STEP FOUR
ITS Global Leader, The Seoul TOPIS
Seoul’s Challenges & Achievements
in Sustainable Urban Transport
01 STEP ONE
Introduction
Seoul Condition & Transport Infra Seoul’s Challenges & Achievements
in Sustainable Urban Transport Introduction
Russia
Seoul
Canada
Republic of Korea
Mongol
USA
China
Japan
27%
Rate of Seoul’s
Taiwan Population
India In Korea
605㎢
Malaysia
>>
10.3mil. 3.1mil. 327.1km 9,334
(Capital region 25mil) (Capital region
(9 lines) (629 route)
72,109
4.7mil)
Transport Condition Seoul’s Challenges & Achievements
in Sustainable Urban Transport Introduction
Dramatic Increasing
Of Traffic Congestion
Rapidly Increasing
of Pop.
Housing Site
Development
Modal Share. Seoul’s Challenges & Achievements
in Sustainable Urban Transport Introduction
22.9%
65.9%
6.8% + B
4.4%
32.5mil.
Shift in Travel Speed & Traffic Congestion Cost
Congestion Cost
76.5bil.
Seoul’s Challenges & Achievements
History and Change of Seoul Transport in Sustainable Urban Transport Introduction
Supply-oriented Transport
+
The Great Public Transportation
Service & Strengthening TDM
New Vision
Eco-friendly, Human-Oriented
Transportation
Upgrade of Transportation
System based on ITS
Depended on Vehicle-oriented Sharing of Car & Parking lot
Fossil Fuels City
Subway Service Seoul’s Challenges & Achievements
in Sustainable Urban Transport Introduction
Convenient high-pressure
Facilities watering carts
LRT Construction
(96.7km, 9 lines)
Under Construction
Under Line 9, 12.9km
Construction Planning
Planning
19.5km 96.7km Line 4, Line 5, Line 8
Bus Service Seoul’s Challenges & Achievements
in Sustainable Urban Transport Introduction
Limitations Problems
Supply Demand Bus Route
- Urban & Sub-urban development Complicated, Centralized
- Increasing of Traffic Demand in Particular Lines
- Traffic Congestion Cost Increase
Company
Road Construction
- Developed Area
Vicious Small Size, Low Willingness
to Invest
- High Construction Cost circle
($50~80milloon / km)
Operation
Subway Construction Slow, Not on time
- Long Construction Time
(10~20years) Drivers & Passenger
- High Construction Cost - Poor Welfare, Unfriendly
($100~110milloon / km) - Uncomfortable
Public Transportation
What should we do Not a Choice But a Must
Reform
Changes in policy
PTR – Public Transportation Reform : Strategies & Action Plan Seoul’s Challenges & Achievements
in Sustainable Urban Transport framework, setting
a new target
4 Social consensus
4-1. Citizens’ Committee
Monitoring
&
3 Assistant system Adjustment
3-1. Integrated Fare system (Subway + Bus)
3-2. Introduction of high-quality buses
2 Infrastructure
2-1. Expansion of BRT
2-2. Improvements in transportation centers
2-3. Introduction of high-quality buses
1 Bus routing/operating Customer
1-1. Public ownership, Private operation Satisfaction
1-2. Establishment of trunk and feeder lines
1-3. Scientific operation management(BMS)
Changes in policy
PTR – Public Transportation Reform : Semi-public transportation system Seoul’s Challenges & Achievements
in Sustainable Urban Transport framework, setting
a new target
1) Operational plan
Financial support Request for
2) Infrastructure Construction Route planning financial support
Transportation card
Bus company
settlement company Operation
Information
Bus Company
Distribution of
operation profits
Inter-regional Lines
Trunk Lines
Feeder Lines
Circular Lines
Changes in policy
PTR – Smart Card(T-Money) & Transfer System Seoul’s Challenges & Achievements
in Sustainable Urban Transport framework, setting
a new target
Integrated distance
Free transfer bus-bus, bus-subway in Capital Region, based fare system
Anywhere
Express way Any Modal Taxi 100% 99% 59.2%
City Bus Subway
Card Usage Rate(’15)
Changes in policy
PTR – Bus Rapid Transit(BRT) Seoul’s Challenges & Achievements
in Sustainable Urban Transport framework, setting
a new target
Before
In CBD & suburban CBD
Yeouido
Guro-digital
station
TOPIS 1.0
2004 : Open TOPIS, Install Smart Cart System
2005 : Unmanned Surveillance System
1998 2004
“The First” introduction of ITS
1998 : Implementation in Nam-San area(10.6km)
2000 : Advanced traffic management
system in urban expressway
Efforts of Seoul for
History of Seoul TOPIS 1 Seoul’s Challenges & Achievements
in Sustainable Urban Transport sustainable urban
transport
TOPIS 3.0
2013 : Open integrated control center
2014 : Release of TOPIS Platform (ITS Solution)
2008 2013
TOPIS 2.0
2008 : Install Bus Information Terminals (BIT)
2009 : Mobile Service
2010 : Open traffic & bus information data
2011 : Introduction of standard design(VMS, VDS)
Efforts of Seoul for
Present of Seoul TOPIS 1 Seoul’s Challenges & Achievements
in Sustainable Urban Transport sustainable urban
transport
VDS
1,268 km
Length of roads 35,000Vehicles
Volume Speed
Incident
for travel speed data Probe car collecting GPS
collection data 1,181detectors
CCTV 13systems
832 VMS 3600cotrollers 33systems Ramp
Metering
24 hour Traffic suvilence &
mornitering 326 Real time traffic signal
controller
Lane Control System
(LCS)
System
(RMS)
Efforts of Seoul for
Present of Seoul TOPIS 2 Seoul’s Challenges & Achievements
in Sustainable Urban Transport sustainable urban
transport
44%
of all bus stops
85mil./day
24mil./day 192km 1,600 Persons/year
The Number of open data The number of transportation Only Traffic
(traffic & bus information) Card Data communications network Foreign visitor to TOPIS
Efforts of Seoul for
Present of Seoul TOPIS 3 Seoul’s Challenges & Achievements
in Sustainable Urban Transport sustainable urban
transport
16.4mil. dollars/year
4 teams
32 persons 150 persons
Maintenance
Maintenance Cost Organization of TOPIS Information
personnel
media
Control
Tower
Determination and
Immediate response
Citizen Reports
Data Operator
Control Control
Integration Monitoring
& Operating & Operating Control all devices &
& analysis
Information provision
VDS/CCTV/AVI Incident & Traffic Signal Transportation VMS/Traffic
Bus OBE/Taxi GPS Disaster Information Card Data
Signal/Web/
Mobile/SNS/LCS/
Police agency Broadcasting
Meteorological Admin
Main System of Seoul TOPIS : BMS & BIS 1 Seoul’s Challenges & Achievements
in Sustainable Urban Transport
ITS Global Leader,
The Seoul TOPIS
All Data
Incident
Seoul TOPIS
1) All Bus & Subway arrival time Bus Policy 1) Result of bus operation
2) Last bus & Subway information Division (not-stop, reckless driving )
3) All Bus & Subway route, transfer service 2) Basic data for operation cost calculation
4) Bus detour & congestion information (total travel distance, frequency of bus running)
Bus driver
5) Incident information
Seoul TOPIS
Main System of Seoul TOPIS : Unmanned Regulation System 1 Seoul’s Challenges & Achievements
in Sustainable Urban Transport
ITS Global Leader,
The Seoul TOPIS
Post office
Automatic vehicle owner search Charging penalty and sending the mail to Automatic mail sending
post office
Take 2-3 days to deliver the fine bill to vehicle owner (Non automatic system: 10~15 days)
Main System of Seoul TOPIS : ATMS(Advanced Traffic Management System) Seoul’s Challenges & Achievements
in Sustainable Urban Transport
ITS Global Leader,
The Seoul TOPIS
Card data
Data analysis
85 mil./day
(bus+subway+taxi)
26 mil./day
“bus, subway, taxi”
Visualizing
Location, GIS data
Traffic speed & volume
Evaluation
Evaluation of service
ofbus
bus stop level
congestion
Planning
Evaluation of of new bus
route route
duplication
Socioeconomic (bus route & stop)
index
The changing trend of Big data progress
Population, vehicle,
lane use, etc Planning of running interval, etc
Main System of Seoul TOPIS : Traffic forecasting System Seoul’s Challenges & Achievements
in Sustainable Urban Transport
ITS Global Leader,
The Seoul TOPIS
Incident
5. Hardware free
Global standard connecting
interface & protocol to equipment
Seoul TOPIS Platform : Framework
Seoul’s Challenges & Achievements
in Sustainable Urban Transport Introduction
Center
Platform
Bus
Platform
Big data
Platform
FTMS
Platform
… ATMS
Platform
Seoul TOPIS Platform : Feature & Function 1
Seoul’s Challenges & Achievements
in Sustainable Urban Transport Introduction
Operation monitoring of
Congestion area & road all hardware & device
Change of speed & volume Monitoring of program process
1. Open Source
Free modification & improvement
4. High Technology
ITS Operating such as Seoul TOPIS
Seoul TOPIS Platform : Advantage & Strength 2
Seoul’s Challenges & Achievements
in Sustainable Urban Transport Introduction
&
2) Policy development for various
areas including ITS,
BRT, Parking, TSM, Public
operation know-how Transport Operations, etc.
We are ready to help you
Contact anytime If you need