14.10.2019
Submitted to the CEO for Approval

Through: The Principal

Respected Madam,

Sub: Submission of Laboratory Non consumables requirements as per R 2017.


As Anna University has amended new Regulations R 2017 for UG, New equipments has to be purchased
as per R 2017. Herewith we are submitting the Laboratory requirements (non Consumables) required to ensure
smooth conduct of Laboratory classes. The requirements are categorized for both semesters.

SEMESTER V
MT 8511 POWER ELECTRONICS LABORATORY

S. DESCRIPTION OF QUANTITY DEFICIENCY COST PER TOTAL


No EQUIPMENT REQUIRED UNIT AMOUNT
1 Ammeter (0-5A) MC,
(0-2A) MC, (0-2A) MI, 15 15 700 10500
(0-5V) MI
2 Voltmeter (0-300V)
MC, (0-600V) MC, (0- 16
16 700 11200
300V) MI, (0-
600V) MI
TOTAL 21700

MT8512-SENSORS AND INSTRUMENTATION LABORATORY

S. DESCRIPTION OF QUANTITY DEFICIENCY COST PER TOTAL


No EQUIPMENT REQUIRED UNIT AMOUNT
1 Digital signal 6 6 34000 204000
oscilloscope
2 Load cell setup 1 1 11000 11000
3 4 channel DAQ system 1 1 36000 36000
for strain gauge
4 Sound level meter 1 1 1822 1822
5 Prony brake 1 1 13000 13000
dynamometer
6 hygrometer 1 1 1200 1200
TOTAL 267022

SEMESTER VI
MT8611-APPLIED HYDRAULICS AND PNEUMATICS LAB

S. DESCRIPTION OF QUANTITY DEFICIENCY COST PER TOTAL


No EQUIPMENT REQUIRED UNIT AMOUNT
1 Pressure relief valve 4 4 850 3400
2 Pressure reducing valve 2 2 3200 6400
3 Flow control valves 2 2 1520 3040
4 Pressure switch 1 1 1758 1758
5 Rotory actuator 1 1 1050 1050
6 Hydraulics power pack 1 1 120000 120000
with pumps and
pressure relief valve
7 LABVIEW software 1 1 100000 100000
8 Automation studio 1 1 40000 40000
software
TOTAL 275648

MT8612-INDUSTRIAL AUTOMATION LAB

S. DESCRIPTION OF QUANTITY DEFICIENCY COST PER TOTAL


No EQUIPMENT REQUIRED UNIT AMOUNT
1 a)Mitsubishi PLC Nexgenie
Trainer kit 5 5 35000 175000

2 b)Delta PLC Trainer kit


5 5 55000 275000
3 c)Siemens PLC trainer kit
4 4 86500 346000
4 Process control station 1 1 180000 180000
5 ½ HP AC motor 1 1 25000 25000
6 VFD to control ½ HP 1 1 64000 64000
AC motor
TOTAL 1065000

SEMESTER VII

MT8781-ROBOTICS LABORATORY

DESCRIPTION OF QUANTITY DEFICIENCY COST PER TOTAL


S. EQUIPMENT REQUIRED UNIT AMOUNT
No
1 ROS ( Robotic Operating
30 20 10000 200000
System)
2 Verification of direct
kinematics equations and
inverse kinematics 1 1 110000 110000
equations of 1DOF “R
configuration” robot
3 Verification of direct
kinematics equations and
inverse kinematics 1 1 110000 110000
equations of 2DOF “R-
configuration” robot.
TOTAL 420000
Consolidated:

Lab requirements

1. Power electronics laboratory : Rs.21,700

2. Sensors and instrumentation laboratory : Rs.2,67,022

3. Applied hydraulics and pneumatics lab : Rs.2,75,648

4. Industrial automation lab : Rs.10,65,000

5. Robotics laboratory : Rs.4,20,000

The estimated budget for non consumable requirements by considering the revised regulations of Anna University,
R2017 is herewith submitted. We seek your kind direction and order in this regard.