225𝑚3
1. EXCAVATION: 𝐺𝑟𝑎𝑣𝑒𝑙 = 0.450𝑚3 × 1.00 = 0.450𝑚3
𝑹𝑺𝑩
∙ 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (9 − 16𝑚𝑚∅ × 6𝑚)
4. Wall footing:
∙ 𝑆𝑡𝑖𝑟𝑟𝑢𝑝𝑠 & 𝑇𝑖𝑒𝑠
3 × 0.05 = 0.150𝑚 Volume for Wall Footing
3 × 0.075 = 0.2250𝑚
𝑉 =𝑙×𝑤×ℎ
3 × 0.10 = 0.30𝑚
𝑉 = 20.48𝑚 × 0.3𝑚 × 0.3𝑚
= 0.675𝑚 ≈ 675𝑚𝑚
𝑉 = 1.840𝑚3
𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑊𝑎𝑙𝑙 = 3.3𝑚
3
𝐶𝑒𝑚𝑒𝑛𝑡 = 1.84𝑚 × 9.00 = 16.56 ≈ 17 𝑏𝑎𝑔𝑠 𝐴𝑟𝑒𝑎 = 14.705𝑚 × 3.30𝑚
𝑆𝑎𝑛𝑑 = 1.84𝑚3 × 0.50 = 0.92 ≈ 1.0𝑚3 𝐴𝑟𝑒𝑎 = 48.53𝑚2
𝐺𝑟𝑎𝑣𝑒𝑙 = 1.84𝑚3 × 1.00 = 1.84 ≈ 2.0𝑚3
𝑫𝒆𝒅𝒖𝒄𝒕𝒊𝒐𝒏𝒔
𝑊𝑖𝑛𝑑𝑜𝑤 (1) = 3(1.20𝑚 × 1.2𝑚) = 4.32𝑚2
𝐷𝑜𝑜𝑟1 = 3(.90𝑚 × 2.1𝑚) = 5.67𝑚2
𝑹𝑺𝑩
Window = 3(.46m x 1.66 m) = 2.29𝑚2
𝑉𝑒𝑟𝑡𝑖𝑐𝑎𝑙 𝑢𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
𝑇𝑜𝑡𝑎𝑙 𝐷𝑒𝑑𝑢𝑐𝑡𝑖𝑜𝑛𝑠 = 12.28𝑚2
6.9 × 48.97 = 337.893𝑚
337.893𝑚 𝑇𝑜𝑡𝑎𝑙 𝐴𝑟𝑒𝑎 𝐶𝑜𝑣𝑒𝑟𝑒𝑑 = 48.53𝑚2 − 12.28𝑚2
𝑁𝑜. 𝑜𝑓 𝑅𝑆𝐵 = = 56.32 ≈ 57𝑝𝑐𝑠. = 36.25𝑚2
6𝑚
𝑁𝑜. 𝑜𝑓 6" 𝐶𝐻𝐵 = 36.25𝑚2 × 12.50 = 453.13
𝐻𝑜𝑟𝑖𝑧𝑜𝑛𝑡𝑎𝑙 𝑢𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
≈ 454𝑝𝑐𝑠.
52.28𝑚
𝑁𝑜. 𝑜𝑓 𝑅𝑆𝐵 𝑛𝑒𝑒𝑑𝑒𝑑 = = 87.14 ≈ 88𝑝𝑐𝑠 𝑳𝒆𝒇𝒕 − 𝒔𝒊𝒅𝒆 𝑷𝒂𝒓𝒕 𝒐𝒇 𝒕𝒉𝒆 𝑾𝒂𝒍𝒍
0.60𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑊𝑎𝑙𝑙 = 10.45𝑚
𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑊𝑎𝑙𝑙 = 3.30𝑚
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.35𝑚
𝐴𝑟𝑒𝑎 = 10.45𝑚 × 3.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 88 × 0.35𝑚 = 30.80𝑚
𝐴𝑟𝑒𝑎 = 34.49𝑚2
30.8𝑚
𝑁𝑜. 𝑜𝑓 𝑅𝑆𝐵 = = 5.13 ≈ 6𝑝𝑐𝑠 𝑇𝑜𝑡𝑎𝑙 𝐴𝑟𝑒𝑎 𝐶𝑜𝑣𝑒𝑟𝑒𝑑 = 34.49𝑚2
6𝑚
𝑇𝑜𝑡𝑎𝑙 𝑁𝑜. 𝑜𝑓 𝑅𝑆𝐵 = 88 + 6 + 57 = 151𝑝𝑐𝑠. 𝑁𝑜. 𝑜𝑓 6" 𝐶𝐻𝐵 = 34.49𝑚2 × 12.50 = 431.13
≈ 432𝑝𝑐𝑠.
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝑹𝒊𝒈𝒉𝒕 − 𝒔𝒊𝒅𝒆 𝑷𝒂𝒓𝒕 𝒐𝒇 𝒕𝒉𝒆 𝑾𝒂𝒍𝒍 𝒂𝒏𝒅 𝒇𝒊𝒓𝒆𝒘𝒂𝒍𝒍
𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 151 × 3 = 453 𝑡𝑖𝑒𝑠
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑊𝑎𝑙𝑙 = 13.068𝑚
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚 𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑊𝑎𝑙𝑙 = 3.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 453 × 0.20𝑚 = 90.6𝑚 𝐴𝑟𝑒𝑎 = 13.068 × 3.30𝑚
1𝑘𝑔 𝐴𝑟𝑒𝑎 = 43. .13𝑚2
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 90.6𝑚 = 1.51
60𝑚 𝑇𝑜𝑡𝑎𝑙 𝐴𝑟𝑒𝑎 𝐶𝑜𝑣𝑒𝑟𝑒𝑑 = 43.13𝑚2
≈ 1.5𝑘𝑔. #18 𝐺. 𝐼 𝑊𝐼𝑅𝐸
𝑁𝑜. 𝑜𝑓 6" 𝐶𝐻𝐵 = 43.13𝑚2 × 12.50 = 539.13
≈ 540𝑝𝑐𝑠.
𝑺𝒖𝒎𝒎𝒂𝒓𝒚:
𝐶𝑒𝑚𝑒𝑛𝑡 = 88 𝑏𝑎𝑔𝑠 𝑹𝒆𝒂𝒓 𝑷𝒂𝒓𝒕 𝒐𝒇 𝒕𝒉𝒆 𝑾𝒂𝒍𝒍
𝑆𝑎𝑛𝑑 = 5.00𝑚3
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑊𝑎𝑙𝑙 = 11.107𝑚
𝐺𝑟𝑎𝑣𝑒𝑙 = 10.0𝑚3
𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑊𝑎𝑙𝑙 = 3.30𝑚
𝑅𝑆𝐵 = 151𝑝𝑐𝑠. .10𝑚𝑚∅ × 6𝑚
𝐴𝑟𝑒𝑎 = 11.107𝑚 × 3.30𝑚
𝑇𝑖𝑒 𝑤𝑖𝑟𝑒 = 1.50 𝑘𝑔𝑠. #18 𝐺. 𝐼. 𝑊𝑖𝑟𝑒
𝐴𝑟𝑒𝑎 = 36.65𝑚2
𝑫𝒆𝒅𝒖𝒄𝒕𝒊𝒐𝒏𝒔
𝑊𝑖𝑛𝑑𝑜𝑤 (2) = 3(0,60𝑚 × 1.00𝑚) = 1.8𝑚2
5. walls: 𝑊𝑖𝑛𝑑𝑜𝑤 (3) = 3(0.50𝑚 × 0.40𝑚) = 0.6𝑚2
𝐷𝑜𝑜𝑟2 = 3(0.80𝑚 × 2.1𝑚) = 5.04𝑚2
GROUND FLOOR 𝑇𝑜𝑡𝑎𝑙 𝐷𝑒𝑑𝑢𝑐𝑡𝑖𝑜𝑛𝑠 = 7.44𝑚2
𝑇𝑜𝑡𝑎𝑙 𝐴𝑟𝑒𝑎 𝐶𝑜𝑣𝑒𝑟𝑒𝑑 = 36.65𝑚2 − 7.44𝑚2
𝑁𝑜. 𝑜𝑓 6" 𝐶𝐻𝐵 = 29.21𝑚2 × 12.5 = 366𝑝𝑐𝑠.
Exterior Walls
𝑭𝒓𝒐𝒏𝒕 𝑷𝒂𝒓𝒕 𝒐𝒇 𝒕𝒉𝒆 𝑾𝒂𝒍𝒍 𝑹𝒆𝒂𝒓 𝑷𝒂𝒓𝒕 𝒐𝒇 𝒕𝒉𝒆 𝑾𝒂𝒍𝒍 Fence
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑊𝑎𝑙𝑙 = 14.705𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝐹𝑒𝑛𝑐𝑒 = 13.577𝑚
𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝐹𝑒𝑛𝑐𝑒 = 1.50𝑚
𝐴𝑟𝑒𝑎 = (13.577𝑚 × 1.50𝑚)
𝐴𝑟𝑒𝑎 = 20.37𝑚2 2ND FLOOR
𝑁𝑜. 𝑜𝑓 6" 𝐶𝐻𝐵 = 20.37𝑚2 × 12.5 = 255𝑝𝑐𝑠.
Exterior Walls
Interior Walls
𝑭𝒓𝒐𝒏𝒕 𝑷𝒂𝒓𝒕 𝒐𝒇 𝒕𝒉𝒆 𝑾𝒂𝒍𝒍
1st Floor 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑊𝑎𝑙𝑙 = 14.705𝑚
𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑊𝑎𝑙𝑙 = 3.6𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑊𝑎𝑙𝑙 = 29.9𝑚 𝐴𝑟𝑒𝑎 = 14.705𝑚 × 3.60𝑚
𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑊𝑎𝑙𝑙 = 3.3𝑚 𝐴𝑟𝑒𝑎 = 52.94𝑚2
𝐴𝑟𝑒𝑎 = 29.9𝑚 × 3.3𝑚
𝐴𝑟𝑒𝑎 = 98.67𝑚2 𝑫𝒆𝒅𝒖𝒄𝒕𝒊𝒐𝒏𝒔
𝑊𝑖𝑛𝑑𝑜𝑤 (1) = 3(1.20𝑚 × 1.2𝑚) = 4.32𝑚2
𝑫𝒆𝒅𝒖𝒄𝒕𝒊𝒐𝒏𝒔 𝐷𝑜𝑜𝑟1 = 3(.90𝑚 × 2.1𝑚) = 5.67𝑚2
𝐷𝑜𝑜𝑟3 = 3(0.60𝑚 × 2.1𝑚) = 3.78𝑚2 Window = 3(.46m x 1.66 m) = 2.29𝑚2
𝐷𝑜𝑜𝑟2 = 3(0.80𝑚 × 2.1𝑚) = 5.04𝑚2 𝑇𝑜𝑡𝑎𝑙 𝐷𝑒𝑑𝑢𝑐𝑡𝑖𝑜𝑛𝑠 = 12.28𝑚2
𝑇𝑜𝑡𝑎𝑙 𝐷𝑒𝑑𝑢𝑐𝑡𝑖𝑜𝑛𝑠 = 8.82𝑚2 𝑇𝑜𝑡𝑎𝑙 𝐴𝑟𝑒𝑎 𝐶𝑜𝑣𝑒𝑟𝑒𝑑 = 52.94𝑚2 − 12.28𝑚2
𝑇𝑜𝑡𝑎𝑙 𝐴𝑟𝑒𝑎 𝐶𝑜𝑣𝑒𝑟𝑒𝑑 = 98.67𝑚2 − 8.82𝑚2 = 40.66𝑚2
= 89.85𝑚2 𝑁𝑜. 𝑜𝑓 6" 𝐶𝐻𝐵 = 40.66𝑚2 × 12.50 = 508.25
𝑁𝑜. 𝑜𝑓 4" 𝐶𝐻𝐵 = 89.85𝑚2 × 13 = 1168.1 ≈ 1169𝑝𝑐𝑠 = 509𝑝𝑐𝑠.
𝑂𝑣𝑒𝑟𝑎𝑙𝑙 𝐴𝑟𝑒𝑎 = (36.25 + 34.49 + 43.13 + 29.21 𝑳𝒆𝒇𝒕 − 𝒔𝒊𝒅𝒆 𝑷𝒂𝒓𝒕 𝒐𝒇 𝒕𝒉𝒆 𝑾𝒂𝒍𝒍
+ 20.37 + 89.85) = 253.30𝑚2 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑊𝑎𝑙𝑙 = 10.45𝑚
𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑊𝑎𝑙𝑙 = 3.60𝑚
𝐶𝑒𝑚𝑒𝑛𝑡 𝐵𝑒𝑑𝑑𝑖𝑛𝑔 = 253.30 × 0.19 = 48.12 𝐴𝑟𝑒𝑎 = 10.45𝑚 × 3.60𝑚
≈ 49 𝑏𝑎𝑔𝑠
𝐴𝑟𝑒𝑎 = 37.62𝑚2
𝐶𝑒𝑚𝑒𝑛𝑡 𝐹𝑖𝑙𝑙𝑒𝑟 = 253.30 × 0.312 = 79.1 ≈ 80 𝑏𝑎𝑔𝑠
𝑇𝑜𝑡𝑎𝑙 𝐴𝑟𝑒𝑎 𝐶𝑜𝑣𝑒𝑟𝑒𝑑 = 37.62𝑚2
𝐶𝑒𝑚𝑒𝑛𝑡 𝑃𝑙𝑎𝑠𝑡𝑒𝑟𝑖𝑛𝑔 = 253.30 × 0.44 = 111.45
𝑁𝑜. 𝑜𝑓 6" 𝐶𝐻𝐵 = 37.62𝑚2 × 12.50 = 470.25
≈ 112𝑏𝑎𝑔𝑠
≈ 471𝑝𝑐𝑠.
Volume for ground floor Beam Volume for ground floor Beam
𝑉 =𝑙×𝐴 𝑉 =𝑙×𝐴
𝑉 = 3.293𝑚 × 0.09𝑚2 𝑉 = 4𝑚 × 0.09𝑚2
3
𝑉 = 0.30𝑚 𝑉 = 0.36𝑚3
𝑹𝑺𝑩 𝑹𝑺𝑩
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (4 − 12𝑚𝑚∅ × 6𝑚) 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (4 − 12𝑚𝑚∅ × 6𝑚)
𝐿𝑒𝑛𝑔𝑡ℎ = 3.293𝑚 ≈ 3293𝑚𝑚 𝐿𝑒𝑛𝑔𝑡ℎ = 4𝑚 ≈ 4000𝑚𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3.293𝑚 + 0.30𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 4.0𝑚 + 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3.593𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 4.3𝑚
Volume for ground floor Beam Volume for ground floor Beam
𝑉 =𝑙×𝐴 𝑉 =𝑙×𝐴
𝑉 = 3.9𝑚 × 0.09𝑚2 𝑉 = 2.42𝑚 × 0.09𝑚2
𝑉 = 0.35𝑚3 𝑉 = 0.22𝑚3
𝑹𝑺𝑩 𝑹𝑺𝑩
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (8 − 12𝑚𝑚∅ × 6𝑚) 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (4 − 12𝑚𝑚∅ × 6𝑚)
𝐿𝑒𝑛𝑔𝑡ℎ = 3.9𝑚 ≈ 3900𝑚𝑚 𝐿𝑒𝑛𝑔𝑡ℎ = 2.42𝑚 ≈ 2420𝑚𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3.9𝑚 + 0.30𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 2.420𝑚 + 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 4.2𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 2.72𝑚
𝑹𝑺𝑩
2nd floor Beam-1 a
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (4 − 12𝑚𝑚∅ × 6𝑚)
𝑅𝐵1𝑎 = 1𝑝𝑐. (2.952𝑚) − 0.2𝑚
𝐿𝑒𝑛𝑔𝑡ℎ = 7.75𝑚 ≈ 7750𝑚𝑚
𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 2.752𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 7750𝑚 + 0.30𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.30𝑚 × 0.40𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 8750𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.12𝑚2
𝑹𝑺𝑩 𝑹𝑺𝑩
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (9 − 16𝑚𝑚∅ × 6𝑚) 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (9 − 16𝑚𝑚∅ × 6𝑚)
𝐿𝑒𝑛𝑔𝑡ℎ = 1.65𝑚 ≈ 1.65𝑚𝑚 𝐿𝑒𝑛𝑔𝑡ℎ = 2.35𝑚 ≈ 2.35𝑚𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 1.65𝑚 + 0.30𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 2.35𝑚 + 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 1.95𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 2.65𝑚
𝑹𝑺𝑩 𝑹𝑺𝑩
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (9 − 16𝑚𝑚∅ × 6𝑚) 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (9 − 16𝑚𝑚∅ × 6𝑚)
𝐿𝑒𝑛𝑔𝑡ℎ = 3.15𝑚 ≈ 3150𝑚𝑚 𝐿𝑒𝑛𝑔𝑡ℎ = 1.3𝑚 ≈ 1300𝑚𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3.15𝑚 + 0.30𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 1.3𝑚 + 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 3.45𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 1.6𝑚
𝑹𝑺𝑩 𝑹𝑺𝑩
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (8 − 16𝑚𝑚∅ × 6𝑚) 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (8 − 16𝑚𝑚∅ × 6𝑚)
𝐿𝑒𝑛𝑔𝑡ℎ = 2.455𝑚 ≈ 2455𝑚𝑚 𝐿𝑒𝑛𝑔𝑡ℎ = 0.75𝑚 ≈ 750𝑚𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 2.455𝑚 + 0.30𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 0.75𝑚 + 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 2.755𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 1.05𝑚
𝐶𝑒𝑚𝑒𝑛𝑡 = (0.378𝑚3 × 9.00) = 3.402 𝑏𝑎𝑔𝑠 𝐶𝑒𝑚𝑒𝑛𝑡 = 7(0.376𝑚3 × 9.00) = 23.688 𝑏𝑎𝑔𝑠
𝑆𝑎𝑛𝑑 = (0.378𝑚3 × 0.50) = 0.189𝑚3 𝑆𝑎𝑛𝑑 = 7(0.376𝑚3 × 0.50) = 1.316𝑚3
𝐺𝑟𝑎𝑣𝑒𝑙 = (0.378𝑚3 × 1.00) = 0.378𝑚3 𝐺𝑟𝑎𝑣𝑒𝑙 = 7(0.376𝑚3 × 1.00) = 2.632𝑚3
𝑹𝑺𝑩 𝑹𝑺𝑩
𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (8 − 16𝑚𝑚∅ × 6𝑚) 𝑀𝑎𝑖𝑛 𝐵𝑎𝑟𝑠 − (8 − 16𝑚𝑚∅ × 6𝑚)
𝐿𝑒𝑛𝑔𝑡ℎ = 7.552𝑚 ≈ 7552𝑚𝑚 𝐿𝑒𝑛𝑔𝑡ℎ = 7.55𝑚 ≈ 7550𝑚𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 7.552𝑚 + 0.30𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 7.55𝑚 + 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 7.852𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝑆𝐵 = 7.85𝑚
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 175 × 4 = 700 𝑡𝑖𝑒𝑠
𝑁𝑜. 𝑜𝑓 𝑇𝑖𝑒𝑠 = 25 × 4 = 100 𝑡𝑖𝑒𝑠
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.30𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 100 × 0.30𝑚 = 210𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 100 × 0.30𝑚 = 30𝑚
1𝑘𝑔
1𝑘𝑔 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 210𝑚 = 3.96
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 30𝑚 = 0.57 53𝑚
53𝑚 ≈ 4 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸
3
≈ 0.75 𝑜𝑟 𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸
4
𝑺𝒖𝒎𝒎𝒂𝒓𝒚:
ROOF Beam 2 𝐶𝑒𝑚𝑒𝑛𝑡 = (3.402 + 23.688) = 27.09 ≈ 59𝑏𝑎𝑔𝑠
𝑆𝑎𝑛𝑑 = (0.189 + 1.316) = 1.505 ≈ 3.6𝑚3
𝑅𝐵1 = (7.75𝑚) − 0.2𝑚
𝐺𝑟𝑎𝑣𝑒𝑙 = (0.378 + 2.632) = 3.01 ≈ 3.10𝑚3
𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑅𝐵1𝐶 = 7.55𝑚 𝑅𝑆𝐵
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.20𝑚 × 0.25𝑚 (4 + 28) = 32 𝑝𝑐𝑠. 12𝑚𝑚∅ × 6𝑚
𝐴𝑟𝑒𝑎 𝑜𝑓 𝐿𝑎𝑡𝑒𝑟𝑎𝑙 𝑇𝑖𝑒𝑠 = 0.05𝑚2 (17 + 119)2 = 136𝑝𝑐𝑠. 10𝑚𝑚∅ × 6𝑚
1𝑘𝑔
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 29.40𝑚 = 0.490
𝑇𝑖𝑒 𝑤𝑖𝑟𝑒 = (0.75 + 4) = 4.75 𝑘𝑔 60𝑚
3 1
≈ 4 𝑘𝑔. #16 𝐺. 𝐼. 𝑊𝑖𝑟𝑒 ≈ 0.5 𝑜𝑟 𝑘𝑔. #18 𝐺. 𝐼 𝑊𝐼𝑅𝐸
4 2
Volume of Fill
𝑉 =𝑑×𝐴
Volume for Flooring
𝑉 = 0.175𝑚 × 26.385𝑚2
𝑉 = 4.62𝑚3 𝑉 =𝑡×𝐴
𝑉 = 0.125𝑚 × 31𝑚2
𝑉 = 3.875𝑚3
Volume for Flooring Total Volume = 5.425 +3.3875
= 9.3 cu. m
𝑉 =𝑡×𝐴
𝑉 = 0.125𝑚 × 26.385𝑚2 𝐶𝑒𝑚𝑒𝑛𝑡 = 9.3𝑚3 × 9.00 = 83.7𝑏𝑎𝑔𝑠 𝑠𝑎𝑦 84 𝑏𝑎𝑔𝑠
𝑉 = 3.30𝑚3 𝑆𝑎𝑛𝑑 = 9.3𝑚3 × 0.50 = 4.65𝑚3
Total Volume = 4.62 +3.3 𝐺𝑟𝑎𝑣𝑒𝑙 = 9.3𝑚3 × 1.00 = 9.3𝑚3
= 7.92 cu. m
𝑹𝑺𝑩
𝐶𝑒𝑚𝑒𝑛𝑡 = 7.92𝑚3 × 9.00 = 71.28𝑏𝑎𝑔𝑠 𝑠𝑎𝑦 72 𝑏𝑎𝑔𝑠 𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
𝑆𝑎𝑛𝑑 = 7.92𝑚3 × 0.50 = 3.96𝑚3 1𝑝𝑐
𝐺𝑟𝑎𝑣𝑒𝑙 = 7.92𝑚3 × 1.00 = 7.92𝑚3 𝑁 = 31𝑚 × = 46.27 ≈ 47𝑝𝑐𝑠.
0.6𝑚
𝑈𝑠𝑖𝑛𝑔 (12𝑚𝑚∅ × 6𝑚)
𝑹𝑺𝑩 1𝑝𝑐
𝑁 = 31𝑚 × = 46.27 ≈ 47𝑝𝑐𝑠.
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 0.6𝑚
1𝑝𝑐
𝑁 = 26.385𝑚 × = 39.38 ≈ 40𝑝𝑐𝑠. 𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
0.67𝑚
𝑈𝑠𝑖𝑛𝑔 (12𝑚𝑚∅ × 6𝑚) 4 7.75
𝑁𝑇𝑊 = [ ]×[ ] = 86.11 ≈ 87𝑝𝑐𝑠.
1𝑝𝑐 0.60 0.60
𝑁 = 26.385𝑚 × = 39.38 ≈ 40𝑝𝑐𝑠 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚
0.67𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 87 × 0.20𝑚 = 17.4𝑚
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆 1𝑘𝑔
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 17.40𝑚 = 0.290
6.801 7.75 60𝑚
𝑁𝑇𝑊 = [ ]×[ ] = 146.41 ≈ 147𝑝𝑐𝑠. 1
0.60 0.60 ≈ 0.50 𝑜𝑟 𝑘𝑔. #18 𝐺. 𝐼 𝑊𝐼𝑅𝐸
2
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 147 × 0.20𝑚29.4𝑚
𝐴𝑟𝑒𝑎3 = 3.90𝑚 × 7.75𝑚
𝐴𝑟𝑒𝑎3 = 30.2250𝑚2
Volume of Fill 𝑉 = 0.125𝑚 × 18.755𝑚2
𝑉 =𝑑×𝐴 𝑉 = 2.344𝑚3
𝑉 = 0.175𝑚 × 30.225𝑚2 Total Volume = 3.28 +2.344
𝑉 = 5.29𝑚3 = 5.624 cu. m
Volume of Fill
𝑉 =𝑑×𝐴
2nd floor: 𝑉 = 0.175𝑚 × 31𝑚2
1
𝐴𝑟𝑒𝑎1 = (2.952 + 3.857)(3.35 + 4.4) 𝑉 = 5.425𝑚3
2
𝐴𝑟𝑒𝑎1 = 26.385𝑚2
Volume for Flooring
Volume of Fill
𝑉 =𝑑×𝐴 𝑉 =𝑡×𝐴
𝑉 = 0.175𝑚 × 26.385𝑚 2 𝑉 = 0.125𝑚 × 31𝑚2
𝑉 = 4.62𝑚3 𝑉 = 3.875𝑚3
Total Volume = 5.425 +3.3875
= 9.3 cu. m
Volume for Flooring
𝐶𝑒𝑚𝑒𝑛𝑡 = 9.3𝑚3 × 9.00 = 83.7𝑏𝑎𝑔𝑠 𝑠𝑎𝑦 84 𝑏𝑎𝑔𝑠
𝑉 =𝑡×𝐴
𝑆𝑎𝑛𝑑 = 9.3𝑚3 × 0.50 = 4.65𝑚3
𝑉 = 0.125𝑚 × 26.385𝑚2
𝐺𝑟𝑎𝑣𝑒𝑙 = 9.3𝑚3 × 1.00 = 9.3𝑚3
𝑉 = 3.30𝑚3
Total Volume = 4.62 +3.3
𝑹𝑺𝑩
= 7.92 cu. m
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
1𝑝𝑐
𝐶𝑒𝑚𝑒𝑛𝑡 = 7.92𝑚3 × 9.00 = 71.28𝑏𝑎𝑔𝑠 𝑠𝑎𝑦 72 𝑏𝑎𝑔𝑠 𝑁 = 31𝑚 × = 46.27 ≈ 47𝑝𝑐𝑠.
0.6𝑚
𝑆𝑎𝑛𝑑 = 7.92𝑚3 × 0.50 = 3.96𝑚3 𝑈𝑠𝑖𝑛𝑔 (12𝑚𝑚∅ × 6𝑚)
𝐺𝑟𝑎𝑣𝑒𝑙 = 7.92𝑚3 × 1.00 = 7.92𝑚3 1𝑝𝑐
𝑁 = 31𝑚 × = 46.27 ≈ 47𝑝𝑐𝑠.
0.6𝑚
𝑹𝑺𝑩
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
4 7.75
𝑁𝑇𝑊 = [ ]×[ ] = 86.11 ≈ 87𝑝𝑐𝑠.
0.60 0.60 𝐴𝑟𝑒𝑎4 = 2.420𝑚 × 7.75𝑚
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚 𝐴𝑟𝑒𝑎4 = 18.755𝑚2
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 87 × 0.20𝑚 = 17.4𝑚
1𝑘𝑔
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 17.40𝑚
60𝑚
= 0.290 Volume of Fill
1 𝑉 =𝑑×𝐴
≈ 0.50 𝑜𝑟 𝑘𝑔. #18 𝐺. 𝐼 𝑊𝐼𝑅𝐸
2 𝑉 = 0.175𝑚 × 18.755𝑚2
𝑉 = 3.28𝑚3
𝐴𝑟𝑒𝑎3 = 3.90𝑚 × 7.75𝑚
Volume for Flooring
𝐴𝑟𝑒𝑎3 = 30.2250𝑚2
𝑉 =𝑡×𝐴
Volume of Fill
𝑉 = 0.125𝑚 × 18.755𝑚2
𝑉 =𝑑×𝐴 𝑉 = 2.344𝑚3
2
𝑉 = 0.175𝑚 × 30.225𝑚 Total Volume = 3.28 +2.344
𝑉 = 5.29𝑚3
= 5.624 cu. m
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆
𝑹𝑺𝑩 2.42 7.75
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 𝑁𝑇𝑊 = [ ]×[ ] = 52.1 ≈ 53𝑝𝑐𝑠.
0.60 0.60
1𝑝𝑐 𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚
𝑁 = 30.225𝑚 × = 45.11 ≈ 46𝑝𝑐𝑠.
0.67𝑚 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 53 × 0.20𝑚 = 10.6𝑚
𝑈𝑠𝑖𝑛𝑔 (12𝑚𝑚∅ × 6𝑚) 1𝑘𝑔
1𝑝𝑐 𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 10.6𝑚 = 0.1760
𝑁 = 30.225𝑚 × = 45.11 ≈ 46𝑝𝑐𝑠. 60𝑚
0.67𝑚 1
≈ 0.25 𝑜𝑟 𝑘𝑔. #18 𝐺. 𝐼 𝑊𝐼𝑅𝐸
4
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆 𝑺𝒖𝒎𝒎𝒂𝒓𝒚:
3.9 7.75 𝐶𝑒𝑚𝑒𝑛𝑡 = 229𝑏𝑎𝑔𝑠
𝑁𝑇𝑊 = [ ]×[ ] = 83.96 ≈ 84𝑝𝑐𝑠. 𝑆𝑎𝑛𝑑 = 15.956 ≈ 16.00𝑚3
0.60 0.60
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚 𝐺𝑟𝑎𝑣𝑒𝑙 = 31.912 ≈ 32.00𝑚3
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 84 × 0.20𝑚 = 16.8𝑚 𝑅𝑆𝐵
1𝑘𝑔 = 161𝑝𝑐𝑠. 10𝑚𝑚∅ × 6𝑚
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 16.80𝑚 = 0.280 = 161𝑝𝑐𝑠. 10𝑚𝑚∅ × 6𝑚
60𝑚
1 3
≈ 0.50 𝑜𝑟 𝑘𝑔. #18 𝐺. 𝐼 𝑊𝐼𝑅𝐸 𝑇𝑖𝑒 𝑤𝑖𝑟𝑒 = 1.75𝑘𝑔 ≈ 1 𝑘𝑔. #18 𝐺. 𝐼. 𝑊𝑖𝑟𝑒
2 4
Volume of Excavation
Volume of Fill
𝑉 =𝑙×𝑤×ℎ
𝑉 =𝑑×𝐴
𝑉 = 0.2𝑚 × 0.70𝑚 × .80𝑚
𝑉 = 0.175𝑚 × 18.755𝑚2
𝑉 = 0.112𝑚3
𝑉 = 3.28𝑚3
𝑺𝒕𝒂𝒊𝒓𝒄𝒂𝒔𝒆 𝑫𝒊𝒎𝒆𝒏𝒔𝒊𝒐𝒏
Volume for Flooring 𝑊𝑖𝑑𝑡ℎ = 0.18𝑚
𝐿𝑒𝑛𝑔𝑡ℎ = 0.30𝑚
𝑉 =𝑡×𝐴 𝑇ℎ𝑖𝑐𝑘𝑛𝑒𝑠𝑠 = 0.125𝑚
𝑉 = 0.125𝑚 × 18.755𝑚2
𝑉 = 2.344𝑚3
Total Volume = 3.28 +2.344
= 5.624 cu. m Volume of Staircase
𝑹𝑺𝑩 𝑺𝒖𝒎𝒎𝒂𝒓𝒚:
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚) 𝑇𝑜𝑡𝑎𝑙 𝑉𝑜𝑙𝑢𝑚𝑒 𝑜𝑓 𝐶𝑢𝑡 = 0.062𝑚3
1𝑝𝑐 𝐶𝑒𝑚𝑒𝑛𝑡 = (1.39 + 1.73) = 3.12 ≈ 4 𝑏𝑎𝑔𝑠
𝑁 = 0.80𝑚2 × = 1.19 ≈ 2𝑝𝑐𝑠.
0.67𝑚2 𝑆𝑎𝑛𝑑 = (0.08 + 0.10) = 0.18 ≈ 0.50𝑚3
𝐺𝑟𝑎𝑣𝑒𝑙 = (0.14 + 0.192) = 0.33 ≈ 0.50𝑚3
𝑻𝒊𝒆 𝑾𝒊𝒓𝒆 𝑅𝑆𝐵
1.00 0.80 (1 + 2) = 3𝑝𝑐𝑠. 10𝑚𝑚∅ × 6𝑚
𝑁𝑇𝑊 = [ ]×[ ] = 2.22 ≈ 3𝑝𝑐𝑠.
0.60 0.60 𝑇𝑖𝑒 𝑤𝑖𝑟𝑒 = (0.2 + 0.2) = 0.40
𝐿𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑖𝑒 = 0.20𝑚 1
≈ 50 𝑜𝑟 𝑘𝑔. #18 𝐺. 𝐼. 𝑊𝑖𝑟𝑒
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 3 × 0.20𝑚 = 0.60 ≈ 1𝑚 2
1𝑘𝑔
𝑁𝑜. 𝑜𝑓 𝑘𝑔𝑠. = 1𝑚 = 0.02𝑘𝑔. #16 𝐺. 𝐼 𝑊𝐼𝑅𝐸
53𝑚
Volume of Excavation
𝑉 =𝑙×𝑤×ℎ
𝑉 = 0.40𝑚 × 0.80𝑚 × 0.80𝑚
𝑉 = 0.23𝑚3
𝑺𝒕𝒂𝒊𝒓𝒄𝒂𝒔𝒆 𝑫𝒊𝒎𝒆𝒏𝒔𝒊𝒐𝒏
𝑊𝑖𝑑𝑡ℎ = 0.80𝑚
𝐿𝑒𝑛𝑔𝑡ℎ = 0.80𝑚
𝑇ℎ𝑖𝑐𝑘𝑛𝑒𝑠𝑠 = 0.24𝑚
Volume of Staircase
𝑉 =𝑙×𝑤×𝑡
𝑉 = 0.80𝑚 × 0.80𝑚 × 0.24𝑚
𝑉 = 0.154𝑚3
𝑹𝑺𝑩
𝑈𝑠𝑖𝑛𝑔 (10𝑚𝑚∅ × 6𝑚)
1𝑝𝑐
𝑁 = 0.64𝑚2 × = 0.96 ≈ 1𝑝𝑐.
0.67𝑚2