Академический Документы
Профессиональный Документы
Культура Документы
Sr No. Description
V1
1 R.L. of deepest foundation level (M) 110
2 River bed level 125
3 R.L. of top of dam road way 215
4 Maximum pool level 210
5 Normal pool level (full Resorvoir level) 198
6 Maximum tail water level 132
7 silt level 135
8 location of centre of gallery from U/S face of dam 9.0 m
9 U/S battern ( from the top of dam 25 m below ) 1:10
10 D/s battern 10 m below top 0.7 : 1 (H:V)
11 Roadway top width 7.5
12 Canal bed level at the beginning 150
13 density of silt 1.36 t/m3
14 Weight of concrete 2.4 t/m3
15 Shearing resistance of concrete 21 kg/m2
16 Safe bearing capacity 14 kg/m2
17 minimum allowable shear friction factor FSS = 1.5 , SFF =3.0
18 maximum coefficient of sliding under normal loading 0.7
19 Uplift area factor 1
20 Uplift intensity factor 0.6
21 Wind velocity 125 km/hr
22 Fetch 8 km
23 Earthquake forces Horizontal = 0.1 g , Vertical = 0.05 g
100
100
100
12hours = 90 mm
4 Design storm for worst condition 24 hours = 150 mm
36 hours = 125 mm
5 type of spillway Ogee type
6 number of span 6
7 clear distance between piers 12m to 15m
8 thickness of pier 2.5m to 3.0m
9 slope of D/S face of the over flow section 0.7:1.0
cd=2.2
10 take
DIVISON
CROP DATA IN % OF GCA
A1
1 PERENNIAL CROP
1.1 Sugar cane 15
1.2 Vegetable 4.5
2 KHARIF CROP
2.1 Rice 21.5
2.2 Groundnut 4.5
2.3 Spinkedmile(Bajra) 4.5
2.4 Malze 5
5 RABI CROP
5.1 Wheat 30.5
5.2 Gram 2.5
5.3 Potatoes 2
7 RATIO-CCA/GCA 0.86
DATA FOR DISTRIBUTORY UNLINED CANAL DESIGN PASSING THROUGH
ALLUVIAL SOIL
1 Chainage (m) from C.R.
% of C.G.A. served by canal outlets
Ground slope downward (General)
Rugosity N value
C.V
Batches
V1
110
125
215
210
198
132
135
9.0 m
1:10
0.7 : 1 (H:V)
7.5
150
1.36 t/m3
2.4 t/m3
21 kg/m2
14 kg/m2
FSS = 1.5 , SFF =3.0
0.7
1
0.6
125 km/hr
8 km
orizontal = 0.1 g , Vertical = 0.05 g
LYSIS
Batch
V1
3000
0.6
100
200
500
1200
1000
800
600
400
200
150
125
100
100
100
12hours = 90 mm
24 hours = 150 mm
36 hours = 125 mm
Ogee type
6
12m to 15m
2.5m to 3.0m
0.7:1.0
cd=2.2
Kp=0.02
Ka=0.2
ICE
Bucket type
bed covered by gravel, kankar and coarse
sand
DIVISON
A1
15
4.5
21.5
4.5
4.5
5
6.5
3.5
30.5
2.5
2
0.7
0.86
IGN PASSING THROUGH
Batches
Sr No. Description
V2
1 R.L. of deepest foundation level (M) 110
2 River bed level 125
3 R.L. of top of dam road way 215.5
4 Maximum pool level 210.5
5 Normal pool level (full Resorvoir level) 198.5
6 Maximum tail water level 132
7 silt level 135
8 location of centre of gallery from U/S face of dam 9.0 m
9 U/S battern ( from the top of dam 25 m below ) 1:10
10 D/s battern 10 m below top 0.7 : 1 (H:V)
11 Roadway top width 7.5
12 Canal bed level at the beginning 150
13 density of silt 1.36 t/m3
14 Weight of concrete 2.4 t/m3
15 Shearing resistance of concrete 21 kg/m2
16 Safe bearing capacity 14 kg/m2
17 minimum allowable shear friction factor FSS = 1.5 , SFF =3.0
18 maximum coefficient of sliding under normal loading 0.7
19 Uplift area factor 1
20 Uplift intensity factor 0.6
21 Wind velocity 125 km/hr
22 Fetch 8 km
23 Earthquake forces Horizontal = 0.1 g , Vertical = 0.05 g
140
130
120
12hours = 90 mm
4 Design storm for worst condition 24 hours = 150 mm
36 hours = 125 mm
5 type of spillway Ogee type
6 number of span 6
7 clear distance between piers 12m to 15m
8 thickness of pier 2.5m to 3.0m
9 slope of D/S face of the over flow section 0.7:1.0
cd=2.2
10 take Kp=0.02
Ka=0.2
DIVISON
CROP DATA IN % OF GCA
V2
1 PERENNIAL CROP
1.1 Sugar cane 14.5
1.2 Vegetable 4.5
2 KHARIF CROP
2.1 Rice 21
2.2 Groundnut 5.5
2.3 Spinkedmile(Bajra) 4.5
2.4 Malze 5.5
5 RABI CROP
5.1 Wheat 30
5.2 Gram 3
5.3 Potatoes 2
7 RATIO-CCA/GCA 0.9
DATA FOR DISTRIBUTORY UNLINED CANAL DESIGN PASSING THROUGH
ALLUVIAL SOIL
1 Chainage (m) from C.R.
% of C.G.A. served by canal outlets
Ground slope downward (General)
Rugosity N value
C.V
Batches
V2
110
125
215.5
210.5
198.5
132
135
9.0 m
1:10
: 1 (H:V)
7.5
150
.36 t/m3
2.4 t/m3
1 kg/m2
4 kg/m2
1.5 , SFF =3.0
0.7
1
0.6
25 km/hr
8 km
.1 g , Vertical = 0.05 g
Batch
V2
3250
0.63
120
120
360
900
1500
2000
500
400
300
200
150
140
130
120
urs = 90 mm
urs = 150 mm
urs = 125 mm
Ogee type
6
m to 15m
m to 3.0m
0.7:1.0
cd=2.2
Kp=0.02
Ka=0.2
ucket type
by gravel, kankar and coarse
sand
IVISON
V2
14.5
4.5
21
5.5
4.5
5.5
6.5
30
3
2
0.6
0.9
SING THROUGH
Batches
Sr No. Description
V3
1 R.L. of deepest foundation level (M) 110
2 River bed level 125
3 R.L. of top of dam road way 214
4 Maximum pool level 209
5 Normal pool level (full Resorvoir level) 197
6 Maximum tail water level 131
7 silt level 134
8 location of centre of gallery from U/S face of dam 9.0 m
9 U/S battern ( from the top of dam 25 m below ) 1:10
10 D/s battern 10 m below top 0.7 : 1 (H:V)
11 Roadway top width 7.5
12 Canal bed level at the beginning 150
13 density of silt 1.36 t/m3
14 Weight of concrete 2.4 t/m3
15 Shearing resistance of concrete 21 kg/m2
16 Safe bearing capacity 14 kg/m2
17 minimum allowable shear friction factor FSS = 1.5 , SFF =3.0
18 maximum coefficient of sliding under normal loading 0.7
19 Uplift area factor 1
20 Uplift intensity factor 0.6
21 Wind velocity 125 km/hr
22 Fetch 8 km
23 Earthquake forces Horizontal = 0.1 g , Vertical = 0.05 g
150
100
100
12hours = 90 mm
4 Design storm for worst condition 24 hours = 150 mm
36 hours = 125 mm
5 type of spillway Ogee type
6 number of span 6
7 clear distance between piers 12m to 15m
8 thickness of pier 2.5m to 3.0m
9 slope of D/S face of the over flow section 0.7:1.0
cd=2.2
10 take Kp=0.02
Ka=0.2
DIVISON
CROP DATA IN % OF GCA
B1
1 PERENNIAL CROP
1.1 Sugar cane 14
1.2 Vegetable 5
2 KHARIF CROP
2.1 Rice 21
2.2 Groundnut 4.5
2.3 Spinkedmile(Bajra) 5.5
2.4 Malze 5.5
5 RABI CROP
5.1 Wheat 20
5.2 Gram 3
5.3 Potatoes 2
7 RATIO-CCA/GCA 0.88
DATA FOR DISTRIBUTORY UNLINED CANAL DESIGN PASSING THROUGH
ALLUVIAL SOIL
1 Chainage (m) from C.R.
% of C.G.A. served by canal outlets
Ground slope downward (General)
Rugosity N value
C.V
Batches
V3
110
125
214
209
197
131
134
9.0 m
1:10
: 1 (H:V)
7.5
150
.36 t/m3
2.4 t/m3
1 kg/m2
4 kg/m2
1.5 , SFF =3.0
0.7
1
0.6
25 km/hr
8 km
.1 g , Vertical = 0.05 g
Batch
V3
3500
0.7
100
150
200
700
1500
2000
1500
1200
600
300
200
150
100
100
urs = 90 mm
urs = 150 mm
urs = 125 mm
Ogee type
6
m to 15m
m to 3.0m
0.7:1.0
cd=2.2
Kp=0.02
Ka=0.2
ucket type
by gravel, kankar and coarse
sand
IVISON
B1
14
5
21
4.5
5.5
5.5
6.5
20
3
2
0.4
0.88
SING THROUGH