Вы находитесь на странице: 1из 28

𝑆𝑎𝑛𝑑 = 0.450𝑚3 × 0.50 = 0.

225𝑚3
1. EXCAVATION: 𝐺𝑟𝑎𝑣𝑒𝑙 = 0.450𝑚3 × 1.00 = 0.450𝑚3

Volume for C1F1 𝑅𝑆𝐵 − (9 − 16𝑚𝑚∅ × 6𝑚)


9.00 × 1.00
𝑉 =𝑙×𝑤×ℎ 𝑅𝑆𝐵 =
6
𝑉 = 1.5𝑚 × 1.5𝑚 × 1.5𝑚 𝑅𝑆𝐵 = 1.5 ≈ 2𝑝𝑐. (16𝑚𝑚∅ × 6𝑚)
𝑉 = 3.375𝑚3 × 15(𝑐𝑜𝑙𝑢𝑚𝑛𝑠)
𝑉 = 50.6250𝑚3 𝑻𝒊𝒆 𝒘𝒊𝒓𝒆
𝑁𝑜. 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑡𝑖𝑒𝑠
4 × 9 = 36 𝑝𝑐𝑠
Volume for Ground Floor Beam
𝑉 =𝑙×𝑤×ℎ 𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑡𝑖𝑒𝑠
𝑉 = 58.70𝑚 × 0.3𝑚 × 0.3𝑚 36 × 0.30𝑚 = 10.80 𝑚
𝑉 = 5.280𝑚3 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠.
1𝑘𝑔 1
10.80 𝑚 × = 0.20𝑘𝑔 ≈ 0.25𝑘𝑔. 𝑜𝑟 𝑘𝑔
53𝑚 4
Volume for Wall Footing 𝑺𝒖𝒎𝒎𝒂𝒓𝒚:
𝑉 =𝑙×𝑤×ℎ 𝐶𝑒𝑚𝑒𝑛𝑡 = 4.05𝑏𝑎𝑔𝑠 × 15 = 60.75 ≈ 61 𝑏𝑎𝑔𝑠
𝑉 = 20.48𝑚 × 0.3𝑚 × 0.3𝑚 𝑆𝑎𝑛𝑑 = 0.225𝑚3 × 15 = 3.375 ≈ 4.00𝑚3
𝑉 = 1.840𝑚3 𝐺𝑟𝑎𝑣𝑒𝑙 = 0.450𝑚3 × 15 = 6.750 ≈ 7.00𝑚3
𝑅𝑆𝐵 = 2𝑝𝑐.× 15 = 30𝑝𝑐𝑠 (16𝑚𝑚∅ × 6𝑚)
3
Total Excavation for C1F1 𝑇𝑖𝑒 𝑤𝑖𝑟𝑒 = 0.25 × 15 = 3.75 𝑜𝑟3 𝑘𝑔.
4
𝐸𝑥𝑐𝑎𝑣𝑎𝑡𝑖𝑜𝑛 𝑇 = 𝑉𝑐𝑜𝑙𝑢𝑚𝑛 𝑓𝑜𝑜𝑡𝑖𝑛𝑔 +
𝑉𝑤𝑎𝑙𝑙𝑓𝑜𝑜𝑡𝑖𝑛𝑔 +𝑉𝑓𝑙𝑜𝑜𝑟𝑏𝑒𝑎𝑚 𝑽𝒐𝒍𝒖𝒎𝒆 𝒇𝒐𝒓 𝑪𝟏𝑭𝟏(𝟏𝒔𝒕 𝒇𝒍𝒐𝒐𝒓)
3 3 3
𝐸𝑥𝑐𝑎𝑣𝑎𝑡𝑖𝑜𝑛 𝑇 = 50.625𝑚 + 5.280𝑚 + 1.84𝑚 𝑉 =𝑙×𝑤×ℎ
𝐸𝑥𝑐𝑎𝑣𝑎𝑡𝑖𝑜𝑛 𝑇 = 57.745 𝑚3 𝑉 = 0.30𝑚 × 0.30𝑚 × 3.3𝑚
𝑉 = 0.297𝑚3

2. backfill 𝐶𝑒𝑚𝑒𝑛𝑡 = 0.297𝑚3 × 9 = 2.673 𝑏𝑎𝑔𝑠


𝑆𝑎𝑛𝑑 = 0.297𝑚3 × 0.5 = 0.15𝑚3
𝐺𝑟𝑎𝑣𝑒𝑙 = 0.297𝑚3 × 1 = 0.297𝑚3
Volume for C1F1
𝑹𝑺𝑩
𝑉 =𝑙×𝑤×ℎ
∙ 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (9 − 16𝑚𝑚∅ × 6𝑚)
𝑉 = 1.5𝑚 × 1.2𝑚 × 1.15𝑚 ∙ 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 & 𝑇𝑖𝑒𝑠
𝑉 = 2.07𝑚3 × 15(𝑐𝑜𝑙𝑢𝑚𝑛𝑠) 3 × 0.05 = 0.150𝑚
𝑉 = 31.050𝑚3 3 × 0.075 = 0.2250𝑚
3 × 0.10 = 0.30𝑚
= 0.675𝑚 ≈ 675𝑚𝑚
3. COLUMN & FOOTINGS: 𝑅𝑒𝑠𝑡@ 0.2𝑚 ≈ 200𝑚𝑚

Concrete Footing for C1F1 𝑺𝒕𝒊𝒓𝒓𝒖𝒑𝒔


𝑉 =𝑙×𝑤×ℎ 4300𝑚𝑚
− 675𝑚𝑚 = 14750𝑚𝑚
𝑉 = 1.5𝑚 × 1.5𝑚 × 0.20𝑚 2
1475𝑚𝑚
𝑉 = 0.450𝑚3 = 7.38 ≈ 8𝑝𝑐𝑠.
200𝑚𝑚
3 + 3 + 3 + 8 = 17𝑝𝑐𝑠. = 17𝑝𝑐𝑠.
𝐶𝑒𝑚𝑒𝑛𝑡 = 0.450𝑚3 × 9.00 = 4.05 𝑏𝑎𝑔𝑠
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 = 1.1𝑚 𝑅𝑒𝑠𝑡@ 0.2𝑚 ≈ 200𝑚𝑚
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 𝑝𝑒𝑟 𝑝𝑖𝑒𝑐𝑒 𝑺𝒕𝒊𝒓𝒓𝒖𝒑𝒔
6𝑚 4300𝑚𝑚
= 5.45𝑝𝑐𝑠 − 675𝑚𝑚 = 14750𝑚𝑚
1.1𝑚 2
𝑵𝒐. 𝒐𝒇 𝑹𝑺𝑩 1475𝑚𝑚
= 7.38 ≈ 8𝑝𝑐𝑠.
17 200𝑚𝑚
= 3.07 ≈ 4𝑝𝑐𝑠. (10𝑚𝑚∅ × 6𝑚)
5.45 3 + 3 + 3 + 8 = 17𝑝𝑐𝑠. = 17𝑝𝑐𝑠.

𝑻𝒊𝒆 𝒘𝒊𝒓𝒆 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 = 1.1𝑚


𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 4 × 17 𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 68 𝑡𝑖𝑒𝑠 𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 𝑝𝑒𝑟 𝑝𝑖𝑒𝑐𝑒
6𝑚
= 5.45𝑝𝑐𝑠
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚 1.1𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒𝑠 = 68 × 0.30𝑚 𝑵𝒐. 𝒐𝒇 𝑹𝑺𝑩
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒𝑠 = 20.40𝑚 17
= 3.07 ≈ 4𝑝𝑐𝑠. (10𝑚𝑚∅ × 6𝑚)
5.45
𝑵𝒐. 𝒐𝒇 𝒌𝒈𝒔.
𝑻𝒊𝒆 𝒘𝒊𝒓𝒆
1𝑘𝑔 1
20.40𝑚 × = 0.38𝑘𝑔𝑠. ≈ 0.50𝑘𝑔𝑠. 𝑜𝑟 𝑘𝑔𝑠. 𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 4 × 17
53𝑚 2
𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 68 𝑡𝑖𝑒𝑠
𝑺𝒖𝒎𝒎𝒂𝒓𝒚:
𝐶𝑒𝑚𝑒𝑛𝑡 = 2.673𝑏𝑎𝑔𝑠 × 15 = 40.095 ≈ 41 𝑏𝑎𝑔𝑠 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚
𝑆𝑎𝑛𝑑 = 0.15𝑚3 × 15 = 2.25 ≈ 3.00𝑚3 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒𝑠 = 68 × 0.30𝑚
𝐺𝑟𝑎𝑣𝑒𝑙 = 0.297𝑚3 × 15 = 4.455 ≈ 4.50𝑚3 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒𝑠 = 20.40𝑚
𝑅𝑆𝐵
9 × 15 = 135𝑝𝑐𝑠. 16𝑚𝑚∅ × 6𝑚 𝑵𝒐. 𝒐𝒇 𝒌𝒈𝒔.
4 × 15 = 60𝑝𝑐𝑠. 10𝑚𝑚∅ × 6𝑚 1𝑘𝑔 1
20.40𝑚 × = 0.38𝑘𝑔𝑠. ≈ 0.50𝑘𝑔𝑠. 𝑜𝑟 𝑘𝑔𝑠.
53𝑚 2
𝑇𝑖𝑒 𝑤𝑖𝑟𝑒 = 0.5𝑘𝑔.× 15 = 7.5
1
≈ 7 𝑘𝑔𝑠. #16 𝐺. 𝐼. 𝑊𝑖𝑟𝑒 𝑺𝒖𝒎𝒎𝒂𝒓𝒚:
2
𝐶𝑒𝑚𝑒𝑛𝑡 = 2.916𝑏𝑎𝑔𝑠 × 15 = 43.74 ≈ 44 𝑏𝑎𝑔𝑠
𝑆𝑎𝑛𝑑 = 0.162𝑚3 × 15 = 2.43 ≈ 3.00𝑚3
𝑽𝒐𝒍𝒖𝒎𝒆 𝒇𝒐𝒓 𝑪𝟏𝑭𝟏(𝟐𝒏𝒅 𝒇𝒍𝒐𝒐𝒓) 𝐺𝑟𝑎𝑣𝑒𝑙 = 0.324𝑚3 × 15 = 4.86 ≈ 5.00𝑚3
𝑉 =𝑙×𝑤×ℎ 𝑅𝑆𝐵
𝑉 = 0.30𝑚 × 0.30𝑚 × 3.6𝑚 9 × 15 = 135𝑝𝑐𝑠. 16𝑚𝑚∅ × 6𝑚
𝑉 = 0.324𝑚3 4 × 15 = 60𝑝𝑐𝑠. 10𝑚𝑚∅ × 6𝑚

𝐶𝑒𝑚𝑒𝑛𝑡 = 0.324𝑚3 × 9 = 2.916 𝑏𝑎𝑔𝑠 𝑇𝑖𝑒 𝑤𝑖𝑟𝑒 = 0.5𝑘𝑔.× 15 = 7.5


𝑆𝑎𝑛𝑑 = 0.324𝑚3 × 0.5 = 0.162𝑚3 1
≈ 7 𝑘𝑔𝑠. #16 𝐺. 𝐼. 𝑊𝑖𝑟𝑒
𝐺𝑟𝑎𝑣𝑒𝑙 = 0.324𝑚3 × 1 = 0.324𝑚3 2

𝑹𝑺𝑩
∙ 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (9 − 16𝑚𝑚∅ × 6𝑚)
4. Wall footing:
∙ 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 & 𝑇𝑖𝑒𝑠
3 × 0.05 = 0.150𝑚 Volume for Wall Footing
3 × 0.075 = 0.2250𝑚
𝑉 =𝑙×𝑤×ℎ
3 × 0.10 = 0.30𝑚
𝑉 = 20.48𝑚 × 0.3𝑚 × 0.3𝑚
= 0.675𝑚 ≈ 675𝑚𝑚
𝑉 = 1.840𝑚3
𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑊𝑎𝑙𝑙 = 3.3𝑚
3
𝐶𝑒𝑚𝑒𝑛𝑡 = 1.84𝑚 × 9.00 = 16.56 ≈ 17 𝑏𝑎𝑔𝑠 𝐴𝑟𝑒𝑎 = 14.705𝑚 × 3.30𝑚
𝑆𝑎𝑛𝑑 = 1.84𝑚3 × 0.50 = 0.92 ≈ 1.0𝑚3 𝐴𝑟𝑒𝑎 = 48.53𝑚2
𝐺𝑟𝑎𝑣𝑒𝑙 = 1.84𝑚3 × 1.00 = 1.84 ≈ 2.0𝑚3
𝑫𝒆𝒅𝒖𝒄𝒕𝒊𝒐𝒏𝒔
𝑊𝑖𝑛𝑑𝑜𝑤 (1) = 3(1.20𝑚 × 1.2𝑚) = 4.32𝑚2
𝐷𝑜𝑜𝑟1 = 3(.90𝑚 × 2.1𝑚) = 5.67𝑚2
𝑹𝑺𝑩
Window = 3(.46m x 1.66 m) = 2.29𝑚2
𝑉𝑒𝑟𝑡𝑖𝑐𝑎𝑙 𝑢𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
𝑇𝑜𝑡𝑎𝑙 𝐷𝑒𝑑𝑢𝑐𝑡𝑖𝑜𝑛𝑠 = 12.28𝑚2
6.9 × 48.97 = 337.893𝑚
337.893𝑚 𝑇𝑜𝑡𝑎𝑙 𝐴𝑟𝑒𝑎 𝐶𝑜𝑣𝑒𝑟𝑒𝑑 = 48.53𝑚2 − 12.28𝑚2
𝑁𝑜. 𝑜𝑓 𝑅𝑆𝐵 = = 56.32 ≈ 57𝑝𝑐𝑠. = 36.25𝑚2
6𝑚
𝑁𝑜. 𝑜𝑓 6" 𝐶𝐻𝐵 = 36.25𝑚2 × 12.50 = 453.13
𝐻𝑜𝑟𝑖𝑧𝑜𝑛𝑡𝑎𝑙 𝑢𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
≈ 454𝑝𝑐𝑠.
52.28𝑚
𝑁𝑜. 𝑜𝑓 𝑅𝑆𝐵 𝑛𝑒𝑒𝑑𝑒𝑑 = = 87.14 ≈ 88𝑝𝑐𝑠 𝑳𝒆𝒇𝒕 − 𝒔𝒊𝒅𝒆 𝑷𝒂𝒓𝒕 𝒐𝒇 𝒕𝒉𝒆 𝑾𝒂𝒍𝒍
0.60𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑊𝑎𝑙𝑙 = 10.45𝑚
𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑊𝑎𝑙𝑙 = 3.30𝑚
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.35𝑚
𝐴𝑟𝑒𝑎 = 10.45𝑚 × 3.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 88 × 0.35𝑚 = 30.80𝑚
𝐴𝑟𝑒𝑎 = 34.49𝑚2
30.8𝑚
𝑁𝑜. 𝑜𝑓 𝑅𝑆𝐵 = = 5.13 ≈ 6𝑝𝑐𝑠 𝑇𝑜𝑡𝑎𝑙 𝐴𝑟𝑒𝑎 𝐶𝑜𝑣𝑒𝑟𝑒𝑑 = 34.49𝑚2
6𝑚
𝑇𝑜𝑡𝑎𝑙 𝑁𝑜. 𝑜𝑓 𝑅𝑆𝐵 = 88 + 6 + 57 = 151𝑝𝑐𝑠. 𝑁𝑜. 𝑜𝑓 6" 𝐶𝐻𝐵 = 34.49𝑚2 × 12.50 = 431.13
≈ 432𝑝𝑐𝑠.

𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝑹𝒊𝒈𝒉𝒕 − 𝒔𝒊𝒅𝒆 𝑷𝒂𝒓𝒕 𝒐𝒇 𝒕𝒉𝒆 𝑾𝒂𝒍𝒍 𝒂𝒏𝒅 𝒇𝒊𝒓𝒆𝒘𝒂𝒍𝒍
𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 151 × 3 = 453 𝑡𝑖𝑒𝑠
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑊𝑎𝑙𝑙 = 13.068𝑚
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚 𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑊𝑎𝑙𝑙 = 3.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 453 × 0.20𝑚 = 90.6𝑚 𝐴𝑟𝑒𝑎 = 13.068 × 3.30𝑚
1𝑘𝑔 𝐴𝑟𝑒𝑎 = 43. .13𝑚2
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 90.6𝑚 = 1.51
60𝑚 𝑇𝑜𝑡𝑎𝑙 𝐴𝑟𝑒𝑎 𝐶𝑜𝑣𝑒𝑟𝑒𝑑 = 43.13𝑚2
≈ 1.5𝑘𝑔. #18 𝐺. 𝐼 𝑊𝐼𝑅𝐸
𝑁𝑜. 𝑜𝑓 6" 𝐶𝐻𝐵 = 43.13𝑚2 × 12.50 = 539.13
≈ 540𝑝𝑐𝑠.
𝑺𝒖𝒎𝒎𝒂𝒓𝒚:
𝐶𝑒𝑚𝑒𝑛𝑡 = 88 𝑏𝑎𝑔𝑠 𝑹𝒆𝒂𝒓 𝑷𝒂𝒓𝒕 𝒐𝒇 𝒕𝒉𝒆 𝑾𝒂𝒍𝒍
𝑆𝑎𝑛𝑑 = 5.00𝑚3
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑊𝑎𝑙𝑙 = 11.107𝑚
𝐺𝑟𝑎𝑣𝑒𝑙 = 10.0𝑚3
𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑊𝑎𝑙𝑙 = 3.30𝑚
𝑅𝑆𝐵 = 151𝑝𝑐𝑠. .10𝑚𝑚∅ × 6𝑚
𝐴𝑟𝑒𝑎 = 11.107𝑚 × 3.30𝑚
𝑇𝑖𝑒 𝑤𝑖𝑟𝑒 = 1.50 𝑘𝑔𝑠. #18 𝐺. 𝐼. 𝑊𝑖𝑟𝑒
𝐴𝑟𝑒𝑎 = 36.65𝑚2

𝑫𝒆𝒅𝒖𝒄𝒕𝒊𝒐𝒏𝒔
𝑊𝑖𝑛𝑑𝑜𝑤 (2) = 3(0,60𝑚 × 1.00𝑚) = 1.8𝑚2
5. walls: 𝑊𝑖𝑛𝑑𝑜𝑤 (3) = 3(0.50𝑚 × 0.40𝑚) = 0.6𝑚2
𝐷𝑜𝑜𝑟2 = 3(0.80𝑚 × 2.1𝑚) = 5.04𝑚2
GROUND FLOOR 𝑇𝑜𝑡𝑎𝑙 𝐷𝑒𝑑𝑢𝑐𝑡𝑖𝑜𝑛𝑠 = 7.44𝑚2
𝑇𝑜𝑡𝑎𝑙 𝐴𝑟𝑒𝑎 𝐶𝑜𝑣𝑒𝑟𝑒𝑑 = 36.65𝑚2 − 7.44𝑚2
𝑁𝑜. 𝑜𝑓 6" 𝐶𝐻𝐵 = 29.21𝑚2 × 12.5 = 366𝑝𝑐𝑠.
Exterior Walls
𝑭𝒓𝒐𝒏𝒕 𝑷𝒂𝒓𝒕 𝒐𝒇 𝒕𝒉𝒆 𝑾𝒂𝒍𝒍 𝑹𝒆𝒂𝒓 𝑷𝒂𝒓𝒕 𝒐𝒇 𝒕𝒉𝒆 𝑾𝒂𝒍𝒍 Fence
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑊𝑎𝑙𝑙 = 14.705𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝐹𝑒𝑛𝑐𝑒 = 13.577𝑚
𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝐹𝑒𝑛𝑐𝑒 = 1.50𝑚
𝐴𝑟𝑒𝑎 = (13.577𝑚 × 1.50𝑚)
𝐴𝑟𝑒𝑎 = 20.37𝑚2 2ND FLOOR
𝑁𝑜. 𝑜𝑓 6" 𝐶𝐻𝐵 = 20.37𝑚2 × 12.5 = 255𝑝𝑐𝑠.
Exterior Walls
Interior Walls
𝑭𝒓𝒐𝒏𝒕 𝑷𝒂𝒓𝒕 𝒐𝒇 𝒕𝒉𝒆 𝑾𝒂𝒍𝒍
1st Floor 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑊𝑎𝑙𝑙 = 14.705𝑚
𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑊𝑎𝑙𝑙 = 3.6𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑊𝑎𝑙𝑙 = 29.9𝑚 𝐴𝑟𝑒𝑎 = 14.705𝑚 × 3.60𝑚
𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑊𝑎𝑙𝑙 = 3.3𝑚 𝐴𝑟𝑒𝑎 = 52.94𝑚2
𝐴𝑟𝑒𝑎 = 29.9𝑚 × 3.3𝑚
𝐴𝑟𝑒𝑎 = 98.67𝑚2 𝑫𝒆𝒅𝒖𝒄𝒕𝒊𝒐𝒏𝒔
𝑊𝑖𝑛𝑑𝑜𝑤 (1) = 3(1.20𝑚 × 1.2𝑚) = 4.32𝑚2
𝑫𝒆𝒅𝒖𝒄𝒕𝒊𝒐𝒏𝒔 𝐷𝑜𝑜𝑟1 = 3(.90𝑚 × 2.1𝑚) = 5.67𝑚2
𝐷𝑜𝑜𝑟3 = 3(0.60𝑚 × 2.1𝑚) = 3.78𝑚2 Window = 3(.46m x 1.66 m) = 2.29𝑚2
𝐷𝑜𝑜𝑟2 = 3(0.80𝑚 × 2.1𝑚) = 5.04𝑚2 𝑇𝑜𝑡𝑎𝑙 𝐷𝑒𝑑𝑢𝑐𝑡𝑖𝑜𝑛𝑠 = 12.28𝑚2
𝑇𝑜𝑡𝑎𝑙 𝐷𝑒𝑑𝑢𝑐𝑡𝑖𝑜𝑛𝑠 = 8.82𝑚2 𝑇𝑜𝑡𝑎𝑙 𝐴𝑟𝑒𝑎 𝐶𝑜𝑣𝑒𝑟𝑒𝑑 = 52.94𝑚2 − 12.28𝑚2
𝑇𝑜𝑡𝑎𝑙 𝐴𝑟𝑒𝑎 𝐶𝑜𝑣𝑒𝑟𝑒𝑑 = 98.67𝑚2 − 8.82𝑚2 = 40.66𝑚2
= 89.85𝑚2 𝑁𝑜. 𝑜𝑓 6" 𝐶𝐻𝐵 = 40.66𝑚2 × 12.50 = 508.25
𝑁𝑜. 𝑜𝑓 4" 𝐶𝐻𝐵 = 89.85𝑚2 × 13 = 1168.1 ≈ 1169𝑝𝑐𝑠 = 509𝑝𝑐𝑠.

𝑂𝑣𝑒𝑟𝑎𝑙𝑙 𝐴𝑟𝑒𝑎 = (36.25 + 34.49 + 43.13 + 29.21 𝑳𝒆𝒇𝒕 − 𝒔𝒊𝒅𝒆 𝑷𝒂𝒓𝒕 𝒐𝒇 𝒕𝒉𝒆 𝑾𝒂𝒍𝒍
+ 20.37 + 89.85) = 253.30𝑚2 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑊𝑎𝑙𝑙 = 10.45𝑚
𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑊𝑎𝑙𝑙 = 3.60𝑚
𝐶𝑒𝑚𝑒𝑛𝑡 𝐵𝑒𝑑𝑑𝑖𝑛𝑔 = 253.30 × 0.19 = 48.12 𝐴𝑟𝑒𝑎 = 10.45𝑚 × 3.60𝑚
≈ 49 𝑏𝑎𝑔𝑠
𝐴𝑟𝑒𝑎 = 37.62𝑚2
𝐶𝑒𝑚𝑒𝑛𝑡 𝐹𝑖𝑙𝑙𝑒𝑟 = 253.30 × 0.312 = 79.1 ≈ 80 𝑏𝑎𝑔𝑠
𝑇𝑜𝑡𝑎𝑙 𝐴𝑟𝑒𝑎 𝐶𝑜𝑣𝑒𝑟𝑒𝑑 = 37.62𝑚2
𝐶𝑒𝑚𝑒𝑛𝑡 𝑃𝑙𝑎𝑠𝑡𝑒𝑟𝑖𝑛𝑔 = 253.30 × 0.44 = 111.45
𝑁𝑜. 𝑜𝑓 6" 𝐶𝐻𝐵 = 37.62𝑚2 × 12.50 = 470.25
≈ 112𝑏𝑎𝑔𝑠
≈ 471𝑝𝑐𝑠.

𝑆𝑎𝑛𝑑 𝐵𝑒𝑑𝑑𝑖𝑛𝑔 = 253.30 × 0.0104 = 2.63 ≈ 3. 00𝑚3


𝑹𝒊𝒈𝒉𝒕 − 𝒔𝒊𝒅𝒆 𝑷𝒂𝒓𝒕 𝒐𝒇 𝒕𝒉𝒆 𝑾𝒂𝒍𝒍 𝒂𝒏𝒅 𝒇𝒊𝒓𝒆𝒘𝒂𝒍𝒍
𝑆𝑎𝑛𝑑 𝐹𝑖𝑙𝑙𝑒𝑟 = 253.30 × 0.019 = 4.81 ≈ 5.00𝑚3
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑊𝑎𝑙𝑙 = 13.068𝑚
𝑆𝑎𝑛𝑑 𝑃𝑙𝑎𝑠𝑡𝑒𝑟𝑖𝑛𝑔 = 253.30 × 0.025 = 6.33
𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑊𝑎𝑙𝑙 = 3.60𝑚
≈ 7.00𝑚3
𝐴𝑟𝑒𝑎 = 13.068 × 3.60𝑚
𝐴𝑟𝑒𝑎 = 47.04𝑚2
𝐺𝑟𝑎𝑣𝑒𝑙 𝐹𝑖𝑙𝑙𝑒𝑟 = 253.30 × 0.039 = 9.88 ≈ 10.00𝑚3
𝑇𝑜𝑡𝑎𝑙 𝐴𝑟𝑒𝑎 𝐶𝑜𝑣𝑒𝑟𝑒𝑑 = 47.04𝑚2
𝑁𝑜. 𝑜𝑓 6" 𝐶𝐻𝐵 = 47.04𝑚2 × 12.50 = 588𝑝𝑐𝑠.
𝑅𝑆𝐵 = 253.30 × 0.69 = 174.78 ≈ 175𝑝𝑐𝑠.

𝑹𝒆𝒂𝒓 𝑷𝒂𝒓𝒕 𝒐𝒇 𝒕𝒉𝒆 𝑾𝒂𝒍𝒍


𝑺𝒖𝒎𝒎𝒂𝒓𝒚:
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑊𝑎𝑙𝑙 = 11.107𝑚
𝐶𝑒𝑚𝑒𝑛𝑡 = (49 + 80 + 112) = 241𝑏𝑎𝑔𝑠
𝑆𝑎𝑛𝑑 = (3.00 + 5 + 7) = 15.00𝑚3 𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑊𝑎𝑙𝑙 = 3.60𝑚
𝐺𝑟𝑎𝑣𝑒𝑙 = 10.00𝑚3 𝐴𝑟𝑒𝑎 = 11.107𝑚 × 3.60𝑚
𝑅𝑆𝐵 = 175𝑝𝑐𝑠. 10𝑚𝑚∅ × 6𝑚 𝐴𝑟𝑒𝑎 = 39.99𝑚2
6"𝐶𝐻𝐵 = (454 + 432 + 540 + 366 + 255)
= 2047𝑝𝑐𝑠. 𝑫𝒆𝒅𝒖𝒄𝒕𝒊𝒐𝒏𝒔
4"𝐶𝐻𝐵 = 1169𝑝𝑐𝑠. 𝑊𝑖𝑛𝑑𝑜𝑤 (2) = 3(0,60𝑚 × 1.00𝑚) = 1.8𝑚2
𝑊𝑖𝑛𝑑𝑜𝑤 (3) = 3(0.50𝑚 × 0.40𝑚) = 0.6𝑚2
𝐷𝑜𝑜𝑟2 = 3(0.80𝑚 × 2.1𝑚) = 5.04𝑚2 𝑺𝒖𝒎𝒎𝒂𝒓𝒚:
𝑇𝑜𝑡𝑎𝑙 𝐷𝑒𝑑𝑢𝑐𝑡𝑖𝑜𝑛𝑠 = 7.44𝑚2 𝐶𝑒𝑚𝑒𝑛𝑡 = (53 + 85 + 122) = 260𝑏𝑎𝑔𝑠
𝑇𝑜𝑡𝑎𝑙 𝐴𝑟𝑒𝑎 𝐶𝑜𝑣𝑒𝑟𝑒𝑑 = 39.99𝑚2 − 7.44𝑚2 𝑆𝑎𝑛𝑑 = (3 + 6 + 7) = 16.00𝑚3
𝑁𝑜. 𝑜𝑓 6" 𝐶𝐻𝐵 = 32.55𝑚2 × 12.5 = 407𝑝𝑐𝑠. 𝐺𝑟𝑎𝑣𝑒𝑙 = 11.00𝑚3
𝑅𝑆𝐵 = 192𝑝𝑐𝑠. 10𝑚𝑚∅ × 6𝑚
𝑹𝒆𝒂𝒓 𝑷𝒂𝒓𝒕 𝒐𝒇 𝒕𝒉𝒆 𝑾𝒂𝒍𝒍 Fence 6"𝐶𝐻𝐵 = (509 + 471 + 588 + 407 + 255)
= 2230𝑝𝑐𝑠.
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝐹𝑒𝑛𝑐𝑒 = 13.577𝑚
4"𝐶𝐻𝐵 = 1285𝑝𝑐𝑠.
𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝐹𝑒𝑛𝑐𝑒 = 1.50𝑚
𝐴𝑟𝑒𝑎 = (13.577𝑚 × 1.50𝑚)
𝐴𝑟𝑒𝑎 = 20.37𝑚2
𝑁𝑜. 𝑜𝑓 6" 𝐶𝐻𝐵 = 20.37𝑚2 × 12.5 = 255𝑝𝑐𝑠. 6. beam:

Interior Walls Ground floor Beam 1


𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓𝑇𝐵1 = 13.272𝑚
2nd Floor 𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.30𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.09𝑚2
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑊𝑎𝑙𝑙 = 29.9𝑚
𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑊𝑎𝑙𝑙 = 3.6𝑚
𝐴𝑟𝑒𝑎 = 29.9𝑚 × 3.6𝑚 Volume for ground floor Beam
𝐴𝑟𝑒𝑎 = 107.64𝑚2 𝑉 =𝑙×𝐴
𝑉 = 13.272𝑚 × 0.09𝑚2
𝑫𝒆𝒅𝒖𝒄𝒕𝒊𝒐𝒏𝒔 𝑉 = 1.19𝑚3
𝐷𝑜𝑜𝑟3 = 3(0.60𝑚 × 2.1𝑚) = 3.78𝑚2
𝐷𝑜𝑜𝑟2 = 3(0.80𝑚 × 2.1𝑚) = 5.04𝑚2
𝐶𝑒𝑚𝑒𝑛𝑡 = (1.19𝑚3 × 9.00) = 10.17𝑏𝑎𝑔𝑠
𝑇𝑜𝑡𝑎𝑙 𝐷𝑒𝑑𝑢𝑐𝑡𝑖𝑜𝑛𝑠 = 8.82𝑚2
𝑆𝑎𝑛𝑑 = (1.19𝑚3 × 0.50) = 0.60𝑚3
𝑇𝑜𝑡𝑎𝑙 𝐴𝑟𝑒𝑎 𝐶𝑜𝑣𝑒𝑟𝑒𝑑 = 107.64𝑚2 − 8.82𝑚2
= 98.82𝑚2 𝐺𝑟𝑎𝑣𝑒𝑙 = (1.19𝑚3 × 1.00) = 1.19𝑚3
𝑁𝑜. 𝑜𝑓 4" 𝐶𝐻𝐵 = 98.82𝑚2 × 13 = 1284.66
≈ 1285𝑝𝑐𝑠. 𝑹𝑺𝑩
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (4 − 12𝑚𝑚∅ × 6𝑚)
𝑂𝑣𝑒𝑟𝑎𝑙𝑙 𝐴𝑟𝑒𝑎 = (40.66 + 37.62 + 47.04 + 32.55 𝐿𝑒𝑛𝑔𝑡ℎ = 13.272𝑚 ≈ 13272𝑚𝑚
+ 20.37 + 98.82) = 277.06𝑚2 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 13.272𝑚 + 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 13.572𝑚
𝐶𝑒𝑚𝑒𝑛𝑡 𝐵𝑒𝑑𝑑𝑖𝑛𝑔 = 277.06 × 0.19 = 52.64
≈ 53 𝑏𝑎𝑔𝑠
𝐶𝑒𝑚𝑒𝑛𝑡 𝐹𝑖𝑙𝑙𝑒𝑟 = 277.06 × 0.312 = 86.44 ≈ 85 𝑏𝑎𝑔𝑠 𝑈𝑠𝑖𝑛𝑔 (8 − 12𝑚𝑚∅ × 6𝑚)
𝐶𝑒𝑚𝑒𝑛𝑡 𝑃𝑙𝑎𝑠𝑡𝑒𝑟𝑖𝑛𝑔 = 277.06 × 0.44 = 121.91 4(𝑏𝑒𝑎𝑚𝑠) × 8(𝑏𝑎𝑟𝑠) = 32𝑝𝑐𝑠.
≈ 122𝑏𝑎𝑔𝑠
𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔
3
𝑆𝑎𝑛𝑑 𝐵𝑒𝑑𝑑𝑖𝑛𝑔 = 277.06 × 0.0104 = 2.88 ≈ 3. 00𝑚 𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
𝑆𝑎𝑛𝑑 𝐹𝑖𝑙𝑙𝑒𝑟 = 277.06 × 0.019 = 5.26 ≈ 6.00𝑚3 4 × 0.05 = 0.20𝑚
𝑆𝑎𝑛𝑑 𝑃𝑙𝑎𝑠𝑡𝑒𝑟𝑖𝑛𝑔 = 277.06 × 0.025 = 6.92 4 × 0.10 = 0.40𝑚
≈ 7.00𝑚3
= 0.60𝑚 ≈ 600𝑚𝑚
𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚
𝐺𝑟𝑎𝑣𝑒𝑙 𝐹𝑖𝑙𝑙𝑒𝑟 = 277.06 × 0.039 = 10.81 ≈ 11.00𝑚3
13572𝑚𝑚
− 600𝑚𝑚 = 6186𝑚𝑚
2
𝑅𝑆𝐵 = 277.06 × 0.69 = 191.17 ≈ 192𝑝𝑐𝑠. 6186𝑚𝑚
= 30.93 ≈ 31𝑝𝑐𝑠.× 1(𝑏𝑒𝑎𝑚𝑠) = 31𝑝𝑐𝑠
200𝑚𝑚
𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 31) × 1(𝑏𝑒𝑎𝑚𝑠) 𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 6) × 1(𝑏𝑒𝑎𝑚𝑠)
= 39𝑝𝑐𝑠 = 12𝑝𝑐𝑠

𝑻𝒊𝒆 𝑾𝒊𝒓𝒆 𝑻𝒊𝒆 𝑾𝒊𝒓𝒆


𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 39 × 4 = 156 𝑡𝑖𝑒𝑠 𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 12 × 4 = 480 𝑡𝑖𝑒𝑠
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 156 × 0.30𝑚 = 46.80𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 160 × 0.30𝑚 = 14.40𝑚
1𝑘𝑔 1𝑘𝑔
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 46.80𝑚 = 0.88 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 14.40𝑚 = 0.27
53𝑚 53𝑚
≈ 1 .0 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸 ≈ 0.50 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸

Ground floor Beam 2 Ground floor Beam 3


𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓𝑇𝐵1 = 3.293𝑚 𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓𝑇𝐵1 = 4.00𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.30𝑚 𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.30𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.09𝑚2 𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.09𝑚2

Volume for ground floor Beam Volume for ground floor Beam
𝑉 =𝑙×𝐴 𝑉 =𝑙×𝐴
𝑉 = 3.293𝑚 × 0.09𝑚2 𝑉 = 4𝑚 × 0.09𝑚2
3
𝑉 = 0.30𝑚 𝑉 = 0.36𝑚3

𝐶𝑒𝑚𝑒𝑛𝑡 = (0.30𝑚3 × 9.00) = 2.7𝑏𝑎𝑔𝑠 𝐶𝑒𝑚𝑒𝑛𝑡 = (0.36𝑚3 × 9.00) = 3.24𝑏𝑎𝑔𝑠


3 3
𝑆𝑎𝑛𝑑 = (0.30𝑚 × 0.50) = 0.15𝑚 𝑆𝑎𝑛𝑑 = (0.36𝑚3 × 0.50) = 0.18𝑚3
𝐺𝑟𝑎𝑣𝑒𝑙 = (0.30𝑚3 × 1.00) = 0.30𝑚3 𝐺𝑟𝑎𝑣𝑒𝑙 = (0.36𝑚3 × 1.00) = 0.36𝑚3

𝑹𝑺𝑩 𝑹𝑺𝑩
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (4 − 12𝑚𝑚∅ × 6𝑚) 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (4 − 12𝑚𝑚∅ × 6𝑚)
𝐿𝑒𝑛𝑔𝑡ℎ = 3.293𝑚 ≈ 3293𝑚𝑚 𝐿𝑒𝑛𝑔𝑡ℎ = 4𝑚 ≈ 4000𝑚𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3.293𝑚 + 0.30𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 4.0𝑚 + 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3.593𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 4.3𝑚

𝑈𝑠𝑖𝑛𝑔 (8 − 12𝑚𝑚∅ × 6𝑚) 𝑈𝑠𝑖𝑛𝑔 (8 − 12𝑚𝑚∅ × 6𝑚)


1(𝑏𝑒𝑎𝑚𝑠) × 8(𝑏𝑎𝑟𝑠) = 8𝑝𝑐𝑠. 1(𝑏𝑒𝑎𝑚𝑠) × 8(𝑏𝑎𝑟𝑠) = 8𝑝𝑐𝑠.

𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔 𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔


𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
4 × 0.05 = 0.20𝑚 4 × 0.05 = 0.20𝑚
4 × 0.10 = 0.40𝑚 4 × 0.10 = 0.40𝑚
= 0.60𝑚 ≈ 600𝑚𝑚 = 0.60𝑚 ≈ 600𝑚𝑚
𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚 𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚
3593𝑚𝑚 4300𝑚𝑚
− 600𝑚𝑚 = 1196.5𝑚𝑚 − 600𝑚𝑚 = 1550𝑚𝑚
2 2
1196.5𝑚𝑚 1550𝑚𝑚
= 5.98 ≈ 6𝑝𝑐𝑠.× 1(𝑏𝑒𝑎𝑚𝑠) = 6𝑝𝑐𝑠 = 7.75 ≈ 8𝑝𝑐𝑠.× 1(𝑏𝑒𝑎𝑚𝑠) = 8𝑝𝑐𝑠
200𝑚𝑚 200𝑚𝑚
𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 8) × 1(𝑏𝑒𝑎𝑚𝑠) 𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 8) × 1(𝑏𝑒𝑎𝑚𝑠)
= 16𝑝𝑐𝑠 = 16𝑝𝑐𝑠

𝑻𝒊𝒆 𝑾𝒊𝒓𝒆 𝑻𝒊𝒆 𝑾𝒊𝒓𝒆


𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 16 × 4 = 64 𝑡𝑖𝑒𝑠 𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 16 × 4 = 64 𝑡𝑖𝑒𝑠
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 64 × 0.30𝑚 = 19.20𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 64 × 0.30𝑚 = 19.20𝑚
1𝑘𝑔 1𝑘𝑔
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 19.20𝑚 = 0.36 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 19.20𝑚 = 0.36
53𝑚 53𝑚
≈ 0.50 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸 ≈ 0.50 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸

Ground floor Beam 4 Ground floor Beam 5


𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓𝑇𝐵1 = 3.90𝑚 𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓𝑇𝐵1 = 2.420𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.30𝑚 𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.30𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.09𝑚 2 𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.09𝑚2

Volume for ground floor Beam Volume for ground floor Beam
𝑉 =𝑙×𝐴 𝑉 =𝑙×𝐴
𝑉 = 3.9𝑚 × 0.09𝑚2 𝑉 = 2.42𝑚 × 0.09𝑚2
𝑉 = 0.35𝑚3 𝑉 = 0.22𝑚3

𝐶𝑒𝑚𝑒𝑛𝑡 = (0.35𝑚3 × 9.00) = 3.15𝑏𝑎𝑔𝑠 𝐶𝑒𝑚𝑒𝑛𝑡 = (0.22 × 9.00) = 1.98𝑏𝑎𝑔𝑠


𝑆𝑎𝑛𝑑 = (0.35𝑚3 × 0.50) = 0.175𝑚3 𝑆𝑎𝑛𝑑 = (0.22𝑚3 × 0.50) = 0.11𝑚3
𝐺𝑟𝑎𝑣𝑒𝑙 = (0.35𝑚3 × 1.00) = 0.35𝑚3 𝐺𝑟𝑎𝑣𝑒𝑙 = (0.22𝑚3 × 1.00) = 0.22𝑚3

𝑹𝑺𝑩 𝑹𝑺𝑩
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (8 − 12𝑚𝑚∅ × 6𝑚) 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (4 − 12𝑚𝑚∅ × 6𝑚)
𝐿𝑒𝑛𝑔𝑡ℎ = 3.9𝑚 ≈ 3900𝑚𝑚 𝐿𝑒𝑛𝑔𝑡ℎ = 2.42𝑚 ≈ 2420𝑚𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3.9𝑚 + 0.30𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 2.420𝑚 + 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 4.2𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 2.72𝑚

𝑈𝑠𝑖𝑛𝑔 (8 − 12𝑚𝑚∅ × 6𝑚) 𝑈𝑠𝑖𝑛𝑔 (8 − 12𝑚𝑚∅ × 6𝑚)


1(𝑏𝑒𝑎𝑚𝑠) × 8(𝑏𝑎𝑟𝑠) = 8𝑝𝑐𝑠. 1(𝑏𝑒𝑎𝑚𝑠) × 8(𝑏𝑎𝑟𝑠) = 8𝑝𝑐𝑠.

𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔 𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔


𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
4 × 0.05 = 0.20𝑚 4 × 0.05 = 0.20𝑚
4 × 0.10 = 0.40𝑚 4 × 0.10 = 0.40𝑚
= 0.60𝑚 ≈ 600𝑚𝑚 = 0.60𝑚 ≈ 600𝑚𝑚
𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚 𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚
4200𝑚𝑚 2720𝑚𝑚
− 600𝑚𝑚 = 1500𝑚𝑚 − 600𝑚𝑚 = 760𝑚𝑚
2 2
1500𝑚𝑚 760𝑚𝑚
= 7.5 ≈ 8𝑝𝑐𝑠.× 1(𝑏𝑒𝑎𝑚𝑠) = 8𝑝𝑐𝑠 = 3.8 ≈ 4𝑝𝑐𝑠.× 1(𝑏𝑒𝑎𝑚𝑠) = 4𝑝𝑐𝑠
200𝑚𝑚 200𝑚𝑚
𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 4) × 1(𝑏𝑒𝑎𝑚𝑠) 𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 34) × 1(𝑏𝑒𝑎𝑚𝑠)
= 12𝑝𝑐𝑠 = 42𝑝𝑐𝑠

𝑻𝒊𝒆 𝑾𝒊𝒓𝒆 𝑻𝒊𝒆 𝑾𝒊𝒓𝒆


𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 12 × 4 = 48 𝑡𝑖𝑒𝑠 𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 42 × 4 = 168 𝑡𝑖𝑒𝑠
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 48 × 0.30𝑚 = 14.40𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 168 × 0.30𝑚 = 50.4𝑚
1𝑘𝑔 1𝑘𝑔
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 14.40𝑚 = 0.27 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 50.40𝑚 = 0.95
53𝑚 53𝑚
≈ 0.50 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸 ≈ 01.0 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸

Ground floor Beam 7


Ground floor Beam 6 𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓𝑇𝐵1 = 7.752𝑚
𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓𝑇𝐵1 = 14.412𝑚 𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.30𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.30𝑚 𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.09𝑚2
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.09𝑚2
Volume for ground floor Beam
Volume for ground floor Beam 𝑉 =𝑙×𝐴
𝑉 =𝑙×𝐴 𝑉 = 7.752𝑚 × 0.09𝑚2
𝑉 = 14.412𝑚 × 0.09𝑚2 𝑉 = 0.70𝑚3
3
𝑉 = 1.30𝑚
𝐶𝑒𝑚𝑒𝑛𝑡 = (0.70𝑚3 × 9.00) = 6.3𝑏𝑎𝑔𝑠
𝐶𝑒𝑚𝑒𝑛𝑡 = (1.30𝑚3 × 9.00) = 11.7𝑏𝑎𝑔𝑠 𝑆𝑎𝑛𝑑 = (0.70𝑚3 × 0.50) = 0.35𝑚3
3
𝑆𝑎𝑛𝑑 = (1.30𝑚 × 0.50) = 0.65𝑚 3 𝐺𝑟𝑎𝑣𝑒𝑙 = (0.70𝑚3 × 1.00) = 0.70𝑚3
𝐺𝑟𝑎𝑣𝑒𝑙 = (1.30𝑚3 × 1.00) = 1.30𝑚3
𝑹𝑺𝑩
𝑹𝑺𝑩 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (4 − 12𝑚𝑚∅ × 6𝑚)
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (4 − 12𝑚𝑚∅ × 6𝑚) 𝐿𝑒𝑛𝑔𝑡ℎ = 7752𝑚 ≈ 7752𝑚𝑚
𝐿𝑒𝑛𝑔𝑡ℎ = 14.412𝑚 ≈ 14412𝑚𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 7.752𝑚 + 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 14.412𝑚 + 0.30𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 8.052𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 14.712𝑚
𝑈𝑠𝑖𝑛𝑔 (8 − 12𝑚𝑚∅ × 6𝑚)
𝑈𝑠𝑖𝑛𝑔 84 − 12𝑚𝑚∅ × 6𝑚) 2(𝑏𝑒𝑎𝑚𝑠) × 8(𝑏𝑎𝑟𝑠) = 16𝑝𝑐𝑠.
4(𝑏𝑒𝑎𝑚𝑠) × 8(𝑏𝑎𝑟𝑠) = 32𝑝𝑐𝑠.
𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔
𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔 𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 4 × 0.05 = 0.20𝑚
4 × 0.05 = 0.20𝑚 4 × 0.10 = 0.40𝑚
4 × 0.10 = 0.40𝑚 = 0.60𝑚 ≈ 600𝑚𝑚
= 0.60𝑚 ≈ 600𝑚𝑚 𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚
𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚 8052𝑚𝑚
− 600𝑚𝑚 = 3426𝑚𝑚
14712𝑚𝑚 2
− 600𝑚𝑚 = 6756𝑚𝑚 3426𝑚𝑚
2 = 17.13 ≈ 18𝑝𝑐𝑠.× 1(𝑏𝑒𝑎𝑚𝑠) = 18𝑝𝑐𝑠
6756𝑚𝑚 200𝑚𝑚
= 33.78 ≈ 34𝑝𝑐𝑠.× 1(𝑏𝑒𝑎𝑚𝑠) = 34𝑝𝑐𝑠
200𝑚𝑚
𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 18) × 1(𝑏𝑒𝑎𝑚𝑠) 𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 51) × 1(𝑏𝑒𝑎𝑚𝑠)
= 26𝑝𝑐𝑠 = 59𝑝𝑐𝑠

𝑻𝒊𝒆 𝑾𝒊𝒓𝒆 𝑻𝒊𝒆 𝑾𝒊𝒓𝒆


𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 26 × 4 = 104 𝑡𝑖𝑒𝑠 𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 59 × 4 = 236 𝑡𝑖𝑒𝑠
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 104 × 0.30𝑚 = 31.2𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 236 × 0.30𝑚 = 70.8𝑚
1𝑘𝑔 1𝑘𝑔
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 31.2𝑚 = 0.59 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 70.80𝑚 = 1.34
53𝑚 53𝑚
≈ 0.75 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸 ≈ 1.50 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸

Ground floor Beam 8 𝑺𝒖𝒎𝒎𝒂𝒓𝒚:


𝐶𝑒𝑚𝑒𝑛𝑡 = (10.17 + 2.7 + 3.24 + 3.15 + 1.98 + 11.7
𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓𝑇𝐵1 = 7.75𝑚
+ 6.3 + 18.85) = 58.09 ≈ 59𝑏𝑎𝑔𝑠
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.30𝑚
𝑆𝑎𝑛𝑑 = (0.6 + 0.15 + 0.18 + 0.175 + 0.11 + 0.65
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.09𝑚2 + 0.35 + 1.05) = 3.265 ≈ 3.5𝑚3
𝐺𝑟𝑎𝑣𝑒𝑙 = (1.19 + 0.3 + 0.36 + 0.35 + 0.22 + 1.30
Volume for ground floor Beam + 0.70 + 2.1) = 6.52 ≈ 6.50𝑚3
𝑅𝑆𝐵
𝑉 =𝑙×𝐴 (32 + 8 + 8 + 8 + 32 + 16 + 8 + 24)
𝑉 = 7.75𝑚 × 0.09𝑚2 = 120𝑝𝑐𝑠. 12𝑚𝑚∅ × 6𝑚
𝑉 = 0.698𝑚3 (31 + 6 + 8 + 8 + 4 + 34 + 18 + 51)2
= 380𝑝𝑐𝑠. 10𝑚𝑚∅ × 6𝑚

𝐶𝑒𝑚𝑒𝑛𝑡 = 3(0.698𝑚3 × 9.00) = 18.85𝑏𝑎𝑔𝑠


𝑇𝑖𝑒 𝑤𝑖𝑟𝑒 = (1.00 + 0.5 + 0.5 + 0.5 + 0.5 + 1.00
𝑆𝑎𝑛𝑑 = 3(0.698𝑚3 × 0.50) = 1.05𝑚3 + 0.75 + 1.50) = 6.25 𝑘𝑔
𝐺𝑟𝑎𝑣𝑒𝑙 = 3(0.698𝑚3 × 1.00) = 2.1𝑚3 1
≈ 6 𝑘𝑔. #16 𝐺. 𝐼. 𝑊𝑖𝑟𝑒
4

𝑹𝑺𝑩
2nd floor Beam-1 a
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (4 − 12𝑚𝑚∅ × 6𝑚)
𝑅𝐵1𝑎 = 1𝑝𝑐. (2.952𝑚) − 0.2𝑚
𝐿𝑒𝑛𝑔𝑡ℎ = 7.75𝑚 ≈ 7750𝑚𝑚
𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 2.752𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 7750𝑚 + 0.30𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.40𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 8750𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.12𝑚2

𝑈𝑠𝑖𝑛𝑔 (8 − 12𝑚𝑚∅ × 6𝑚)


3(𝑏𝑒𝑎𝑚𝑠) × 8(𝑏𝑎𝑟𝑠) = 24𝑝𝑐𝑠. Volume for Roof Beam
𝑉 =𝑙×𝐴
𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔 𝑉 = 2.752𝑚 × 0.12𝑚2
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 𝑉 = 0.33𝑚3
4 × 0.05 = 0.20𝑚
4 × 0.10 = 0.40𝑚 𝐶𝑒𝑚𝑒𝑛𝑡 = (0.33𝑚3 × 9.00) × 1 = 2.97 𝑏𝑎𝑔𝑠
= 0.60𝑚 ≈ 600𝑚𝑚 𝑆𝑎𝑛𝑑 = (0.33𝑚3 × 0.50) × 1 = 0.165𝑚3
𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚 𝐺𝑟𝑎𝑣𝑒𝑙 = (0.33𝑚3 × 1.00) × 1 = 0.33𝑚3
7750𝑚𝑚
− 600𝑚𝑚 = 3275𝑚𝑚
2 𝑹𝑺𝑩
3275𝑚𝑚
= 16.38 ≈ 17𝑝𝑐𝑠.× 3(𝑏𝑒𝑎𝑚𝑠) = 51𝑝𝑐𝑠 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (9 − 16𝑚𝑚∅ × 6𝑚)
200𝑚𝑚
𝐿𝑒𝑛𝑔𝑡ℎ = 2.952𝑚 ≈ 2952𝑚𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 2.952𝑚 + 0.30𝑚 𝐿𝑒𝑛𝑔𝑡ℎ = 3.154𝑚 ≈ 3154𝑚𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3.252𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3154𝑚 + 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3.454𝑚
𝑈𝑠𝑖𝑛𝑔 (9 − 16𝑚𝑚∅ × 6𝑚)
1(𝑏𝑒𝑎𝑚𝑠) × 9(𝑏𝑎𝑟𝑠) = 9𝑝𝑐𝑠. 𝑈𝑠𝑖𝑛𝑔 (9 − 16𝑚𝑚∅ × 6𝑚)
1(𝑏𝑒𝑎𝑚𝑠) × 9(𝑏𝑎𝑟𝑠) = 9𝑝𝑐𝑠.
𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔
4 × 0.05 = 0.20𝑚 𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
4 × 0.10 = 0.40𝑚 4 × 0.05 = 0.20𝑚
= 0.60𝑚 ≈ 600𝑚𝑚 4 × 0.10 = 0.40𝑚
𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚 = 0.60𝑚 ≈ 600𝑚𝑚
3252𝑚𝑚 𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚
− 600𝑚𝑚 = 1026𝑚𝑚
2 3454𝑚𝑚
1026𝑚𝑚 − 600𝑚𝑚 = 1127𝑚𝑚
= 5.13 ≈ 6𝑝𝑐𝑠.× 1(𝑏𝑒𝑎𝑚) = 6𝑝𝑐𝑠 2
200𝑚𝑚 1127𝑚𝑚
𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 6) × 1(𝑏𝑒𝑎𝑚) = 5.64 ≈ 6𝑝𝑐𝑠.× 1(𝑏𝑒𝑎𝑚) = 6𝑝𝑐𝑠
200𝑚𝑚
= 14𝑝𝑐𝑠 𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 6) × 1(𝑏𝑒𝑎𝑚)
= 14𝑝𝑐𝑠
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 14 × 4 = 56 𝑡𝑖𝑒𝑠 𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚 𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 14 × 4 = 56 𝑡𝑖𝑒𝑠
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 56 × 0.30𝑚 = 16.80𝑚 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚
1𝑘𝑔 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 56 × 0.30𝑚 = 16.80𝑚
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 16.80𝑚 = 0.32
53𝑚 1𝑘𝑔
1 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 16.80𝑚 = 0.32
≈ 0.50 𝑜𝑟 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸 53𝑚
2 1
≈ 0.50 𝑜𝑟 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸
2
2nd floor Beam-1 b
𝑅𝐵1𝑏 = 1𝑝𝑐. (3.354𝑚) − 0.2𝑚 2nd floor Beam-1 c
𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 3.154𝑚 𝑅𝐵1𝑐 = (3.857𝑚) − 0.2𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.40𝑚 𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 3.657𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.12𝑚2 𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.40𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.12𝑚2
Volume for Roof Beam
𝑉 =𝑙×𝐴 Volume for Roof Beam
2
𝑉 = 3.154𝑚 × 0.12𝑚 𝑉 =𝑙×𝐴
3
𝑉 = 0.38𝑚 𝑉 = 3.657𝑚 × 0.12𝑚2
𝑉 = 0.44𝑚3
𝐶𝑒𝑚𝑒𝑛𝑡 = (0.38𝑚3 × 9.00) × 1 = 3.42 𝑏𝑎𝑔𝑠
𝑆𝑎𝑛𝑑 = (0.38𝑚3 × 0.50) × 1 = 0.19𝑚3 𝐶𝑒𝑚𝑒𝑛𝑡 = (0.44𝑚3 × 9.00) × 1 = 3.96 𝑏𝑎𝑔𝑠
𝐺𝑟𝑎𝑣𝑒𝑙 = (0.38𝑚3 × 1.00) × 1 = 0.38𝑚3 𝑆𝑎𝑛𝑑 = (0.44𝑚3 × 0.50) × 1 = 0.22𝑚3
𝐺𝑟𝑎𝑣𝑒𝑙 = (0.44𝑚3 × 1.00) × 1 = 0.44𝑚3
𝑹𝑺𝑩
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (9 − 16𝑚𝑚∅ × 6𝑚)
𝑹𝑺𝑩 𝐺𝑟𝑎𝑣𝑒𝑙 = 3(0.456𝑚3 × 1.00) = 1.37𝑚3
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (9 − 16𝑚𝑚∅ × 6𝑚)
𝐿𝑒𝑛𝑔𝑡ℎ = 3.657𝑚 ≈ 3657𝑚𝑚 𝑹𝑺𝑩
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3.657𝑚 + 0.30𝑚 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (9 − 16𝑚𝑚∅ × 6𝑚)
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3.957𝑚 𝐿𝑒𝑛𝑔𝑡ℎ = 3.80𝑚 ≈ 3800𝑚𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3.80𝑚 + 0.30𝑚
𝑈𝑠𝑖𝑛𝑔 (9 − 16𝑚𝑚∅ × 6𝑚) 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 4.1𝑚
1(𝑏𝑒𝑎𝑚𝑠) × 9(𝑏𝑎𝑟𝑠) = 9𝑝𝑐𝑠.
𝑈𝑠𝑖𝑛𝑔 (9 − 16𝑚𝑚∅ × 6𝑚)
𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔 3(𝑏𝑒𝑎𝑚𝑠) × 9(𝑏𝑎𝑟𝑠) = 27𝑝𝑐𝑠.
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
4 × 0.05 = 0.20𝑚 𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔
4 × 0.10 = 0.40𝑚 𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
= 0.60𝑚 ≈ 600𝑚𝑚 4 × 0.05 = 0.20𝑚
𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚 4 × 0.10 = 0.40𝑚
3957𝑚𝑚 = 0.60𝑚 ≈ 600𝑚𝑚
− 600𝑚𝑚 = 1378.5𝑚𝑚
2 𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚
1378.5𝑚𝑚
= 6.89 ≈ 7𝑝𝑐𝑠.× 1(𝑏𝑒𝑎𝑚) = 7𝑝𝑐𝑠 4100𝑚𝑚
200𝑚𝑚 − 600𝑚𝑚 = 1450𝑚𝑚
2
𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 7) × 1(𝑏𝑒𝑎𝑚) 1450𝑚𝑚
= 15𝑝𝑐𝑠 = 7.25 ≈ 8𝑝𝑐𝑠 = 8𝑝𝑐𝑠
200𝑚𝑚
𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 8) × 3(𝑏𝑒𝑎𝑚)
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆 = 48𝑝𝑐𝑠
𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 15 × 4 = 60 𝑡𝑖𝑒𝑠
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚 𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 60 × 0.30𝑚 = 18.0𝑚 𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 48 × 4 = 192 𝑡𝑖𝑒𝑠
1𝑘𝑔 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 18.0𝑚 = 0.34
53𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 192 × 0.30𝑚 = 57.60𝑚
1
≈ 0.50 𝑜𝑟 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸 1𝑘𝑔
2 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 57.60𝑚 = 1.09
53𝑚
1
≈ 1.25 𝑜𝑟1 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸
4
2nd floor Beam-1 d
𝑅𝐵1𝑑 = (4𝑚) − 0.2𝑚 2nd floor Beam-1 e
𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 3.80𝑚 𝑅𝐵1𝑒 = (3.9𝑚) − 0.2𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.40𝑚 𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 3.70𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.12𝑚2 𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.40𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.12𝑚2
Volume for Roof Beam
𝑉 =𝑙×𝐴 Volume for Roof Beam
𝑉 = 3.80𝑚 × 0.12𝑚2 𝑉 =𝑙×𝐴
𝑉 = 0.456𝑚3 𝑉 = 3.70𝑚 × 0.12𝑚2
𝑉 = 0.444𝑚3
𝐶𝑒𝑚𝑒𝑛𝑡 = 3(0.456𝑚3 × 9.00) = 12.32 𝑏𝑎𝑔𝑠
𝑆𝑎𝑛𝑑 = 3(0.456𝑚3 × 0.50) = 0.68𝑚3 𝐶𝑒𝑚𝑒𝑛𝑡 = 3(0.444𝑚3 × 9.00) = 11.99𝑏𝑎𝑔𝑠
𝑆𝑎𝑛𝑑 = 3(0.444𝑚3 × 0.50) = 0.67𝑚3 𝐶𝑒𝑚𝑒𝑛𝑡 = (0.266𝑚3 × 9.00) = 2.39𝑏𝑎𝑔𝑠
3 3
𝐺𝑟𝑎𝑣𝑒𝑙 = 3(0.444𝑚 × 1.00) = 1.33𝑚 𝑆𝑎𝑛𝑑 = (0.266𝑚3 × 0.50) =. 133𝑚3
𝐺𝑟𝑎𝑣𝑒𝑙 = (0.266𝑚3 × 1.00) = 0.266𝑚3
𝑹𝑺𝑩
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (9 − 16𝑚𝑚∅ × 6𝑚) 𝑹𝑺𝑩
𝐿𝑒𝑛𝑔𝑡ℎ = 3.70𝑚 ≈ 3700𝑚𝑚 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (9 − 16𝑚𝑚∅ × 6𝑚)
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3.70𝑚 + 0.30𝑚 𝐿𝑒𝑛𝑔𝑡ℎ = 2.220𝑚 ≈ 2220𝑚𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 4.0𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 2.22𝑚 + 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 2.52𝑚
𝑈𝑠𝑖𝑛𝑔 (9 − 16𝑚𝑚∅ × 6𝑚)
3(𝑏𝑒𝑎𝑚𝑠) × 9(𝑏𝑎𝑟𝑠) = 27𝑝𝑐𝑠. 𝑈𝑠𝑖𝑛𝑔 (9 − 16𝑚𝑚∅ × 6𝑚)
1(𝑏𝑒𝑎𝑚𝑠) × 9(𝑏𝑎𝑟𝑠) = 9𝑝𝑐𝑠.
𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔
4 × 0.05 = 0.20𝑚 𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
4 × 0.10 = 0.40𝑚 4 × 0.05 = 0.20𝑚
= 0.60𝑚 ≈ 600𝑚𝑚 4 × 0.10 = 0.40𝑚
𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚 = 0.60𝑚 ≈ 600𝑚𝑚
4000𝑚𝑚 𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚
− 600𝑚𝑚 = 1400𝑚𝑚
2 2520𝑚𝑚
1400𝑚𝑚 − 600𝑚𝑚 = 660𝑚𝑚
= 7 ≈ 7𝑝𝑐𝑠. 2
200𝑚𝑚 660𝑚𝑚
𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 7) × 3(𝑏𝑒𝑎𝑚) = 3.3 ≈ 4𝑝𝑐𝑠.
200𝑚𝑚
= 45𝑝𝑐𝑠 𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 4) × 1(𝑏𝑒𝑎𝑚)
= 12𝑝𝑐𝑠
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 45 × 4 = 180 𝑡𝑖𝑒𝑠 𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚 𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 12 × 4 = 48 𝑡𝑖𝑒𝑠
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 180 × 0.30𝑚 = 54𝑚 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚
1𝑘𝑔 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 48.0 × 0.30𝑚 = 14.4𝑚
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 54𝑚 = 1.02
53𝑚 1𝑘𝑔
1 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 14.4𝑚 = 0.27
≈ 1.25 𝑜𝑟1 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸 53𝑚
4 1
≈ 0.50 𝑜𝑟 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸
2
2nd floor Beam-1 f
𝑅𝐵1𝑓 = (2.42𝑚) − 0.2𝑚 2nd floor Beam-1 g
𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 2.22𝑚 𝑅𝐵1𝑔 = (2.507𝑚) − 0.2𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.40𝑚 𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 2.307𝑚
2
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.12𝑚 𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.40𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.12𝑚2
Volume for Roof Beam
𝑉 =𝑙×𝐴 Volume for Roof Beam
2
𝑉 = 2.220𝑚 × 0.12𝑚 𝑉 =𝑙×𝐴
3
𝑉 = 0.266𝑚 𝑉 = 2.307𝑚 × 0.12𝑚2
𝑉 = 0.277𝑚3
𝑉 = 0.295𝑚3
𝐶𝑒𝑚𝑒𝑛𝑡 = (0.277𝑚3 × 9.00) = 2.49𝑏𝑎𝑔𝑠
𝑆𝑎𝑛𝑑 = (0.277𝑚3 × 0.50) =. 139𝑚3 𝐶𝑒𝑚𝑒𝑛𝑡 = (0.295𝑚3 × 9.00) = 2.66𝑏𝑎𝑔𝑠
𝐺𝑟𝑎𝑣𝑒𝑙 = (0.277𝑚3 × 1.00) = 0.277𝑚3 𝑆𝑎𝑛𝑑 = (0.295𝑚3 × 0.50) =. 148𝑚3
𝐺𝑟𝑎𝑣𝑒𝑙 = (0.295𝑚3 × 1.00) = 0.295𝑚3
𝑹𝑺𝑩
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (9 − 16𝑚𝑚∅ × 6𝑚) 𝑹𝑺𝑩
𝐿𝑒𝑛𝑔𝑡ℎ = 2.307𝑚 ≈ 2307𝑚𝑚 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (9 − 16𝑚𝑚∅ × 6𝑚)
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 2.307𝑚 + 0.30𝑚 𝐿𝑒𝑛𝑔𝑡ℎ = 2.455𝑚 ≈ 2455𝑚𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 2.607𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 2.455𝑚 + 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 2.755𝑚
𝑈𝑠𝑖𝑛𝑔 (9 − 16𝑚𝑚∅ × 6𝑚)
1(𝑏𝑒𝑎𝑚𝑠) × 9(𝑏𝑎𝑟𝑠) = 9𝑝𝑐𝑠. 𝑈𝑠𝑖𝑛𝑔 (9 − 16𝑚𝑚∅ × 6𝑚)
1(𝑏𝑒𝑎𝑚𝑠) × 9(𝑏𝑎𝑟𝑠) = 9𝑝𝑐𝑠.
𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔
4 × 0.05 = 0.20𝑚 𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
4 × 0.10 = 0.40𝑚 4 × 0.05 = 0.20𝑚
= 0.60𝑚 ≈ 600𝑚𝑚 4 × 0.10 = 0.40𝑚
𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚 = 0.60𝑚 ≈ 600𝑚𝑚
2607𝑚𝑚 𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚
− 600𝑚𝑚 = 703.5𝑚𝑚
2 2755𝑚𝑚
703.5𝑚𝑚 − 600𝑚𝑚 = 777.5𝑚𝑚
= 3.52 ≈ 4𝑝𝑐𝑠. 2
200𝑚𝑚 777.5𝑚𝑚
𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 4) × 1(𝑏𝑒𝑎𝑚) = 3.89 ≈ 4𝑝𝑐𝑠.
200𝑚𝑚
= 12𝑝𝑐𝑠 𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 4) × 1(𝑏𝑒𝑎𝑚)
= 12𝑝𝑐𝑠
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 12 × 4 = 48 𝑡𝑖𝑒𝑠 𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚 𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 12 × 4 = 48 𝑡𝑖𝑒𝑠
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 48.0 × 0.30𝑚 = 14.4𝑚 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚
1𝑘𝑔 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 48.0 × 0.30𝑚 = 14.4𝑚
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 14.4𝑚 = 0.27
53𝑚 1𝑘𝑔
1 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 14.4𝑚 = 0.27
≈ 0.50 𝑜𝑟 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸 53𝑚
2 1
≈ 0.50 𝑜𝑟 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸
2
2nd floor Beam-1 h
𝑅𝐵1ℎ = (2.655𝑚) − 0.2𝑚
2nd floor Beam-1 i
𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 2.455𝑚 𝑅𝐵1𝑖 = (1.850𝑚) − 0.2𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.40𝑚 𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 1.650𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.12𝑚 2 𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.40𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.12𝑚2

Volume for Roof Beam


𝑉 =𝑙×𝐴
Volume for Roof Beam
𝑉 = 2.455𝑚 × 0.12𝑚2 𝑉 =𝑙×𝐴
𝑉 = 1.650𝑚 × 0.12𝑚2 𝑉 = 2.350𝑚 × 0.12𝑚2
3
𝑉 = 0.198𝑚 𝑉 = 0.282𝑚3

𝐶𝑒𝑚𝑒𝑛𝑡 = 4(0.198𝑚3 × 9.00) = 7.128𝑏𝑎𝑔𝑠 𝐶𝑒𝑚𝑒𝑛𝑡 = 4(0.282𝑚3 × 9.00) = 10.152𝑏𝑎𝑔𝑠


𝑆𝑎𝑛𝑑 = 4(0.198𝑚3 × 0.50) = 0.396𝑚3 𝑆𝑎𝑛𝑑 = 4(0.282𝑚3 × 0.50) = 0.564𝑚3
3 3
𝐺𝑟𝑎𝑣𝑒𝑙 = 4(0.198𝑚 × 1.00) = 0.792𝑚 𝐺𝑟𝑎𝑣𝑒𝑙 = 4(0.282𝑚3 × 1.00) = 1.128𝑚3

𝑹𝑺𝑩 𝑹𝑺𝑩
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (9 − 16𝑚𝑚∅ × 6𝑚) 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (9 − 16𝑚𝑚∅ × 6𝑚)
𝐿𝑒𝑛𝑔𝑡ℎ = 1.65𝑚 ≈ 1.65𝑚𝑚 𝐿𝑒𝑛𝑔𝑡ℎ = 2.35𝑚 ≈ 2.35𝑚𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 1.65𝑚 + 0.30𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 2.35𝑚 + 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 1.95𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 2.65𝑚

𝑈𝑠𝑖𝑛𝑔 (9 − 16𝑚𝑚∅ × 6𝑚) 𝑈𝑠𝑖𝑛𝑔 (9 − 16𝑚𝑚∅ × 6𝑚)


4(𝑏𝑒𝑎𝑚𝑠) × 9(𝑏𝑎𝑟𝑠) = 36𝑝𝑐𝑠. 4(𝑏𝑒𝑎𝑚𝑠) × 9(𝑏𝑎𝑟𝑠) = 36𝑝𝑐𝑠.

𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔 𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔


𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
4 × 0.05 = 0.20𝑚 4 × 0.05 = 0.20𝑚
4 × 0.10 = 0.40𝑚 4 × 0.10 = 0.40𝑚
= 0.60𝑚 ≈ 600𝑚𝑚 = 0.60𝑚 ≈ 600𝑚𝑚
𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚 𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚
1950𝑚𝑚 2650𝑚𝑚
− 600𝑚𝑚 = 375𝑚𝑚 − 600𝑚𝑚 = 725𝑚𝑚
2 2
375𝑚𝑚 725𝑚𝑚
= 1.875 ≈ 2𝑝𝑐𝑠. = 3.625 ≈ 4𝑝𝑐𝑠.
200𝑚𝑚 200𝑚𝑚
𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 2) × 4(𝑏𝑒𝑎𝑚) 𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 4) × 4(𝑏𝑒𝑎𝑚)
= 40𝑝𝑐𝑠 = 48𝑝𝑐𝑠

𝑻𝒊𝒆 𝑾𝒊𝒓𝒆 𝑻𝒊𝒆 𝑾𝒊𝒓𝒆


𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 40 × 4 = 160 𝑡𝑖𝑒𝑠 𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 48 × 4 = 192 𝑡𝑖𝑒𝑠
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 160 × 0.30𝑚 = 48𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 192 × 0.30𝑚 = 57.60𝑚
1𝑘𝑔 1𝑘𝑔
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 48𝑚 = 0.91 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 57.6𝑚 = 1.
53𝑚 53𝑚
≈ 1.00 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸 ≈ 1.00 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸

2nd floor Beam-1 j 2nd floor Beam-1 k


𝑅𝐵1𝑗 = (2.55𝑚) − 0.2𝑚 𝑅𝐵1𝑘 = (4.4𝑚) − 0.2𝑚
𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 2.350𝑚 𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 4.2𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.40𝑚 𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.40𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.12𝑚 2 𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.12𝑚2

Volume for Roof Beam Volume for Roof Beam


𝑉 =𝑙×𝐴 𝑉 =𝑙×𝐴
𝑉 = 4.2𝑚 × 0.12𝑚2 𝑉 =𝑙×𝐴
𝑉 = 0.504𝑚3 𝑉 = 3.151𝑚 × 0.12𝑚2
𝑉 = 0.378𝑚3
𝐶𝑒𝑚𝑒𝑛𝑡 = (0.504𝑚3 × 9.00) = 4.54𝑏𝑎𝑔𝑠
𝑆𝑎𝑛𝑑 = (0.504𝑚3 × 0.50) =. 252𝑚3 𝐶𝑒𝑚𝑒𝑛𝑡 = (0.378𝑚3 × 9.00) = 3.40𝑏𝑎𝑔𝑠
3 3
𝐺𝑟𝑎𝑣𝑒𝑙 = (0.504𝑚 × 1.00) = 0.504𝑚 𝑆𝑎𝑛𝑑 = (0.378𝑚3 × 0.50) = 0.189𝑚3
𝐺𝑟𝑎𝑣𝑒𝑙 = (0.378𝑚3 × 1.00) = 0.378𝑚3
𝑹𝑺𝑩
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (9 − 16𝑚𝑚∅ × 6𝑚) 𝑹𝑺𝑩
𝐿𝑒𝑛𝑔𝑡ℎ = 4.2𝑚 ≈ 4200𝑚𝑚 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (9 − 16𝑚𝑚∅ × 6𝑚)
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 4.200𝑚 + 0.30𝑚 𝐿𝑒𝑛𝑔𝑡ℎ = 3.151𝑚 ≈ 3151𝑚𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 4.5𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3.151𝑚 + 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3.451𝑚
𝑈𝑠𝑖𝑛𝑔 (9 − 16𝑚𝑚∅ × 6𝑚)
1(𝑏𝑒𝑎𝑚𝑠) × 9(𝑏𝑎𝑟𝑠) = 9𝑝𝑐𝑠. 𝑈𝑠𝑖𝑛𝑔 (9 − 16𝑚𝑚∅ × 6𝑚)
1(𝑏𝑒𝑎𝑚𝑠) × 9(𝑏𝑎𝑟𝑠) = 9𝑝𝑐𝑠.
𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔
4 × 0.05 = 0.20𝑚 𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
4 × 0.10 = 0.40𝑚 4 × 0.05 = 0.20𝑚
= 0.60𝑚 ≈ 600𝑚𝑚 4 × 0.10 = 0.40𝑚
𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚 = 0.60𝑚 ≈ 600𝑚𝑚
4500𝑚𝑚 𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚
− 600𝑚𝑚 = 1650𝑚𝑚
2 3451𝑚𝑚
1650𝑚𝑚 − 600𝑚𝑚 = 1125.5𝑚𝑚
= 8.25 ≈ 9𝑝𝑐𝑠. 2
200𝑚𝑚 1125.5𝑚𝑚
𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 9) × 1(𝑏𝑒𝑎𝑚) = 5.63 ≈ 6𝑝𝑐𝑠.
200𝑚𝑚
= 17𝑝𝑐𝑠 𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 6) × 1(𝑏𝑒𝑎𝑚)
= 14𝑝𝑐𝑠
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 17 × 4 = 68 𝑡𝑖𝑒𝑠 𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚 𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 14 × 4 = 56 𝑡𝑖𝑒𝑠
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 68.0 × 0.30𝑚 = 20.4𝑚 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚
1𝑘𝑔 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 56 × 0.30𝑚 = 16.8𝑚
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 20.4𝑚 = 0.38
53𝑚 1𝑘𝑔
1 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 16.8𝑚 = 0.32
≈ 0.50 𝑜𝑟 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸 53𝑚
2 1
≈ 0.50 𝑜𝑟 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸
2
2nd floor Beam-1 l
𝑅𝐵1𝑙 = (3.351𝑚) − 0.2𝑚 2nd floor Beam-1 m
𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 3.151𝑚 𝑅𝐵1𝑚 = (3.35𝑚) − 0.2𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.40𝑚 𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 3.15𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.12𝑚 2 𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.40𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.12𝑚2
Volume for Roof Beam
Volume for Roof Beam Volume for Roof Beam
𝑉 =𝑙×𝐴 𝑉 =𝑙×𝐴
2
𝑉 = 3.15𝑚 × 0.12𝑚 𝑉 = 1.3𝑚 × 0.12𝑚2
𝑉 = 0.378𝑚3 𝑉 = 0.156𝑚3

𝐶𝑒𝑚𝑒𝑛𝑡 = 4(0.378𝑚3 × 9.00) = 13.61𝑏𝑎𝑔𝑠 𝐶𝑒𝑚𝑒𝑛𝑡 = 5(0.156𝑚3 × 9.00) = 7.02𝑏𝑎𝑔𝑠


𝑆𝑎𝑛𝑑 = 4(0.378𝑚3 × 0.50) =. 756𝑚3 𝑆𝑎𝑛𝑑 = 5(0.156𝑚3 × 0.50) =. 39𝑚3
𝐺𝑟𝑎𝑣𝑒𝑙 = 4(0.378𝑚3 × 1.00) = 1.512𝑚3 𝐺𝑟𝑎𝑣𝑒𝑙 = 5(0.156𝑚3 × 1.00) = 0.78𝑚3

𝑹𝑺𝑩 𝑹𝑺𝑩
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (9 − 16𝑚𝑚∅ × 6𝑚) 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (9 − 16𝑚𝑚∅ × 6𝑚)
𝐿𝑒𝑛𝑔𝑡ℎ = 3.15𝑚 ≈ 3150𝑚𝑚 𝐿𝑒𝑛𝑔𝑡ℎ = 1.3𝑚 ≈ 1300𝑚𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3.15𝑚 + 0.30𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 1.3𝑚 + 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3.45𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 1.6𝑚

𝑈𝑠𝑖𝑛𝑔 (9 − 16𝑚𝑚∅ × 6𝑚) 𝑈𝑠𝑖𝑛𝑔 (9 − 16𝑚𝑚∅ × 6𝑚)


4(𝑏𝑒𝑎𝑚𝑠) × 9(𝑏𝑎𝑟𝑠) = 36𝑝𝑐𝑠. 5(𝑏𝑒𝑎𝑚𝑠) × 9(𝑏𝑎𝑟𝑠) = 45𝑝𝑐𝑠.

𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔 𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔


𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
4 × 0.05 = 0.20𝑚 4 × 0.05 = 0.20𝑚
4 × 0.10 = 0.40𝑚 4 × 0.10 = 0.40𝑚
= 0.60𝑚 ≈ 600𝑚𝑚 = 0.60𝑚 ≈ 600𝑚𝑚
𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚 𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚
3450𝑚𝑚 1600𝑚𝑚
− 600𝑚𝑚 = 1125𝑚𝑚 − 600𝑚𝑚 = 200𝑚𝑚
2 2
1125𝑚𝑚 200𝑚𝑚
= 5.63 ≈ 6𝑝𝑐𝑠. = 1 ≈ 1𝑝𝑐𝑠.
200𝑚𝑚 200𝑚𝑚
𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 6) × 4(𝑏𝑒𝑎𝑚) 𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 1) × 5(𝑏𝑒𝑎𝑚)
= 56𝑝𝑐𝑠 = 45𝑝𝑐𝑠

𝑻𝒊𝒆 𝑾𝒊𝒓𝒆 𝑻𝒊𝒆 𝑾𝒊𝒓𝒆


𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 56 × 4 = 224 𝑡𝑖𝑒𝑠 𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 45 × 4 = 180 𝑡𝑖𝑒𝑠
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 224 × 0.30𝑚 = 67.2𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 180 × 0.30𝑚 = 54𝑚
1𝑘𝑔 1𝑘𝑔
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 67.2𝑚 = 1.27 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 54𝑚 = 1.01
53𝑚 53𝑚
1 1
≈ 1.50 𝑜𝑟1 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸 ≈ 1.25 𝑜𝑟1 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸
2 4

2nd floor Beam-1 n


𝑅𝐵1𝑚 = (1.5𝑚) − 0.2𝑚 2nd floor Beam-2 a
𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 1.3𝑚 𝑅𝐵2𝑎 = (3.12𝑚) − 0.2𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.40𝑚 𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 2.92𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.12𝑚2 𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.35𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.105𝑚2
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.105𝑚2
Volume for Roof Beam
𝑉 =𝑙×𝐴 Volume for Roof Beam
2
𝑉 = 2.92𝑚 × 0.105𝑚 𝑉 =𝑙×𝐴
𝑉 = 0.307𝑚3 𝑉 = 3.745𝑚 × 0.105𝑚2
𝑉 = 0.393𝑚3
𝐶𝑒𝑚𝑒𝑛𝑡 = (0.307𝑚3 × 9.00) = 2.76𝑏𝑎𝑔𝑠
𝑆𝑎𝑛𝑑 = (0.307𝑚3 × 0.50) =. 15𝑚3 𝐶𝑒𝑚𝑒𝑛𝑡 = (0.393𝑚3 × 9.00) = 3.537𝑏𝑎𝑔𝑠
3 3
𝐺𝑟𝑎𝑣𝑒𝑙 = (0.307𝑚 × 1.00) = 0.307𝑚 𝑆𝑎𝑛𝑑 = (0.393𝑚3 × 0.50) = 0.197𝑚3
𝐺𝑟𝑎𝑣𝑒𝑙 = (0.393𝑚3 × 1.00) = 0.393𝑚3
𝑹𝑺𝑩
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (8 − 16𝑚𝑚∅ × 6𝑚) 𝑹𝑺𝑩
𝐿𝑒𝑛𝑔𝑡ℎ = 2.92𝑚 ≈ 2920𝑚𝑚 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (8 − 16𝑚𝑚∅ × 6𝑚)
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 2.92𝑚 + 0.30𝑚 𝐿𝑒𝑛𝑔𝑡ℎ = 3.745𝑚 ≈ 37450𝑚𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3.22𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3.745𝑚 + 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 4.045𝑚
𝑈𝑠𝑖𝑛𝑔 (8 − 16𝑚𝑚∅ × 6𝑚)
1(𝑏𝑒𝑎𝑚𝑠) × 8(𝑏𝑎𝑟𝑠) = 8𝑝𝑐𝑠. 𝑈𝑠𝑖𝑛𝑔 (8 − 16𝑚𝑚∅ × 6𝑚)
1(𝑏𝑒𝑎𝑚𝑠) × 8(𝑏𝑎𝑟𝑠) = 8𝑝𝑐𝑠.
𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔
4 × 0.05 = 0.20𝑚 𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
4 × 0.10 = 0.40𝑚 4 × 0.05 = 0.20𝑚
= 0.60𝑚 ≈ 600𝑚𝑚 4 × 0.10 = 0.40𝑚
𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚 = 0.60𝑚 ≈ 600𝑚𝑚
3220𝑚𝑚 𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚
− 600𝑚𝑚 = 1010𝑚𝑚
2 4045𝑚𝑚
1010𝑚𝑚 − 600𝑚𝑚 = 1422.5𝑚𝑚
= 5.05 ≈ 6𝑝𝑐𝑠. 2
200𝑚𝑚 1422.5𝑚𝑚
𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 6) × 1(𝑏𝑒𝑎𝑚) = 7.11 ≈ 8𝑝𝑐𝑠.
200𝑚𝑚
= 14𝑝𝑐𝑠 𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 8) × 1(𝑏𝑒𝑎𝑚)
= 16𝑝𝑐𝑠
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 14 × 4 = 56 𝑡𝑖𝑒𝑠 𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚 𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 16 × 4 = 64 𝑡𝑖𝑒𝑠
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 56 × 0.30𝑚 = 16.8𝑚 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚
1𝑘𝑔 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 64 × 0.30𝑚 = 19.2𝑚
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 16.8𝑚 = 0.32
53𝑚 1𝑘𝑔
1 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 19.2𝑚 = 0.36
≈ 0.50 𝑜𝑟 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸 53𝑚
2 1
≈ 0.50 𝑜𝑟 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸
2

2nd floor Beam-2 b


2nd floor Beam-2 c
𝑅𝐵2𝑏 = (3.945𝑚) − 0.2𝑚
𝑅𝐵2𝑐 = (4𝑚) − 0.2𝑚
𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 3.745𝑚
𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 3.8𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.35𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.35𝑚 𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 3.7𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.105𝑚2 𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.35𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.105𝑚2
Volume for Roof Beam
𝑉 =𝑙×𝐴 Volume for Roof Beam
2
𝑉 = 3.8𝑚 × 0.105𝑚 𝑉 =𝑙×𝐴
3
𝑉 = 0.399𝑚 𝑉 = 3.7𝑚 × 0.105𝑚2
𝑉 = 0.389𝑚3
𝐶𝑒𝑚𝑒𝑛𝑡 = 2(0.399𝑚3 × 9.00) = 7.182𝑏𝑎𝑔𝑠
𝑆𝑎𝑛𝑑 = 2(0.399𝑚3 × 0.50) = 0.399𝑚3 𝐶𝑒𝑚𝑒𝑛𝑡 = 2(0.389𝑚3 × 9.00) = 7𝑏𝑎𝑔𝑠
𝐺𝑟𝑎𝑣𝑒𝑙 = 2(0.399𝑚3 × 1.00) = 0.798𝑚3 𝑆𝑎𝑛𝑑 = 2(0.389𝑚3 × 0.50) = 0.389𝑚3
𝐺𝑟𝑎𝑣𝑒𝑙 = 2(0.389𝑚3 × 1.00) = 0.778𝑚3
𝑹𝑺𝑩
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (8 − 16𝑚𝑚∅ × 6𝑚) 𝑹𝑺𝑩
𝐿𝑒𝑛𝑔𝑡ℎ = 3.8𝑚 ≈ 3800𝑚𝑚 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (8 − 16𝑚𝑚∅ × 6𝑚)
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3.8𝑚 + 0.30𝑚 𝐿𝑒𝑛𝑔𝑡ℎ = 3.7𝑚 ≈ 3700𝑚𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 4.1𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3.7𝑚 + 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 4.0𝑚
𝑈𝑠𝑖𝑛𝑔 (8 − 16𝑚𝑚∅ × 6𝑚)
2(𝑏𝑒𝑎𝑚𝑠) × 8(𝑏𝑎𝑟𝑠) = 16𝑝𝑐𝑠. 𝑈𝑠𝑖𝑛𝑔 (8 − 16𝑚𝑚∅ × 6𝑚)
2(𝑏𝑒𝑎𝑚𝑠) × 8(𝑏𝑎𝑟𝑠) = 16𝑝𝑐𝑠.
𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔
4 × 0.05 = 0.20𝑚 𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
4 × 0.10 = 0.40𝑚 4 × 0.05 = 0.20𝑚
= 0.60𝑚 ≈ 600𝑚𝑚 4 × 0.10 = 0.40𝑚
𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚 = 0.60𝑚 ≈ 600𝑚𝑚
4100𝑚𝑚 𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚
− 600𝑚𝑚 = 1450𝑚𝑚
2 4000𝑚𝑚
1450𝑚𝑚 − 600𝑚𝑚 = 1400𝑚𝑚
= 7.25 ≈ 8𝑝𝑐𝑠. 2
200𝑚𝑚 1400𝑚𝑚
𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 8) × 2(𝑏𝑒𝑎𝑚) = 7 ≈ 7𝑝𝑐𝑠.
200𝑚𝑚
= 32𝑝𝑐𝑠 𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 7) × 2(𝑏𝑒𝑎𝑚)
= 30𝑝𝑐𝑠
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 32 × 4 = 128 𝑡𝑖𝑒𝑠 𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚 𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 30 × 4 = 120 𝑡𝑖𝑒𝑠
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 128 × 0.30𝑚 = 38.4𝑚 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚
1𝑘𝑔 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 120 × 0.30𝑚 = 36𝑚
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 38.4𝑚 = 0.72
53𝑚 1𝑘𝑔
3 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 36𝑚 = 068
≈ 0.75 𝑜𝑟 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸 53𝑚
4 3
≈ 0.75 𝑜𝑟 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸
4
2nd floor Beam-2 d
𝑅𝐵2𝑑 = (3.9𝑚) − 0.2𝑚
2nd floor Beam-2 e 2nd floor Beam-2 f
𝑅𝐵2𝑒 = (2.655𝑚) − 0.2𝑚 𝑅𝐵2𝑓 = (0.95𝑚) − 0.2𝑚
𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 2.455𝑚 𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 0.75𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.35𝑚 𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.35𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.105𝑚2 𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.105𝑚2

Volume for Roof Beam Volume for Roof Beam


𝑉 =𝑙×𝐴 𝑉 =𝑙×𝐴
𝑉 = 2.455𝑚 × 0.105𝑚2 𝑉 = 0.75𝑚 × 0.105𝑚2
𝑉 = 0.258𝑚3 𝑉 = 0.079𝑚3

𝐶𝑒𝑚𝑒𝑛𝑡 = (0.258𝑚3 × 9.00) = 2.32𝑏𝑎𝑔𝑠 𝐶𝑒𝑚𝑒𝑛𝑡 = (0.079𝑚3 × 9.00) = 0.711𝑎𝑔𝑠


𝑆𝑎𝑛𝑑 = (0.258𝑚3 × 0.50) = 0.129𝑚3 𝑆𝑎𝑛𝑑 = (0.079𝑚3 × 0.50) = 0.040𝑚3
3 3
𝐺𝑟𝑎𝑣𝑒𝑙 = (0.258𝑚 × 1.00) = 0.258𝑚 𝐺𝑟𝑎𝑣𝑒𝑙 = (0.079𝑚3 × 1.00) = 0.079𝑚3

𝑹𝑺𝑩 𝑹𝑺𝑩
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (8 − 16𝑚𝑚∅ × 6𝑚) 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (8 − 16𝑚𝑚∅ × 6𝑚)
𝐿𝑒𝑛𝑔𝑡ℎ = 2.455𝑚 ≈ 2455𝑚𝑚 𝐿𝑒𝑛𝑔𝑡ℎ = 0.75𝑚 ≈ 750𝑚𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 2.455𝑚 + 0.30𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 0.75𝑚 + 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 2.755𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 1.05𝑚

𝑈𝑠𝑖𝑛𝑔 (8 − 16𝑚𝑚∅ × 6𝑚) 𝑈𝑠𝑖𝑛𝑔 (8 − 16𝑚𝑚∅ × 6𝑚)


(𝑏𝑒𝑎𝑚𝑠) × 8(𝑏𝑎𝑟𝑠) = 8𝑝𝑐𝑠. (𝑏𝑒𝑎𝑚𝑠) × 8(𝑏𝑎𝑟𝑠) = 8𝑝𝑐𝑠.

𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔 𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔


𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
4 × 0.05 = 0.20𝑚 4 × 0.05 = 0.20𝑚
4 × 0.10 = 0.40𝑚 4 × 0.10 = 0.40𝑚
= 0.60𝑚 ≈ 600𝑚𝑚 = 0.60𝑚 ≈ 600𝑚𝑚
𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚 𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚
2755𝑚𝑚 1050𝑚𝑚
− 600𝑚𝑚 = 777.5𝑚𝑚 = 525𝑚𝑚
2 2
777.5𝑚 525𝑚
= 3.888 ≈ 4𝑝𝑐𝑠. = 2.625 ≈ 3𝑝𝑐𝑠.
200𝑚𝑚 200𝑚𝑚
𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 4) × 1(𝑏𝑒𝑎𝑚) 𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 3) × 1(𝑏𝑒𝑎𝑚)
= 12𝑝𝑐𝑠 = 11𝑝𝑐𝑠

𝑻𝒊𝒆 𝑾𝒊𝒓𝒆 𝑻𝒊𝒆 𝑾𝒊𝒓𝒆


𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 12 × 4 = 48 𝑡𝑖𝑒𝑠 𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 11 × 4 = 44 𝑡𝑖𝑒𝑠
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 48 × 0.30𝑚 = 14.4𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 44 × 0.30𝑚 = 13.2𝑚
1𝑘𝑔 1𝑘𝑔
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 14.4𝑚 = 0.27 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 13.2𝑚 = 0.25
53𝑚 53𝑚
1 1
≈ 0.50 𝑜𝑟 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸 ≈ 0.25 𝑜𝑟 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸
2 4
1𝑘𝑔
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 12𝑚 = 0.23
53𝑚
2nd floor Beam-2 g 1
≈ 0.25 𝑜𝑟 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸
4
𝑅𝐵2𝑔 = (1.85𝑚) − 0.2𝑚
𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 1.65𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.35𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.105𝑚2 𝑺𝒖𝒎𝒎𝒂𝒓𝒚:
𝐶𝑒𝑚𝑒𝑛𝑡 = (2.97 + 3.42 + 3.96 + 12.32 + 11.99
+ 2.39 + 2.49 + 2.66 + 7.128
Volume for Roof Beam + 10.152 + 4.54 + 3.40 + 3.40
𝑉 =𝑙×𝐴 + 13.61 + 7.02 + 2.76 + 3.537
𝑉 = 1.65𝑚 × 0.105𝑚2 + 7.182 + 7 + 2.32 + 0.711
𝑉 = 0.173𝑚3 + 1.557) = 113.12 ≈ 114𝑏𝑎𝑔𝑠
𝑆𝑎𝑛𝑑 = (0.165 + 0.19 + 0.22 + 0.68 + 0.67
+ −0.133 + 0.139 + 0.148 + 0.396
𝐶𝑒𝑚𝑒𝑛𝑡 = (0.173𝑚3 × 9.00) = 1.557𝑏𝑎𝑔𝑠 + 0.564 + 0.252 + 0.189 + 0.756
𝑆𝑎𝑛𝑑 = (0.173𝑚3 × 0.50) = 0.087𝑚3 + 0.39 + 0.15 + 0.197 + 0.399
𝐺𝑟𝑎𝑣𝑒𝑙 = (0.173𝑚3 × 1.00) = 0.173𝑚3 + 0.389 + 0.129 + 0.04 + 0.087)
= 6.28 ≈ 7𝑚3
𝐺𝑟𝑎𝑣𝑒𝑙 = (0.33 + 0.38 + 0.44 + 1.37 + 1.33 + 0.266
𝑹𝑺𝑩 + 0.277 + 0.295 + 0.792 + 1.128
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (8 − 16𝑚𝑚∅ × 6𝑚) + 0.504 + 0.378 + 1.512 + 0.78
𝐿𝑒𝑛𝑔𝑡ℎ = 1.65𝑚 ≈ 1650𝑚𝑚 + 0.307 + 0.393 + 0.798 + 0.778
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 1.65𝑚 + 0.30𝑚 + 0.258 + 0.079 + 0.173) = 12.57
≈ 13𝑚3
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 1.95𝑚
𝑅𝑆𝐵
(9 + 9 + 9 + 27 + 27 + 9 + 9 + 9 + 36 + 36
𝑈𝑠𝑖𝑛𝑔 (8 − 16𝑚𝑚∅ × 6𝑚) + 9 + 9 + 36 + 45 + 8 + 8 + 16
1(𝑏𝑒𝑎𝑚𝑠) × 8(𝑏𝑎𝑟𝑠) = 8𝑝𝑐𝑠. + 16 + 8 + 8 + 8)
= 351 𝑝𝑐𝑠. 12𝑚𝑚∅ × 6𝑚
(9 + 6 + 7 + 24 + 21 + 4 + 4 + 4 + 8 + 16 + 9
𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔 + 6 + 24 + 5 + 6 + 8 + 16 + 14
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) + 4 + 3 + 2)
4 × 0.05 = 0.20𝑚 = 200 𝑝𝑐𝑠. 10𝑚𝑚∅ × 6𝑚
4 × 0.10 = 0.40𝑚
𝑇𝑖𝑒 𝑤𝑖𝑟𝑒 = (0.5 + 0.5 + 0.5 + 1.25 + 1.25 + 0.5
= 0.60𝑚 ≈ 600𝑚𝑚 + 0.5 + 0.5 + 1 + 1 + 0.5 + 0.5
𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚 + 1.5 + 1.25 + 0.5 + 0.5 + 0.75
1950𝑚𝑚 + 0.75 + 0.5 + 0.25 + 0.25)
− 600𝑚𝑚 = 375𝑚𝑚 = 14.75 𝑘𝑔
2 3
375𝑚 ≈ 14 𝑘𝑔. #16 𝐺. 𝐼. 𝑊𝑖𝑟𝑒
= 1.875 ≈ 2𝑝𝑐𝑠. 4
200𝑚𝑚
𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 2) × 1(𝑏𝑒𝑎𝑚)
= 10𝑝𝑐𝑠
ROOF Beam 1
𝑅𝐵1 = (7.752𝑚) − 0.2𝑚
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 7.552𝑚
𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 12 × 4 = 40 𝑡𝑖𝑒𝑠
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.20𝑚 × 0.25𝑚
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.05𝑚2
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 40 × 0.30𝑚 = 12𝑚
Volume for Roof Beam Volume for Roof Beam
𝑉 =𝑙×𝐴 𝑉 =𝑙×𝐴
2
𝑉 = 7.552𝑚 × 0.05𝑚 𝑉 = 7.55𝑚 × 0.05𝑚2
𝑉 = 0.378𝑚3 𝑉 = 0.376𝑚3

𝐶𝑒𝑚𝑒𝑛𝑡 = (0.378𝑚3 × 9.00) = 3.402 𝑏𝑎𝑔𝑠 𝐶𝑒𝑚𝑒𝑛𝑡 = 7(0.376𝑚3 × 9.00) = 23.688 𝑏𝑎𝑔𝑠
𝑆𝑎𝑛𝑑 = (0.378𝑚3 × 0.50) = 0.189𝑚3 𝑆𝑎𝑛𝑑 = 7(0.376𝑚3 × 0.50) = 1.316𝑚3
𝐺𝑟𝑎𝑣𝑒𝑙 = (0.378𝑚3 × 1.00) = 0.378𝑚3 𝐺𝑟𝑎𝑣𝑒𝑙 = 7(0.376𝑚3 × 1.00) = 2.632𝑚3

𝑹𝑺𝑩 𝑹𝑺𝑩
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (8 − 16𝑚𝑚∅ × 6𝑚) 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (8 − 16𝑚𝑚∅ × 6𝑚)
𝐿𝑒𝑛𝑔𝑡ℎ = 7.552𝑚 ≈ 7552𝑚𝑚 𝐿𝑒𝑛𝑔𝑡ℎ = 7.55𝑚 ≈ 7550𝑚𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 7.552𝑚 + 0.30𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 7.55𝑚 + 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 7.852𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 7.85𝑚

𝑈𝑠𝑖𝑛𝑔 (4 − 16𝑚𝑚∅ × 6𝑚) 𝑈𝑠𝑖𝑛𝑔 (4 − 16𝑚𝑚∅ × 6𝑚)


1(𝑏𝑒𝑎𝑚𝑠) × 4(𝑏𝑎𝑟𝑠) = 4𝑝𝑐𝑠. 7(𝑏𝑒𝑎𝑚𝑠) × 4(𝑏𝑎𝑟𝑠) = 28𝑝𝑐𝑠.

𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔 𝑺𝒕𝒓𝒊𝒓𝒓𝒖𝒑𝒔 & 𝑻𝒊𝒆𝒔


𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
4 × 0.05 = 0.20𝑚 4 × 0.05 = 0.20𝑚
4 × 0.10 = 0.40𝑚 4 × 0.10 = 0.40𝑚
= 0.60𝑚 ≈ 600𝑚𝑚 = 0.60𝑚 ≈ 600𝑚𝑚
𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚 𝑅𝑒𝑠𝑡 @ 0.20𝑚 ≈ 200𝑚𝑚
7852𝑚𝑚 7850𝑚𝑚
− 600𝑚𝑚 = 3326𝑚𝑚 − 600𝑚𝑚 = 3325𝑚𝑚
2 2
3326𝑚 3325𝑚
= 16.63 ≈ 17 𝑝𝑐𝑠. 𝑥 7 (𝑏𝑒𝑎𝑚𝑠)=119pcs.
= 16.63 ≈ 17 𝑝𝑐𝑠. 200𝑚𝑚
200𝑚𝑚
𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 17) × 7(𝑏𝑒𝑎𝑚)
𝑁𝑜. 𝑜𝑓 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 𝑛𝑒𝑒𝑑𝑒𝑑 = (4 + 4 + 17) × 1(𝑏𝑒𝑎𝑚)
= 175𝑝𝑐𝑠
= 25𝑝𝑐𝑠

𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 175 × 4 = 700 𝑡𝑖𝑒𝑠
𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 25 × 4 = 100 𝑡𝑖𝑒𝑠
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 100 × 0.30𝑚 = 210𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 100 × 0.30𝑚 = 30𝑚
1𝑘𝑔
1𝑘𝑔 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 210𝑚 = 3.96
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 30𝑚 = 0.57 53𝑚
53𝑚 ≈ 4 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸
3
≈ 0.75 𝑜𝑟 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸
4

𝑺𝒖𝒎𝒎𝒂𝒓𝒚:
ROOF Beam 2 𝐶𝑒𝑚𝑒𝑛𝑡 = (3.402 + 23.688) = 27.09 ≈ 59𝑏𝑎𝑔𝑠
𝑆𝑎𝑛𝑑 = (0.189 + 1.316) = 1.505 ≈ 3.6𝑚3
𝑅𝐵1 = (7.75𝑚) − 0.2𝑚
𝐺𝑟𝑎𝑣𝑒𝑙 = (0.378 + 2.632) = 3.01 ≈ 3.10𝑚3
𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 7.55𝑚 𝑅𝑆𝐵
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.20𝑚 × 0.25𝑚 (4 + 28) = 32 𝑝𝑐𝑠. 12𝑚𝑚∅ × 6𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.05𝑚2 (17 + 119)2 = 136𝑝𝑐𝑠. 10𝑚𝑚∅ × 6𝑚
1𝑘𝑔
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 29.40𝑚 = 0.490
𝑇𝑖𝑒 𝑤𝑖𝑟𝑒 = (0.75 + 4) = 4.75 𝑘𝑔 60𝑚
3 1
≈ 4 𝑘𝑔. #16 𝐺. 𝐼. 𝑊𝑖𝑟𝑒 ≈ 0.5 𝑜𝑟 𝑘𝑔. #18 𝐺. 𝐼 𝑊𝐼𝑅𝐸
4 2

7. slab: 𝐴𝑟𝑒𝑎2 = 4.0𝑚 × 7.75𝑚


𝐴𝑟𝑒𝑎2 = 31.0𝑚2

ground floor: Volume of Fill


1
𝐴𝑟𝑒𝑎1 = (2.952 + 3.857)(3.35 + 4.4) 𝑉 =𝑑×𝐴
2
𝑉 = 0.175𝑚 × 31𝑚2
𝐴𝑟𝑒𝑎1 = 26.385𝑚2
𝑉 = 5.425𝑚3

Volume of Fill
𝑉 =𝑑×𝐴
Volume for Flooring
𝑉 = 0.175𝑚 × 26.385𝑚2
𝑉 = 4.62𝑚3 𝑉 =𝑡×𝐴
𝑉 = 0.125𝑚 × 31𝑚2
𝑉 = 3.875𝑚3
Volume for Flooring Total Volume = 5.425 +3.3875
= 9.3 cu. m
𝑉 =𝑡×𝐴
𝑉 = 0.125𝑚 × 26.385𝑚2 𝐶𝑒𝑚𝑒𝑛𝑡 = 9.3𝑚3 × 9.00 = 83.7𝑏𝑎𝑔𝑠 𝑠𝑎𝑦 84 𝑏𝑎𝑔𝑠
𝑉 = 3.30𝑚3 𝑆𝑎𝑛𝑑 = 9.3𝑚3 × 0.50 = 4.65𝑚3
Total Volume = 4.62 +3.3 𝐺𝑟𝑎𝑣𝑒𝑙 = 9.3𝑚3 × 1.00 = 9.3𝑚3
= 7.92 cu. m

𝑹𝑺𝑩
𝐶𝑒𝑚𝑒𝑛𝑡 = 7.92𝑚3 × 9.00 = 71.28𝑏𝑎𝑔𝑠 𝑠𝑎𝑦 72 𝑏𝑎𝑔𝑠 𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
𝑆𝑎𝑛𝑑 = 7.92𝑚3 × 0.50 = 3.96𝑚3 1𝑝𝑐
𝐺𝑟𝑎𝑣𝑒𝑙 = 7.92𝑚3 × 1.00 = 7.92𝑚3 𝑁 = 31𝑚 × = 46.27 ≈ 47𝑝𝑐𝑠.
0.6𝑚
𝑈𝑠𝑖𝑛𝑔 (12𝑚𝑚∅ × 6𝑚)
𝑹𝑺𝑩 1𝑝𝑐
𝑁 = 31𝑚 × = 46.27 ≈ 47𝑝𝑐𝑠.
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 0.6𝑚
1𝑝𝑐
𝑁 = 26.385𝑚 × = 39.38 ≈ 40𝑝𝑐𝑠. 𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
0.67𝑚
𝑈𝑠𝑖𝑛𝑔 (12𝑚𝑚∅ × 6𝑚) 4 7.75
𝑁𝑇𝑊 = [ ]×[ ] = 86.11 ≈ 87𝑝𝑐𝑠.
1𝑝𝑐 0.60 0.60
𝑁 = 26.385𝑚 × = 39.38 ≈ 40𝑝𝑐𝑠 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚
0.67𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 87 × 0.20𝑚 = 17.4𝑚
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆 1𝑘𝑔
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 17.40𝑚 = 0.290
6.801 7.75 60𝑚
𝑁𝑇𝑊 = [ ]×[ ] = 146.41 ≈ 147𝑝𝑐𝑠. 1
0.60 0.60 ≈ 0.50 𝑜𝑟 𝑘𝑔. #18 𝐺. 𝐼 𝑊𝐼𝑅𝐸
2
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 147 × 0.20𝑚29.4𝑚
𝐴𝑟𝑒𝑎3 = 3.90𝑚 × 7.75𝑚
𝐴𝑟𝑒𝑎3 = 30.2250𝑚2
Volume of Fill 𝑉 = 0.125𝑚 × 18.755𝑚2
𝑉 =𝑑×𝐴 𝑉 = 2.344𝑚3
𝑉 = 0.175𝑚 × 30.225𝑚2 Total Volume = 3.28 +2.344
𝑉 = 5.29𝑚3 = 5.624 cu. m

𝐶𝑒𝑚𝑒𝑛𝑡 = 5.624𝑚3 × 9.00 = 50.616 𝑠𝑎𝑦 51 𝑏𝑎𝑔𝑠


Volume for Flooring 𝑆𝑎𝑛𝑑 = 5.624𝑚3 × 0.50 = 2.812𝑚3
𝐺𝑟𝑎𝑣𝑒𝑙 = 5.624𝑚3 × 1.00 = 5.624𝑚3
𝑉 =𝑡×𝐴
𝑉 = 0.125𝑚 × 30.225𝑚2
𝑹𝑺𝑩
𝑉 = 3.778𝑚3
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
Total Volume = 5.29 +3.778 1𝑝𝑐
= 9.068 cu. m 𝑁 = 18.755𝑚 × = 27.99 ≈ 28𝑝𝑐𝑠.
0.67𝑚
𝑈𝑠𝑖𝑛𝑔 (12𝑚𝑚∅ × 6𝑚)
𝐶𝑒𝑚𝑒𝑛𝑡 = 9.068𝑚3 × 9.00 = 81.612 𝑠𝑎𝑦 82 𝑏𝑎𝑔𝑠 1𝑝𝑐
𝑁 = 18.755𝑚 × = 27.99 ≈ 28𝑝𝑐𝑠..
𝑆𝑎𝑛𝑑 = 9.068𝑚3 × 0.50 = 4.534𝑚3 0.67𝑚
𝐺𝑟𝑎𝑣𝑒𝑙 = 9.068𝑚3 × 1.00 = 9.068𝑚3
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
2.42 7.75
𝑹𝑺𝑩 𝑁𝑇𝑊 = [ ]×[ ] = 52.1 ≈ 53𝑝𝑐𝑠.
0.60 0.60
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚
1𝑝𝑐
𝑁 = 30.225𝑚 × = 45.11 ≈ 46𝑝𝑐𝑠. 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 53 × 0.20𝑚 = 10.6𝑚
0.67𝑚
1𝑘𝑔
𝑈𝑠𝑖𝑛𝑔 (12𝑚𝑚∅ × 6𝑚) 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 10.6𝑚 = 0.1760
60𝑚
1𝑝𝑐 1
𝑁 = 30.225𝑚 × = 45.11 ≈ 46𝑝𝑐𝑠. ≈ 0.25 𝑜𝑟 𝑘𝑔. #18 𝐺. 𝐼 𝑊𝐼𝑅𝐸
0.67𝑚 4

𝑻𝒊𝒆 𝑾𝒊𝒓𝒆 𝐴𝑟𝑒𝑎4 = 13.272𝑚 × 2.0𝑚


3.9 7.75 𝐴𝑟𝑒𝑎4 = 26.544𝑚2
𝑁𝑇𝑊 = [ ]×[ ] = 83.96 ≈ 84𝑝𝑐𝑠.
0.60 0.60
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 84 × 0.20𝑚 = 16.8𝑚
Volume of Fill
1𝑘𝑔 𝑉 =𝑑×𝐴
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 16.80𝑚 = 0.280
60𝑚 𝑉 = 0.175𝑚 × 26.544𝑚2
1 𝑉 = 4.65𝑚3
≈ 0.50 𝑜𝑟 𝑘𝑔. #18 𝐺. 𝐼 𝑊𝐼𝑅𝐸
2

𝐶𝑒𝑚𝑒𝑛𝑡 = 4.65𝑚3 × 9.00 = 41.85 𝑠𝑎𝑦 42 𝑏𝑎𝑔𝑠


𝐴𝑟𝑒𝑎4 = 2.420𝑚 × 7.75𝑚
𝑆𝑎𝑛𝑑 = 4.65𝑚3 × 0.50 = 2.325𝑚3
𝐴𝑟𝑒𝑎4 = 18.755𝑚2
𝐺𝑟𝑎𝑣𝑒𝑙 = 4.65𝑚3 × 1.00 = 4.65𝑚3

Volume of Fill 𝑹𝑺𝑩


𝑉 =𝑑×𝐴 𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
𝑉 = 0.175𝑚 × 18.755𝑚2 1𝑝𝑐
𝑉 = 3.28𝑚3 𝑁 = 26.544𝑚 × = 39.62 ≈ 40𝑝𝑐𝑠.
0.67𝑚
Volume for Flooring 𝑈𝑠𝑖𝑛𝑔 (12𝑚𝑚∅ × 6𝑚)
1𝑝𝑐
𝑁 = 26.544𝑚 × = 39.62 ≈ 40𝑝𝑐𝑠.
0.67𝑚
𝑉 =𝑡×𝐴
1𝑝𝑐
𝑁 = 26.385𝑚 × = 39.38 ≈ 40𝑝𝑐𝑠.
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆 0.67𝑚
13.272 2 𝑈𝑠𝑖𝑛𝑔 (12𝑚𝑚∅ × 6𝑚)
𝑁𝑇𝑊 = [ ]×[ ] = 73.73 ≈ 74𝑝𝑐𝑠. 1𝑝𝑐
0.60 0.60 𝑁 = 26.385𝑚 × = 39.38 ≈ 40𝑝𝑐𝑠
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚 0.67𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 74 × 0.20𝑚 = 14.8𝑚
1𝑘𝑔 𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 14.8𝑚 = 0.2460 6.801 7.75
60𝑚 𝑁𝑇𝑊 = [ ]×[ ] = 146.41 ≈ 147𝑝𝑐𝑠.
1 0.60 0.60
≈ 0.25 𝑜𝑟 𝑘𝑔. #18 𝐺. 𝐼 𝑊𝐼𝑅𝐸
4 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 147 × 0.20𝑚29.4𝑚
𝑺𝒖𝒎𝒎𝒂𝒓𝒚: 1𝑘𝑔
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 29.40𝑚 = 0.490
𝐶𝑒𝑚𝑒𝑛𝑡 = 331𝑏𝑎𝑔𝑠 60𝑚
𝑆𝑎𝑛𝑑 = 18.281 ≈ 19.00𝑚3 1
≈ 0.5 𝑜𝑟 𝑘𝑔. #18 𝐺. 𝐼 𝑊𝐼𝑅𝐸
𝐺𝑟𝑎𝑣𝑒𝑙 = 36.562 ≈ 37.00𝑚3 2
𝑅𝑆𝐵
= 101𝑝𝑐𝑠. 10𝑚𝑚∅ × 6𝑚 𝐴𝑟𝑒𝑎2 = 4.0𝑚 × 7.75𝑚
= 101𝑝𝑐𝑠. 10𝑚𝑚∅ × 6𝑚 𝐴𝑟𝑒𝑎2 = 31.0𝑚2
𝑇𝑖𝑒 𝑤𝑖𝑟𝑒 = 2𝑘𝑔 ≈ 2𝑘𝑔. #18 𝐺. 𝐼. 𝑊𝑖𝑟𝑒

Volume of Fill
𝑉 =𝑑×𝐴
2nd floor: 𝑉 = 0.175𝑚 × 31𝑚2
1
𝐴𝑟𝑒𝑎1 = (2.952 + 3.857)(3.35 + 4.4) 𝑉 = 5.425𝑚3
2
𝐴𝑟𝑒𝑎1 = 26.385𝑚2
Volume for Flooring
Volume of Fill
𝑉 =𝑑×𝐴 𝑉 =𝑡×𝐴
𝑉 = 0.175𝑚 × 26.385𝑚 2 𝑉 = 0.125𝑚 × 31𝑚2
𝑉 = 4.62𝑚3 𝑉 = 3.875𝑚3
Total Volume = 5.425 +3.3875
= 9.3 cu. m
Volume for Flooring
𝐶𝑒𝑚𝑒𝑛𝑡 = 9.3𝑚3 × 9.00 = 83.7𝑏𝑎𝑔𝑠 𝑠𝑎𝑦 84 𝑏𝑎𝑔𝑠
𝑉 =𝑡×𝐴
𝑆𝑎𝑛𝑑 = 9.3𝑚3 × 0.50 = 4.65𝑚3
𝑉 = 0.125𝑚 × 26.385𝑚2
𝐺𝑟𝑎𝑣𝑒𝑙 = 9.3𝑚3 × 1.00 = 9.3𝑚3
𝑉 = 3.30𝑚3
Total Volume = 4.62 +3.3
𝑹𝑺𝑩
= 7.92 cu. m
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
1𝑝𝑐
𝐶𝑒𝑚𝑒𝑛𝑡 = 7.92𝑚3 × 9.00 = 71.28𝑏𝑎𝑔𝑠 𝑠𝑎𝑦 72 𝑏𝑎𝑔𝑠 𝑁 = 31𝑚 × = 46.27 ≈ 47𝑝𝑐𝑠.
0.6𝑚
𝑆𝑎𝑛𝑑 = 7.92𝑚3 × 0.50 = 3.96𝑚3 𝑈𝑠𝑖𝑛𝑔 (12𝑚𝑚∅ × 6𝑚)
𝐺𝑟𝑎𝑣𝑒𝑙 = 7.92𝑚3 × 1.00 = 7.92𝑚3 1𝑝𝑐
𝑁 = 31𝑚 × = 46.27 ≈ 47𝑝𝑐𝑠.
0.6𝑚
𝑹𝑺𝑩
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
4 7.75
𝑁𝑇𝑊 = [ ]×[ ] = 86.11 ≈ 87𝑝𝑐𝑠.
0.60 0.60 𝐴𝑟𝑒𝑎4 = 2.420𝑚 × 7.75𝑚
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚 𝐴𝑟𝑒𝑎4 = 18.755𝑚2
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 87 × 0.20𝑚 = 17.4𝑚
1𝑘𝑔
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 17.40𝑚
60𝑚
= 0.290 Volume of Fill
1 𝑉 =𝑑×𝐴
≈ 0.50 𝑜𝑟 𝑘𝑔. #18 𝐺. 𝐼 𝑊𝐼𝑅𝐸
2 𝑉 = 0.175𝑚 × 18.755𝑚2
𝑉 = 3.28𝑚3
𝐴𝑟𝑒𝑎3 = 3.90𝑚 × 7.75𝑚
Volume for Flooring
𝐴𝑟𝑒𝑎3 = 30.2250𝑚2

𝑉 =𝑡×𝐴
Volume of Fill
𝑉 = 0.125𝑚 × 18.755𝑚2
𝑉 =𝑑×𝐴 𝑉 = 2.344𝑚3
2
𝑉 = 0.175𝑚 × 30.225𝑚 Total Volume = 3.28 +2.344
𝑉 = 5.29𝑚3
= 5.624 cu. m

Volume for Flooring 𝐶𝑒𝑚𝑒𝑛𝑡 = 5.624𝑚3 × 9.00 = 50.616 𝑠𝑎𝑦 51 𝑏𝑎𝑔𝑠


𝑆𝑎𝑛𝑑 = 5.624𝑚3 × 0.50 = 2.812𝑚3
𝑉 =𝑡×𝐴 𝐺𝑟𝑎𝑣𝑒𝑙 = 5.624𝑚3 × 1.00 = 5.624𝑚3
𝑉 = 0.125𝑚 × 30.225𝑚2
𝑉 = 3.778𝑚3 𝑹𝑺𝑩
Total Volume = 5.29 +3.778 𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
= 9.068 cu. m 1𝑝𝑐
𝑁 = 18.755𝑚 × = 27.99 ≈ 28𝑝𝑐𝑠.
0.67𝑚
𝑈𝑠𝑖𝑛𝑔 (12𝑚𝑚∅ × 6𝑚)
𝐶𝑒𝑚𝑒𝑛𝑡 = 9.068𝑚3 × 9.00 = 81.612 𝑠𝑎𝑦 82 𝑏𝑎𝑔𝑠
1𝑝𝑐
𝑆𝑎𝑛𝑑 = 9.068𝑚3 × 0.50 = 4.534𝑚3 𝑁 = 18.755𝑚 × = 27.99 ≈ 28𝑝𝑐𝑠..
0.67𝑚
𝐺𝑟𝑎𝑣𝑒𝑙 = 9.068𝑚3 × 1.00 = 9.068𝑚3
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝑹𝑺𝑩 2.42 7.75
𝑁𝑇𝑊 = [ ]×[ ] = 52.1 ≈ 53𝑝𝑐𝑠.
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 0.60 0.60
1𝑝𝑐 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚
𝑁 = 30.225𝑚 × = 45.11 ≈ 46𝑝𝑐𝑠.
0.67𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 53 × 0.20𝑚 = 10.6𝑚
𝑈𝑠𝑖𝑛𝑔 (12𝑚𝑚∅ × 6𝑚) 1𝑘𝑔
1𝑝𝑐 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 10.6𝑚 = 0.1760
60𝑚
𝑁 = 30.225𝑚 × = 45.11 ≈ 46𝑝𝑐𝑠. 1
0.67𝑚 ≈ 0.25 𝑜𝑟 𝑘𝑔. #18 𝐺. 𝐼 𝑊𝐼𝑅𝐸
4
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆 𝑺𝒖𝒎𝒎𝒂𝒓𝒚:
3.9 7.75 𝐶𝑒𝑚𝑒𝑛𝑡 = 229𝑏𝑎𝑔𝑠
𝑁𝑇𝑊 = [ ]×[ ] = 83.96 ≈ 84𝑝𝑐𝑠. 𝑆𝑎𝑛𝑑 = 15.956 ≈ 16.00𝑚3
0.60 0.60
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚 𝐺𝑟𝑎𝑣𝑒𝑙 = 31.912 ≈ 32.00𝑚3
𝑅𝑆𝐵
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 84 × 0.20𝑚 = 16.8𝑚
= 161𝑝𝑐𝑠. 10𝑚𝑚∅ × 6𝑚
1𝑘𝑔
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 16.80𝑚 = 0.280 = 161𝑝𝑐𝑠. 10𝑚𝑚∅ × 6𝑚
60𝑚 3
1 𝑇𝑖𝑒 𝑤𝑖𝑟𝑒 = 1.75𝑘𝑔 ≈ 1 𝑘𝑔. #18 𝐺. 𝐼. 𝑊𝑖𝑟𝑒
≈ 0.50 𝑜𝑟 𝑘𝑔. #18 𝐺. 𝐼 𝑊𝐼𝑅𝐸 4
2
𝑉 =𝑑×𝐴
ROOF floor: 𝑉 = 0.175𝑚 × 31𝑚2
1
𝐴𝑟𝑒𝑎1 = (2.952 + 3.857)(3.35 + 4.4) 𝑉 = 5.425𝑚3
2
𝐴𝑟𝑒𝑎1 = 26.385𝑚2
Volume for Flooring
Volume of Fill
𝑉 =𝑑×𝐴 𝑉 =𝑡×𝐴
𝑉 = 0.175𝑚 × 26.385𝑚2 𝑉 = 0.125𝑚 × 31𝑚2
𝑉 = 4.62𝑚3 𝑉 = 3.875𝑚3
Total Volume = 5.425 +3.3875
= 9.3 cu. m
Volume for Flooring
𝐶𝑒𝑚𝑒𝑛𝑡 = 9.3𝑚3 × 9.00 = 83.7𝑏𝑎𝑔𝑠 𝑠𝑎𝑦 84 𝑏𝑎𝑔𝑠
𝑉 =𝑡×𝐴
𝑆𝑎𝑛𝑑 = 9.3𝑚3 × 0.50 = 4.65𝑚3
𝑉 = 0.125𝑚 × 26.385𝑚2
𝐺𝑟𝑎𝑣𝑒𝑙 = 9.3𝑚3 × 1.00 = 9.3𝑚3
𝑉 = 3.30𝑚3
Total Volume = 4.62 +3.3
𝑹𝑺𝑩
= 7.92 cu. m
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
1𝑝𝑐
𝐶𝑒𝑚𝑒𝑛𝑡 = 7.92𝑚3 × 9.00 = 71.28𝑏𝑎𝑔𝑠 𝑠𝑎𝑦 72 𝑏𝑎𝑔𝑠 𝑁 = 31𝑚 × = 46.27 ≈ 47𝑝𝑐𝑠.
0.6𝑚
𝑆𝑎𝑛𝑑 = 7.92𝑚3 × 0.50 = 3.96𝑚3 𝑈𝑠𝑖𝑛𝑔 (12𝑚𝑚∅ × 6𝑚)
𝐺𝑟𝑎𝑣𝑒𝑙 = 7.92𝑚3 × 1.00 = 7.92𝑚3 1𝑝𝑐
𝑁 = 31𝑚 × = 46.27 ≈ 47𝑝𝑐𝑠.
0.6𝑚
𝑹𝑺𝑩
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
1𝑝𝑐 4 7.75
𝑁 = 26.385𝑚 × = 39.38 ≈ 40𝑝𝑐𝑠. 𝑁𝑇𝑊 = [ ]×[ ] = 86.11 ≈ 87𝑝𝑐𝑠.
0.67𝑚 0.60 0.60
𝑈𝑠𝑖𝑛𝑔 (12𝑚𝑚∅ × 6𝑚) 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚
1𝑝𝑐 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 87 × 0.20𝑚 = 17.4𝑚
𝑁 = 26.385𝑚 × = 39.38 ≈ 40𝑝𝑐𝑠 1𝑘𝑔
0.67𝑚 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 17.40𝑚 = 0.290
60𝑚
1
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆 ≈ 0.50 𝑜𝑟 𝑘𝑔. #18 𝐺. 𝐼 𝑊𝐼𝑅𝐸
2
6.801 7.75
𝑁𝑇𝑊 = [ ]×[ ] = 146.41 ≈ 147𝑝𝑐𝑠.
0.60 0.60
𝐴𝑟𝑒𝑎3 = 3.90𝑚 × 7.75𝑚
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚
𝐴𝑟𝑒𝑎3 = 30.2250𝑚2
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 147 × 0.20𝑚29.4𝑚
1𝑘𝑔
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 29.40𝑚 = 0.490
60𝑚 Volume of Fill
1
≈ 0.5 𝑜𝑟 𝑘𝑔. #18 𝐺. 𝐼 𝑊𝐼𝑅𝐸 𝑉 =𝑑×𝐴
2
𝑉 = 0.175𝑚 × 30.225𝑚2
𝑉 = 5.29𝑚3
𝐴𝑟𝑒𝑎2 = 4.0𝑚 × 7.75𝑚
𝐴𝑟𝑒𝑎2 = 31.0𝑚2
Volume for Flooring
Volume of Fill
𝑉 =𝑡×𝐴
𝑉 = 0.125𝑚 × 30.225𝑚2
𝑉 = 3.778𝑚3 𝑹𝑺𝑩
Total Volume = 5.29 +3.778 𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
= 9.068 cu. m 1𝑝𝑐
𝑁 = 18.755𝑚 × = 27.99 ≈ 28𝑝𝑐𝑠.
0.67𝑚
𝐶𝑒𝑚𝑒𝑛𝑡 = 9.068𝑚3 × 9.00 = 81.612 𝑠𝑎𝑦 82 𝑏𝑎𝑔𝑠 𝑈𝑠𝑖𝑛𝑔 (12𝑚𝑚∅ × 6𝑚)
1𝑝𝑐
𝑆𝑎𝑛𝑑 = 9.068𝑚3 × 0.50 = 4.534𝑚3 𝑁 = 18.755𝑚 × = 27.99 ≈ 28𝑝𝑐𝑠..
0.67𝑚
𝐺𝑟𝑎𝑣𝑒𝑙 = 9.068𝑚3 × 1.00 = 9.068𝑚3

𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝑹𝑺𝑩 2.42 7.75
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 𝑁𝑇𝑊 = [ ]×[ ] = 52.1 ≈ 53𝑝𝑐𝑠.
0.60 0.60
1𝑝𝑐 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚
𝑁 = 30.225𝑚 × = 45.11 ≈ 46𝑝𝑐𝑠.
0.67𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 53 × 0.20𝑚 = 10.6𝑚
𝑈𝑠𝑖𝑛𝑔 (12𝑚𝑚∅ × 6𝑚) 1𝑘𝑔
1𝑝𝑐 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 10.6𝑚 = 0.1760
𝑁 = 30.225𝑚 × = 45.11 ≈ 46𝑝𝑐𝑠. 60𝑚
0.67𝑚 1
≈ 0.25 𝑜𝑟 𝑘𝑔. #18 𝐺. 𝐼 𝑊𝐼𝑅𝐸
4
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆 𝑺𝒖𝒎𝒎𝒂𝒓𝒚:
3.9 7.75 𝐶𝑒𝑚𝑒𝑛𝑡 = 229𝑏𝑎𝑔𝑠
𝑁𝑇𝑊 = [ ]×[ ] = 83.96 ≈ 84𝑝𝑐𝑠. 𝑆𝑎𝑛𝑑 = 15.956 ≈ 16.00𝑚3
0.60 0.60
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚 𝐺𝑟𝑎𝑣𝑒𝑙 = 31.912 ≈ 32.00𝑚3
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 84 × 0.20𝑚 = 16.8𝑚 𝑅𝑆𝐵
1𝑘𝑔 = 161𝑝𝑐𝑠. 10𝑚𝑚∅ × 6𝑚
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 16.80𝑚 = 0.280 = 161𝑝𝑐𝑠. 10𝑚𝑚∅ × 6𝑚
60𝑚
1 3
≈ 0.50 𝑜𝑟 𝑘𝑔. #18 𝐺. 𝐼 𝑊𝐼𝑅𝐸 𝑇𝑖𝑒 𝑤𝑖𝑟𝑒 = 1.75𝑘𝑔 ≈ 1 𝑘𝑔. #18 𝐺. 𝐼. 𝑊𝑖𝑟𝑒
2 4

𝐴𝑟𝑒𝑎4 = 2.420𝑚 × 7.75𝑚 8. Stairs:


2
𝐴𝑟𝑒𝑎4 = 18.755𝑚

Volume of Excavation
Volume of Fill
𝑉 =𝑙×𝑤×ℎ
𝑉 =𝑑×𝐴
𝑉 = 0.2𝑚 × 0.70𝑚 × .80𝑚
𝑉 = 0.175𝑚 × 18.755𝑚2
𝑉 = 0.112𝑚3
𝑉 = 3.28𝑚3
𝑺𝒕𝒂𝒊𝒓𝒄𝒂𝒔𝒆 𝑫𝒊𝒎𝒆𝒏𝒔𝒊𝒐𝒏
Volume for Flooring 𝑊𝑖𝑑𝑡ℎ = 0.18𝑚
𝐿𝑒𝑛𝑔𝑡ℎ = 0.30𝑚
𝑉 =𝑡×𝐴 𝑇ℎ𝑖𝑐𝑘𝑛𝑒𝑠𝑠 = 0.125𝑚
𝑉 = 0.125𝑚 × 18.755𝑚2
𝑉 = 2.344𝑚3
Total Volume = 3.28 +2.344
= 5.624 cu. m Volume of Staircase

𝐶𝑒𝑚𝑒𝑛𝑡 = 5.624𝑚3 × 9.00 = 50.616 𝑠𝑎𝑦 51 𝑏𝑎𝑔𝑠 𝑉 =𝑙×𝑤×𝑡


𝑆𝑎𝑛𝑑 = 5.624𝑚3 × 0.50 = 2.812𝑚3 𝑉 = 0.18𝑚 × 0.30𝑚 × 0.125𝑚
𝐺𝑟𝑎𝑣𝑒𝑙 = 5.624𝑚3 × 1.00 = 5.624𝑚3 𝑉 = 0.00675𝑚3
𝑨𝒓𝒆𝒂
𝐴𝑟𝑒𝑎1 = 1.00𝑚 × 0.80𝑚 𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
2 0.80 0.80
𝐴𝑟𝑒𝑎1 = 0.80𝑚
𝑁𝑇𝑊 = [ ]×[ ] = 1.78 ≈ 2𝑝𝑐𝑠.
0.60 0.60
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚
𝐶𝑒𝑚𝑒𝑛𝑡 = 0.192𝑚3 × 9.00 = 1.73 𝑏𝑎𝑔𝑠
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 2 × 0.20𝑚 = 0.40 ≈ 1𝑚
𝑆𝑎𝑛𝑑 = 0.192𝑚3 × 0.50 = 0.1𝑚3
1𝑘𝑔
𝐺𝑟𝑎𝑣𝑒𝑙 = 0.192𝑚3 × 1.00 = 0.192𝑚3 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 1𝑚 = 0.02𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸
53𝑚

𝑹𝑺𝑩 𝑺𝒖𝒎𝒎𝒂𝒓𝒚:
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 𝑇𝑜𝑡𝑎𝑙 𝑉𝑜𝑙𝑢𝑚𝑒 𝑜𝑓 𝐶𝑢𝑡 = 0.062𝑚3
1𝑝𝑐 𝐶𝑒𝑚𝑒𝑛𝑡 = (1.39 + 1.73) = 3.12 ≈ 4 𝑏𝑎𝑔𝑠
𝑁 = 0.80𝑚2 × = 1.19 ≈ 2𝑝𝑐𝑠.
0.67𝑚2 𝑆𝑎𝑛𝑑 = (0.08 + 0.10) = 0.18 ≈ 0.50𝑚3
𝐺𝑟𝑎𝑣𝑒𝑙 = (0.14 + 0.192) = 0.33 ≈ 0.50𝑚3
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆 𝑅𝑆𝐵
1.00 0.80 (1 + 2) = 3𝑝𝑐𝑠. 10𝑚𝑚∅ × 6𝑚
𝑁𝑇𝑊 = [ ]×[ ] = 2.22 ≈ 3𝑝𝑐𝑠.
0.60 0.60 𝑇𝑖𝑒 𝑤𝑖𝑟𝑒 = (0.2 + 0.2) = 0.40
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚 1
≈ 50 𝑜𝑟 𝑘𝑔. #18 𝐺. 𝐼. 𝑊𝑖𝑟𝑒
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 3 × 0.20𝑚 = 0.60 ≈ 1𝑚 2
1𝑘𝑔
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 1𝑚 = 0.02𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸
53𝑚

Volume of Excavation
𝑉 =𝑙×𝑤×ℎ
𝑉 = 0.40𝑚 × 0.80𝑚 × 0.80𝑚
𝑉 = 0.23𝑚3

𝑺𝒕𝒂𝒊𝒓𝒄𝒂𝒔𝒆 𝑫𝒊𝒎𝒆𝒏𝒔𝒊𝒐𝒏
𝑊𝑖𝑑𝑡ℎ = 0.80𝑚
𝐿𝑒𝑛𝑔𝑡ℎ = 0.80𝑚
𝑇ℎ𝑖𝑐𝑘𝑛𝑒𝑠𝑠 = 0.24𝑚

Volume of Staircase

𝑉 =𝑙×𝑤×𝑡
𝑉 = 0.80𝑚 × 0.80𝑚 × 0.24𝑚
𝑉 = 0.154𝑚3

𝐶𝑒𝑚𝑒𝑛𝑡 = 0.154𝑚3 × 9.00 = 1.39 𝑏𝑎𝑔𝑠


𝑆𝑎𝑛𝑑 = 0.154𝑚3 × 0.50 = 0.08𝑚3
𝐺𝑟𝑎𝑣𝑒𝑙 = 0.154𝑚3 × 1.00 = 0.154𝑚3

𝑹𝑺𝑩
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
1𝑝𝑐
𝑁 = 0.64𝑚2 × = 0.96 ≈ 1𝑝𝑐.
0.67𝑚2

Вам также может понравиться