0 оценок0% нашли этот документ полезным (0 голосов)
155 просмотров1 страница
The document is an evaluation checklist from the Buildings and Architecture Office of the City Government of Baguio for electrical and electronics plans. It contains checklists to ensure compliance with building permit requirements for electrical and electronics installations based on PD 1096. The checklist includes requirements such as having plans drawn to scale, with readable fonts and standard legends/symbols, and signatures from the design engineer, installing engineer, and building owner. Requirements specific to electrical plans include schedules of loads/equipment and design analysis, while electronics plans require general layouts, equipment specifications, and riser diagrams. Plans must be routed through and evaluated by officials using this checklist to ensure compliance with permitting regulations.
Исходное описание:
Оригинальное название
Electrical Evaluation Checklist (for building permit).docx
The document is an evaluation checklist from the Buildings and Architecture Office of the City Government of Baguio for electrical and electronics plans. It contains checklists to ensure compliance with building permit requirements for electrical and electronics installations based on PD 1096. The checklist includes requirements such as having plans drawn to scale, with readable fonts and standard legends/symbols, and signatures from the design engineer, installing engineer, and building owner. Requirements specific to electrical plans include schedules of loads/equipment and design analysis, while electronics plans require general layouts, equipment specifications, and riser diagrams. Plans must be routed through and evaluated by officials using this checklist to ensure compliance with permitting regulations.
The document is an evaluation checklist from the Buildings and Architecture Office of the City Government of Baguio for electrical and electronics plans. It contains checklists to ensure compliance with building permit requirements for electrical and electronics installations based on PD 1096. The checklist includes requirements such as having plans drawn to scale, with readable fonts and standard legends/symbols, and signatures from the design engineer, installing engineer, and building owner. Requirements specific to electrical plans include schedules of loads/equipment and design analysis, while electronics plans require general layouts, equipment specifications, and riser diagrams. Plans must be routed through and evaluated by officials using this checklist to ensure compliance with permitting regulations.
City Government of Baguio Tel.No. (074)442-2503 Fax No. (074)443-9239 Website: http//www.baguio.gov.ph ELECTRICAL: Evaluation Checklist [ ] Residential [ ] Commercial, Institutional, Industrial, Recreational Project Title: ____________________________________ Name of Evaluator: _________________________ Project Location ____________________________________ Date and Time Received: _________________________ Owner/Authorized ____________________________________ Forwarded to: _________________________ Representative: Date Time Evaluator 1st routing: 2nd routing: 3rd routing: Yes – Complied 4th routing: 5th routing: No – Not Complied Building Permit : RULE 3 SECTION 302.5 of PD 1096 Remarks Yes No On Electrical Plans and Technical Specifications [ ] [ ] Scale 1:100m [ ] [ ] Readable Fonts and Texts [ ] [ ] Standard Legends and Symbols [ ] [ ] General Notes and/or Specifications [ ] [ ] Electrical Layout (Lighting, Power and Auxiliary powers) [ ] [ ] Schedule of Loads as per standard rating, Transformers, Generating/UPS units (total KVA for each of the preceding items shall be indicated in the schedule) [ ] [ ] Electrical Design Analysis (Complete w/ short circuit calculations and voltage drop as required by DPWH Memorandum Circular No. 2 series of 2015) [ ] [ ] One line diagram, Riser Diagram w/ proper identification [ ] [ ] Signature and seal by the design Professional Electrical Engineer [ ] [ ] Signature of Engineer in-charge of installation [ ] [ ] Signature of owner to all Electrical plans [ ] [ ] Name & signature of PCAB license for 200A main & above [ ] [ ] other requirements refer to PD 1096 (specify)
ELECTRONICS: EVALUATION CHECKLIST
Project Title: ____________________________________ Name of Evaluator: _________________________ Project Location ____________________________________ Date and Time Received: _________________________ Owner/Authorized ____________________________________ Forwarded to: _________________________ Representative: Date Time Evaluator 1st routing: 2nd routing: 3rd routing: 4th routing: 5th routing:
BUILDING PERMIT: SECTION 302.6 of PD 1096 Remarks
[ ] [ ] General Layout Plans w/ Legends
[ ] [ ] Scale 1:100m [ ] [ ] Readable Fonts and Texts [ ] [ ] Riser Diagram [ ] [ ] Equipment Specifications [ ] [ ] Signature and seal by the design Professional Electronics Engineer [ ] [ ] Signature of Engineer in-charge of installation [ ] [ ] Signature of owner to all Electronic plans [ ] [ ] Standard Legend and Symbols [ ] [ ] Electronics Layout (FDAS, CCTV, CATV, Telephone) [ ] [ ] other requirements refer to PD 1096 (specify)