The research project arises from the need to initiate formal technical and mining
The research aims to calculate the proven and probable reserves of the deposit,
propose a plan based mining with an average production rate of 341,000 TM per
To determine the field's reserves the Minesight software was used with the help
remove approximately 1,000 MT / day was proposed, will ensure that the hourly
cost of equipment and the unit cost of production are adequate to the ratio benefit
- cost is greater than 1.5, the environmental characteristics of the concession and
the surrounding area was identified to determine the impacts before, during and
At the deposit it does not have electricity of 440 V, which is required by the rig
long drills, so they had to work with a pneumatic drill, with the first option to punch
Jack Leg but is not meet the characteristics required in the mining method, so we
The economic analysis of the project shows the high level of performance as the
XVIII
INTRODUCCION
que vaya de acuerdo a la realidad del titular, tiene como objetivo aprovechar al
XIX
20
CAPITULO I
agrícola y dinamita.
El