Вы находитесь на странице: 1из 35

Bentec GmbH Drilling Oilfield Systems

Deilmannstraße 1, D- 48455 Bad Bentheim


Germany

TECHNICAL MANUAL
ТЕХНИЧЕСКОЕ РУКОВОДСТВО
Project/Проект : DR 533

BENTEC Classification No:


Классификационный номер BENTEC:

3100
BENTEC Classification Name:
Классификационное название BENTEC:

AIR PIPING
Воздуховод

TM_3100_AIR PIPING
Project

Stationary Desert Rig 1500 HP


ENAFOR # 30-31; 49-53
DR530-536

PICTURE DOCUMENTATION
AIR PIPING SYSTEM

BENTEC GmbH Drilling & Oilfield Systems


48455 Bad Bentheim, Germany
www.bentec.com
Content
1. Air Pipeline from Air Compressor Container to Drawwork .................................................................. 3
2. Air Pipeline from Air Compressor Container to Gen-Set ...................................................................... 7
3. Air Pipeline from Air Compressor Container to Manifold Rig Floor DS ................................................ 9
3.1. Air Pipeline from Manifold Rig Floor to Manifold Substructure ................................................. 12
3.1.1. Air Pipeline from Manifold Substructure to Drill Line Spooler ........................................... 13
3.2. Air Pipeline from Manifold Rig Floor to Cabin Wiper ................................................................. 14
3.3. Air Pipeline from Manifold Rig Floor to Mast ............................................................................. 16
3.3.1. Air Pipeline from Mast to Casing Stabbing Board ............................................................... 18
3.3.2. Air Pipeline from Mast to Racking Board Winch ................................................................. 21
3.4. Air Pipeline from Manifold Rig Floor to Man Rider Winch & Drill Floor Winch DS .................... 24
3.5. Air Pipeline from Manifold Rig Floor to BOP Hoists.................................................................... 26
3.6. Air Pipeline from Manifold Rig Floor to Drill Floor Winch ODS .................................................. 28
3.7. Air Pipeline from Manifold Rig Floor to Manifold ODS Pipe Skid ............................................... 30
3.7.1. Air Pipeline from Manifold Pipe Skid ODS to Substructure Base Winch ............................ 32
3.8. Air Pipeline from Manifold Rig Floor ODS to Kelly Spinner ........................................................ 33

Legend
Air Hose
Air Piping

BENTEC GmbH Drilling & Oilfield Systems Page 2 of 34


1. Air Pipeline from Air Compressor Container to Drawwork

BENTEC GmbH Drilling & Oilfield Systems Page 3 of 34


BENTEC GmbH Drilling & Oilfield Systems Page 4 of 34
BENTEC GmbH Drilling & Oilfield Systems Page 5 of 34
BENTEC GmbH Drilling & Oilfield Systems Page 6 of 34
2. Air Pipeline from Air Compressor Container to Gen-Set

BENTEC GmbH Drilling & Oilfield Systems Page 7 of 34


BENTEC GmbH Drilling & Oilfield Systems Page 8 of 34
3. Air Pipeline from Air Compressor Container to Manifold Rig Floor DS

BENTEC GmbH Drilling & Oilfield Systems Page 9 of 34


BENTEC GmbH Drilling & Oilfield Systems Page 10 of 34
BENTEC GmbH Drilling & Oilfield Systems Page 11 of 34
3.1. Air Pipeline from Manifold Rig Floor to Manifold Substructure

Bypass

Manifold Substructure

BENTEC GmbH Drilling & Oilfield Systems Page 12 of 34


3.1.1. Air Pipeline from Manifold Substructure to Drill Line Spooler

BENTEC GmbH Drilling & Oilfield Systems Page 13 of 34


3.2. Air Pipeline from Manifold Rig Floor to Cabin Wiper

BENTEC GmbH Drilling & Oilfield Systems Page 14 of 34


BENTEC GmbH Drilling & Oilfield Systems Page 15 of 34
3.3. Air Pipeline from Manifold Rig Floor to Mast

BENTEC GmbH Drilling & Oilfield Systems Page 16 of 34


BENTEC GmbH Drilling & Oilfield Systems Page 17 of 34
3.3.1. Air Pipeline from Mast to Casing Stabbing Board

BENTEC GmbH Drilling & Oilfield Systems Page 18 of 34


BENTEC GmbH Drilling & Oilfield Systems Page 19 of 34
BENTEC GmbH Drilling & Oilfield Systems Page 20 of 34
3.3.2. Air Pipeline from Mast to Racking Board Winch

BENTEC GmbH Drilling & Oilfield Systems Page 21 of 34


BENTEC GmbH Drilling & Oilfield Systems Page 22 of 34
BENTEC GmbH Drilling & Oilfield Systems Page 23 of 34
3.4. Air Pipeline from Manifold Rig Floor to Man Rider Winch & Drill Floor
Winch DS

Drill Floor Winch

Man Rider Winch

BENTEC GmbH Drilling & Oilfield Systems Page 24 of 34


Man Rider Winch

Drill Floor Winch


DS

BENTEC GmbH Drilling & Oilfield Systems Page 25 of 34


3.5. Air Pipeline from Manifold Rig Floor to BOP Hoists

BENTEC GmbH Drilling & Oilfield Systems Page 26 of 34


BENTEC GmbH Drilling & Oilfield Systems Page 27 of 34
3.6. Air Pipeline from Manifold Rig Floor to Drill Floor Winch ODS

BENTEC GmbH Drilling & Oilfield Systems Page 28 of 34


Drill Floor Winch
ODS

BENTEC GmbH Drilling & Oilfield Systems Page 29 of 34


3.7. Air Pipeline from Manifold Rig Floor to Manifold ODS Pipe Skid

BENTEC GmbH Drilling & Oilfield Systems Page 30 of 34


Manifold
Pipe Skid ODS

BENTEC GmbH Drilling & Oilfield Systems Page 31 of 34


3.7.1. Air Pipeline from Manifold Pipe Skid ODS to Substructure Base Winch

BENTEC GmbH Drilling & Oilfield Systems Page 32 of 34


3.8. Air Pipeline from Manifold Rig Floor ODS to Kelly Spinner

Manifold Rig
Floor ODS

BENTEC GmbH Drilling & Oilfield Systems Page 33 of 34


BENTEC GmbH Drilling & Oilfield Systems Page 34 of 34

Вам также может понравиться