the
dimensions of a bituminous specimen
Bituminous Mixtures Test Method for Hot
241 Asphalt BS EN 12697-Part 34:2012
Mix Asphalt, Marshall Test
Bituminous mixtures-Test Methods for Hot
242 Asphalt BS EN 12697-35:2004
Mix Asphalt- Laboratory mixing
Bituminous Mixtures Test Method for Hot
243 Asphalt BS EN 12697-Part 36:2003 Mix Asphalt, Determination of thickness of
a Bituminous Pavement
Bituminous mixtures- Test Methods for Hot
244 Asphalt BS EN 12697-39:2012
Mix Asphalt- Binder content by ignition
Bituminous mixtures-Test Methods for Hot
245 Asphalt BS EN 12697- 26:2012
Mix Asphalt- Stiffness
Sodium Na
Standard Methods for the Examination of
Environmental
Water and Wastewaters 22nd Edition:
311 Chemistry - Water APHA/AWWA 3120 B
2012 ICP-Atomic Emission Spectroscopy
and Wastewater
Potassium K
Standard Methods for the Examination of
Environmental
Water and Wastewaters 22nd Edition:
312 Chemistry - Water APHA/AWWA 3120 B
2012 ICP-Atomic Emission Spectroscopy
and Wastewater
Iron Fe
Standard Methods for the Examination of
Environmental
Water and Wastewaters 22nd Edition:
313 Chemistry - Water APHA/AWWA 3120 B
2012 ICP-Atomic Emission Spectroscopy
and Wastewater
Aluminum Al
Standard Methods for the Examination of
Environmental
Water and Wastewaters 22nd Edition:
314 Chemistry - Water APHA/AWWA 3120 B
2012 ICP-Atomic Emission Spectroscopy
and Wastewater
Arsenic As
Standard Methods for the Examination of
Environmental
Water and Wastewaters 22nd Edition:
315 Chemistry - Water APHA/AWWA 3120 B
2012 ICP-Atomic Emission Spectroscopy
and Wastewater
Cadmium Cd
Standard Methods for the Examination of
Environmental
Water and Wastewaters 22nd Edition:
316 Chemistry - Water APHA/AWWA 3120 B
2012 ICP-Atomic Emission Spectroscopy
and Wastewater
Chromium Cr
Standard Methods for the Examination of
Environmental
Water and Wastewaters 22nd Edition:
317 Chemistry - Water APHA/AWWA 3120 B
2012 ICP-Atomic Emission Spectroscopy
and Wastewater
Cobalt Co
Standard Methods for the Examination of
Environmental
Water and Wastewaters 22nd Edition:
318 Chemistry - Water APHA/AWWA 3120 B
2012 ICP-Atomic Emission Spectroscopy
and Wastewater
Copper Cu
Standard Methods for the Examination of
Environmental
Water and Wastewaters 22nd Edition:
319 Chemistry - Water APHA/AWWA 3120 B
2012 ICP-Atomic Emission Spectroscopy
and Wastewater
Nickel Ni
Standard Methods for the Examination of
Environmental
Water and Wastewaters 22nd Edition:
320 Chemistry - Water APHA/AWWA 3120 B
2012 ICP-Atomic Emission Spectroscopy
and Wastewater
Phosphorus P
Standard Methods for the Examination of
Environmental
Water and Wastewaters 22nd Edition:
321 Chemistry - Water APHA/AWWA 3120 B
2012 ICP-Atomic Emission Spectroscopy
and Wastewater
Zinc Zn
Electrical
Insulating Liquids Standard Test Method for Corrosive Sulfur
456 ASTM D1275
(Transformer in Electrical Insulating Oils
Oils)
Electrical Standard Test Method for density, relative
Insulating Liquids density, or API gravity of crude petroleum
457 ASTM D1298
(Transformer and liquid petroleum products by
Oils) hydrometer method
Electrical
Insulating Liquids Standard Test Method for ASTM Color of
458 ASTM D1500
(Transformer Petroleum Products (ASTM Color Scale)
Oils)
Electrical
Standard Test Method for Dielectric
Insulating Liquids
459 ASTM D1816 Breakdown Voltage of Insulating Liquids
(Transformer
Using VDE Electrodes
Oils)
Electrical Petroleum products -- Transparent and
Insulating Liquids opaque liquids -- Determination of
460 ISO 3104
(Transformer kinematic viscosity and calculation of
Oils) dynamic viscosity
ElectricalInsulating
Petroleum products -- Determination of
461 Liquids ISO 2049
colour (ASTM scale)
(TransformerOils)
Electrical
Insulating Liquids Insulating liquids - Determination of acidity
462 IEC 62021
(Transformer - Part 1: Automatic potentiometric titration
Oils)
Electrical
Insulating liquids - Determination of the
Insulating Liquids
463 IEC 60156 breakdown voltage at power frequency -
(Transformer
Test method
Oils)
Electrical
Insulating Liquids Insulating liquids - Methods for counting
464 IEC 60970
(Transformer and sizing particles
Oils)
Electrical
Insulating liquids - Test method for
Insulating Liquids
465 IEC 62535 detection of potentially corrosive sulphur in
(Transformer
used and unused insulating oil
Oils)
Electrical
Insulating Liquids
466 GL-SOP-PL-07 NAS 1638 Particle Count in Oils
(Transformer
Oils)
Electrical Standard Test Method for Analysis of
467 Insulating Liquids ASTM D3612 Gases Dissolved in Electrical Insulating Oil
(Transformer by Gas Chromatography (ASTM D3612
Oils) Method C)
Electrical
Oil-filled electrical equipment - Sampling of
Insulating Liquids
468 IEC 60567 gases and analysis of free and dissolved
(Transformer
gases - Guidance
Oils)
Electrical Standard Test Method for Dissipation
Insulating Liquids Factor (or Power Factor) and Relative
469 ASTM D924
(Transformer Permittivity (Dielectric Constant) of
Oils) Electrical Insulating Liquids
Electrical
Insulating liquids - Measurement of relative
Insulating Liquids
470 IEC 60247 permittivity, dielectric dissipation factor (tan
(Transformer
d) and d.c. resistivity
Oils)
Electrical Standard Test Method for Furanic
Insulating Liquids Compounds in Electrical Insulating Liquids
471 ASTM D5837
(Transformer by High-Performance Liquid
Oils) Chromatography (HPLC)
Electrical
Mineral insulating oils -Methods for the
Insulating Liquids
472 IEC 61198 determination of 2-furfural and related
(Transformer
compounds.
Oils)
Electrical
Standard Test Method forWater in
Insulating Liquids
473 ASTM D1533 Insulating Liquids by Coulometric Karl
(Transformer
Fischer Titration
Oils)
Electrical Insulating liquids —Oil-impregnated paper
Insulating Liquids and pressboard — Determination of water
474 IEC 60814
(Transformer by automatic coulometric Karl Fischer
Oils) titration
Mineral insulating oils in electrical
ElectricalInsulating
equipment – Supervision and maintenance
475 Liquids IEC 60422 Annex C C.1
guidance Test method for determination of
(TransformerOils)
sediment
Mineral insulating oils in electrical
equipment – Supervision and maintenance
Electrical
guidance Test method for determination of
Insulating Liquids IEC 60422 Annex Clause C.2 /
476 sediment Unused hydrocarbon-based
(Transformer IEC 61125 Cl 1.9.1
insulating liquids —Test methods for
Oils)
evaluating the oxidation stability - Clause
1.9.1 Sludge formation
Chemical Analysis of Limestone,
Quicklime, and Hydrated Lime Insoluble
477 Limestone ASTM C 25
Matter Including Silicon Dioxide-Optional
Perchloric Acid Method Cl. 9)
478 Limestone ASTM C 25 Chemical Analysis of Limestone,