Prepared by:
Ian Baldwin
Standards Policy and Data Quality
18 December 2012
Custodian: P&PM
Distribution list
When this document is updated, the following people must receive a copy of the updated version:
Name Position/title
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page ii
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
Related/referenced documents
Note all documents are to be held in the project folder with in Western Power’s Document
Management System (DMS) inline with Western Powers Records Keeping Policy. All signed
documents are to be scanned and entered into the DMS. All documents referenced are to be prefixed
by DM # then the DMS Number. All project Documents are to be controlled through the Project
Document Register.
Approval
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page iii
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
Contents
1 Purpose of document..........................................................................1
3 Project agreements..............................................................................2
3.1 Approval................................................................................................2
3.2 Project description................................................................................2
3.3 Scope....................................................................................................2
3.4 Assumptions.........................................................................................3
3.5 Constraints............................................................................................4
3.6 Acceptance...........................................................................................4
3.7 Critical success factors.........................................................................4
3.8 Project costs.........................................................................................5
3.9 Budget tracking.....................................................................................6
3.10 Business Benefits.................................................................................7
3.11 Safety..................................................................................................10
4 Project approach................................................................................11
4.1 Overview.............................................................................................11
4.2 Implementation Approach...................................................................12
4.3 Outline................................................................................................12
4.4 Software Development Lifecycle (SDLC) Methodology.......................12
4.5 Organisation Processes and Enterprise Deliverables.........................12
6 Communications Management.........................................................19
6.1 Stakeholder Assessment.....................................................................19
6.2 Communications Plan.........................................................................20
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page iv
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page v
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
1 Purpose of document
This Project Management Plan is written by SP&DQ’s Principal Project Coordinator with
support from the project team and is approved by the Project Sponsor. It describes what
the team plans to produce (interim and final deliverables) and what resources are needed
to produce it.
It is used to:
Demonstrate the Project Manager's understanding of the project requirements.
Guide project execution.
Document project planning assumptions and decisions.
Provides a baseline for progress measurement and project control.
Facilitate communication among stakeholders.
Western Power utilises a number of systems and spreadsheets to manage and report on
its distribution and transmission assets, and the associated work performed on those
assets. As the need for better visibility of consolidated information grows, it is becoming
increasingly difficult to produce consistent results from these disparate sources.
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 1
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
3 Project agreements
This section defines key management outcomes in the project.
3.1 Approval
The Equipment & Works Data Warehouse Continuous Improvement Business Case was
signed by the CEO on 21/10/12. The Business Case covers the project which relates to
the build, test, and deployment of the previous descoped, partially delivered, unresolved
defects and enhancements identified in previous EWD projects.
This project was initiated with the release of interim funding for Business Case EWD CIP
DM#9202721.
This project covers the enhancements as outlined in Section 3.3, for the duration of FY
12/13 and all phases, stages and iterations achievable during the time frame.
This Project Management Plan covers the EWD CIP. It will be periodically revisited and
updated through out the life of the project.
3.2.1 Location
The EWD CIP will be conducted and built on site at Western Powers Head Office 363
Wellington Street Perth WA 6000.
3.3 Scope
3.3.1 In Scope
In scope items for the EWD Continuous Improvement Project are outlined in the CIP
Scope Register DM#10114737 and approved in the Business Case DM#9202721. Below
is a list of those items approved for delivery in this project. For additional information
about each requirement refer to the Scope Register DM#10114737. For test cases that
relate to the deliverable, utilise the Requirement Unique Identifier in Quality Centre,
Western Power’s Testing and Defect Management Tool, under EWD CIP Project:
Time Based Reporting
Old MS Access Snapshots into Oracle.
Query and View SPIDA Data via SPIDA.
View All Network Asset Data Spatial and non-Spatial by time.
Management of Abandoned Attributes.
Historical Streetlight Data.
Network Topology Subject Area.
Incorporation of SPIDA - Only Electrical Components in EWD.
Removal of Redundant Fields.
Access Data Sources External to COGNOS.
Inclusion of Carrier Data.
Spatial Indexing.
EWD Notifications.
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 2
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
ESRI Capability.
Removal of Cognos Framework Expressions on Fields.
Data Profiling.
Performance Tuning.
Specification Definition.
Disaster Recovery.
Communications and Controller Information into EWD.
OSDS Database Field Corrections.
EWD Documentation.
EWD Content Reporting.
SPIDA Attributes.
Changes in Source Systems.
Ability to create Mandatory External and Critical Internal Reports via EWD.
Physical Connectivity.
Represent spatial data in a one to many relationships.
3.4 Assumptions
An evaluation period of 5 years was utilised in financially assessing the
considered options.
Western Power's information needs will largely stay the same even with the
introduction of new operational systems and business processes. Should a
change result in the redesign of a part of the data warehouse, this will be
accommodated through a Change Request.
Data quality issues identified by this project will be addressed by existing Western
Power business units responsible for this function and not by the project.
Ongoing operating costs are based on: An additional 50% of a Business
Intelligence resource will be required to support this component of the warehouse
on an ongoing basis; hardware costs of $10,000 p.a. based on IT’s assessment
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 3
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
of disk storage required and training costs of $10,000 p.a. based on 5 power
users to be technically trained to use IBM Cognos.
The project will conform to the current Business Intelligence access model which
will determine an individual user's view of information.
This project will contribute to and support business impact on reporting processes
but it will not manage any resulting changes to data capture or data usage
processes.
The ISAM project delivers asset and condition data to Ellipse in accordance with
its time schedule at the time of writing this Project Management Plan. Should a
significant change result in the ISAM projects time schedule, the funding impact
to EWD will be accommodated through a Change Request.
The ISAM project modifies the Work Order and project structures in Ellipse in
accordance with the project’s time schedule at the time of writing this business
case. Should a significant change result in the ISAM project’s time schedule, the
funding impact to EWD will be accommodated through a Change Request.
3.5 Constraints
Operational priorities may take preference over projects, therefore the
implementation of the recommended project will need to be cognisant of, and
operate within these constraints.
The overall project is delivering to a predefined platform in terms of hardware,
database and Business Intelligence software.
ISAM and EWD projects are dependent on some aspects of each other (inter-
project dependencies); the two projects may also have specific tasks that depend
on each other (cross-project links). Although this will be tracked and managed,
there is a potential for scheduling shifts and can become a constraint.
3.6 Acceptance
The Project will be considered accepted when all key project deliverables as listed in
Section 3.3.1 have been approved and signed off by the relevant stakeholder’s inline with
the exit criteria for each requirement as per the Scope Register DM#10114737.
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 4
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
Dependences – The vast majority of deliverables for this project rely on sources
systems and the data they hold. If these do not in exist or required to be modified
to hold new data then the ISAM Project is accountable for delivering these source
systems as per there published scope of work. Any delays to the delivery of
theses systems or the data they hold will have a negative impact on some of the
deliverables for the EWD CIP Project even though they may have a high priority
rating.
- -
- - -
$875,0 $1,500,0 $1,500,0
00 00 875,000 00
87
risk allowance ,500.00 $150,000
962
Totals ,500.00 $1,650,000
total option
one $2,612,500.00
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 5
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
Training Costs based on 5 people trained per year for a 2 day training by a technical specialist
Technical Specialist Hourly rate $123
2 Day Course rate $1,850
BI Support Agreed through discussion with IT (DM#9123737), Estimated at 50% of a BI Analyst resource
BI Analyst Hourly Rate $93
Yearly Cost $181,994
Support and Hardware Requirements agreed through consultation with IT (DM#9123737 and DM#9123738)
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 6
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 7
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 9
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
3.10.1.2 Type II Benefits Economic Value - $833,544 Present value over AA3 period
The use of the EWD tool across the business will result in the reduction and
some cases the avoidance of field visits. The main identified motion time saved.
The areas of the business that own and will realise theses benefits as well as the
breakdown can be found at DM#9057766.
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 11
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
3.11 Safety
All project personnel, including contractors, will be governed by the Western
Power Safety Manual (DM#3403146) and will undergo the relevant site
inductions prior to commencing work at the site.
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 12
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
4 Project approach
4.1 Overview
Given the expected level of change within Western Power over the life of this project, a
flexible approach to project delivery will be required. As a result, a staged approach to
implementation will be adopted. Each stage or “Iteration” will target one or more
information subject areas and will be treated as a deliverable in its own right. Iteration will
deliver the following:
The reporting subject areas for ad-hoc analysis
A set of standard, pre-built reports (the exact reports that will be delivered will be
determined in the detailed analysis of each sub-phase)
Training for end users
Metadata to provide visibility of the source of the data and the transformations
that have been applied to it
The subject areas to be delivered during the project are listed below. One or more
subject areas will be delivered within each sub-phase. This sequence is aligned with the
business priority and needs:
Modify data feeds into the data warehouse to source equipment and defects
information from Ellipse;
Modify data feeds into the data warehouse for Transmission Wood Pole
information from Ellipse rather than TLS and TRIS;
Data warehouse modification to cater for work order and project structure
changes initiated by Mobile Workforce Solution and ISAM. Changes to impacted
business reports will need to be undertaken by the business power users;
Load snapshots of historical DFMS data, which is currently stored in a “stand-
alone” database, into the data warehouse and decommission the stand-alone
database;
Create reports that are currently provisioned from TIPD and DAMP databases to
allow business continuity as underlying systems are replaced;
Enhancements to previous delivered prebuilt reports and creation of new reports
that will ensure business continuity and the take-up by the business is
maximised;
Requirements and/or Analysis Phase of the following items:
Secondary Systems Asset Reporting with a view to replacing current
reporting systems as the assets get moved into Ellipse;
Enhance the view of equipment in the data warehouse to provide a
topological view, showing connectivity relationships between individual
pieces of equipment;
Automate the reliability reporting back end process to eliminate manual data
extracts and consolidation, including sourcing TCS data from the data
warehouse;
Incident Reporting for Feeders; and
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 13
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
Integration of the SPIDAWeb GIS platform with the Cognos reporting suite to
allow spatial analysis of equipment.
4.3 Outline
Once into the build phase the project will run on a 6 week iterative cycle. The list of
approved scope items are those identified as required at the start of the project. At week
five of the iteration cycle a review of the requirements will be conducted. Any new
requirement raised at the EWD Focus Group will be prioritised with the existing
requirements and recommendation as to what will be in the next iteration will be
presented to the Steering Committee with sign off by the Project Sponsor, within the
limitations and constraints as outline at 3.7.
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 14
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 15
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 16
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
There may be a difference in the Extreme Reconcile all data in the warehouse High
figures reported out of the data back to as many potential sources
warehouse compared to other as feasible. Explain what
systems leading to a lack of trust transformations have happened to
in the numbers and therefore a data on the way in to the data
lack of acceptance of the solution warehouse. Ensure suitable
governance in place to determine
the "source of truth"
The scope of deliverables cut Extreme Include an “Architect” role on the High
across a number of existing project, one who is familiar with all
subject areas in the data warehouse subject areas and who
warehouse with the potential to can work alongside the ES and BI
implement duplicated functionality teams; extensive review of data
models and ETL approach
The complete list of risks and issues can be found in the EWD Issues, Risk and Change
Log (DM#9689902). An extraction of the Risk Log being built at the time of this PMP is
shown below
Issue will be addressed on severity and action taken will be dictated by the impact. An
extraction of the Issue Register being built at the time of this PMP is shown below:
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 18
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 19
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
The Architectural Review Group (ARG) will be engaged for review and
acceptance of Technical Solution;
All Server builds will be built in accordance with standard build and testing
processes to the Standard Operating Environment (SOE) standard;
All applications developed/configured by the project will be system tested by
Quality Centre team and Defects prioritised and addressed. Testing report
discussed and approved by project sponsor prior to production implementation;
All deliverables produced by the External Service Provider (Wipro) will be
reviewed by the Western Power BI Team to ensure adherence to Western Power
architectural and technical standards;
End user training will be provided for all users requiring access to the solution. A
combination of internal training as well as external (vendor) training will be
provided where appropriate for the expected level and type of use of the system;
User Acceptance Testing will be completed and signed off 1 week prior to
production implementation, and
All implementations and production changes will comply with Western Power’s IT
Service Management Change Management policy and criteria (DM#2010374).
5.5 Inter-dependencies
Dependencies are recorded in the EWD Issues, Risk and Change Log (DM#9689902)
under the interdependencies tab. The list of dependencies will be updated as the project
progresses and as other project come online.
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 20
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
6 Communications Management
6.1 Stakeholder Assessment
This section identifies all parties who are impacted by the implementation of the
project or who have an interest in the outcome. Table 1 below lists each
stakeholder and identifies strategies for gaining support or minimising negative
impacts.
Table 1: Stakeholder Analysis Matrix
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 21
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
IT Service Provide first level Project will be likely 1. Key project milestone
Desk support of solution to have an impact on dates (roll out of new
once implemented the volume of calls system etc)
Service Desk receive
2. Technical briefings /
post go-live
support issues -
overview of the system,
any known problems /
work around with the
system, training
available for users
3. Service transition to
support plan (number of
users impacted,
expected volume of
calls, work procedures
for dealing with EWD
calls etc)
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 22
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 23
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
Project Manager Nicholas Howard Overall Project Delivery Full time for the
Business duration of the project
Project Manager IT Marinko Gaspar IT Project Delivery Full time for the
duration of the project
Project Sponsor Andy Neemann Provides scope and Intermittently for the
vision. Involved in duration of the project
status and risk review.
Makes business
resources available
Program Manager Ian Baldwin Provide overall project Intermittently for the
governance and point duration of the project
of escalation for
administrative issues.
Equipment and Works Sundy Thjin Act as a change Full time for the
Data Warehouse champion for the duration of the project
Solution Lead solution. Take
accountability for the
solution design and the
functional specification.
Provide leadership to
the core team, SMEs
and Business
Representatives when
they are involved in
designing the solution
in detail.
Asset and Works sub- Peter Chomiak Validate solution Intermittently for the
program Solution Paul Keating design from the duration of the
Leads Vera Van Jaarsveldt perspective of the other project.
projects within the
Asset and Works sub-
program. Provide input
to the project on the
proposed solution of
their respective
projects.
Solution Implementer Wipro Responsible for Full time for the
designing and building duration of the project
a solution that satisfies
the business
requirements. Provide
knowledge transfer to
the WP BI Team on
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 24
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
developed solution.
Quality Assurer Western Power Responsible for Intermittently for the
Business Intelligence ensuring deliverables duration of the
Team comply with Western project.
Power technical and
architectural standards.
BI Architect Western Power Provides expertise on Intermittently for the
Business Intelligence data warehouse duration of the
Team architecture and project.
Cognos architecture
within Western Power.
Business Subject WP Business Unit Provides expertise on Intermittently for the
Matter Expert representatives business areas, duration of the
processes, and project.
requirements.
Technical Subject WP BI Team, WP Provides expertise on Intermittently for the
Matter Expert Data Management source systems and duration of the
Team existing data project.
warehouse subject
areas.
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 25
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 27
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 28
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
7.2.4 Equipment and Works Data Warehouse Solution Lead (Client Rep) –
Sundy Thjin
The Solution Lead is accountable for defining a solution which will deliver the Sponsor
and stakeholders the organisational transformation required. Along with the Project
Manager, the Solution Lead is a key player in the Project Management Team.
The Solution Lead is responsible for:
Taking accountability for the solution design and the functional specification.
Being Western Power’s evangelist for the Equipment and Works Data solution.
Acting as a change champion for the solution and project.
Taking an enterprise perspective on the solution to ensure an integrated “Whole
of Business” solution is designed and developed over time.
Appling his knowledge of Western Power’s processes and systems and industry
best practice to define the best solution for the project’s business requirements.
Drive the identification and acceptance of feasible alternative solutions,
recognising constraints such as system functionality, user impact, level of
change, and time to implement; taking a clear position on what they believe is the
optimal solution for Western Power.
Transferring the appropriate business and technical knowledge to project team
members as required.
7.2.6 Asset and Works sub-program Solution Leads (EWD Focus Group)
The Asset and Works sub-program Solution Leads are the equivalent of the Equipment
and Works Data Solution Lead for the other projects within the Asset and Works sub-
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 29
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
program. All Solution Leads work together to ensure an integrated “Whole of Business”
solution is designed and developed over time.
The Asset and Works sub-program Solution Leads are responsible for:
Liaising with the Equipment and Works Data Warehouse Solution Lead to ensure
each project’s solution aligns with an integrated, enterprise view of information
Along with the Equipment and Works Data Warehouse Solution Lead,
determining the business priorities in relation to the scheduling of specific
deliverables during the implementation phase
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 30
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
8.1 WBS
A WBS DM# 10250496 has been provided to highlight the main tasks that are to be
performed within the EWD CIP. The WBS has been rolled up to three levels to allow for it
to be utilised when describing where elements of the project are working. For more detail
of tasking please refer to the Project WBS Dictionary DM# 102405678 or for progress the
Project Status Report or Schedule DM#5294191.
8.2 Schedule
The schedule below shows the rolled up components to be implemented. The content
and priority of delivering scope items are dependent on other projects (i.e. ISAM2)
meeting their implementation schedules.
The project schedule is designed to controlled and monitor the project. It is the
responsibility of the Project Manager to monitor and maintain the schedule. The schedule
is reported on fortnightly in the Project Status Report and reviewed by the Program
Manager for quality purposes DM#5294191. Schedules are to be rebase lined after
change requests and up dated fortnightly to reflect progress.
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 31
one week from print date. Refer to DMS for current version [Template 743689]
Project Management Plan
Equipment and Works Data
Continuous Improvement Project
WR 3527
DM#: 9987158v1 Uncontrolled document when printed. Printed copy expires Page 32
one week from print date. Refer to DMS for current version [Template 743689]