BILL OF QUANTITIES
ETHIHAD RAIL NETWORK
PACKAGE 2S - RAILWAY INTEGRATION SYSTEMS
GENERAL SUMMARY
Amount
Description
(AED)
GENERAL SUMMARY
GENERAL SUMMARY
Amount
Description
(AED)
ETHIHAD RAIL NETWORK
GENERAL REQUIREMENTS
K Finance charges
Bonds:-
Insurances:-
R Workmen's Compensation
U Professional Indemnity
ETHIHAD RAIL NETWORK
Bill 1 / Page 1
Amount
(AED)
12,492,000.00
Included
Included
Amount
(AED)
12,492,000.00
ETHIHAD RAIL NETWORK
Amount
Description Qty Unit Rate
(AED)
Amount
Description Qty Unit Rate
(AED)
ETHIHAD RAIL NETWORK
PACKAGE 2S - RAILWAY INTEGRATION SYSTEMS
CIVIL WORKS
To Collection 237,046.03
ETHIHAD RAIL NETWORK
PACKAGE 2S - RAILWAY INTEGRATION SYSTEMS
J Along the Perimeter and Inside the rooms 487 M2 84.00 40,935.30
K Along the Perimeter and Inside the rooms 908 M2 85.00 77,180.00
Supply and fixing of fire rated flat gypsum board ceiling with rigid
support without joint taping and putty.
L Inside Scada Room, Authority meeting room and Battery Room 58 M2 125.00 7,281.25
N Inside Scada Room, Authority meeting room and Battery Room 58 M2 26.00 1,514.50
To Collection 1,364,857.49
ETHIHAD RAIL NETWORK
PACKAGE 2S - RAILWAY INTEGRATION SYSTEMS
To Collection 177,360.00
ETHIHAD RAIL NETWORK
PACKAGE 2S - RAILWAY INTEGRATION SYSTEMS
Total number of 11KV Sub Stations With Masonary Works No 12.00 1,779,263.52 21,351,162.23
CIVIL WORKS
Supply and Fixing of gate along with all the necessary fittings
To Collection 243,674.51
CIVIL WORKS
To Collection 26,996.40
ETHIHAD RAIL NETWORK
PACKAGE 2S - RAILWAY INTEGRATION SYSTEMS
CIVIL WORKS
To Collection 45,588.00
ETHIHAD RAIL NETWORK
PACKAGE 2S - RAILWAY INTEGRATION SYSTEMS
CIVIL WORKS
To Collection 91,660.50
ETHIHAD RAIL NETWORK
PACKAGE 2S - RAILWAY INTEGRATION SYSTEMS
CIVIL WORKS
To Collection 62,748.00
ETHIHAD RAIL NETWORK
PACKAGE 2S - RAILWAY INTEGRATION SYSTEMS
CIVIL WORKS
To Collection 43,705.86
ETHIHAD RAIL NETWORK
PACKAGE 2S - RAILWAY INTEGRATION SYSTEMS
CIVIL WORKS
Supply and Fixing for 110mm diameter PVC duct for cabling
To Collection 130,130.00
CIVIL WORKS
To Collection 2,492.50
ETHIHAD RAIL NETWORK
PACKAGE 2S - RAILWAY INTEGRATION SYSTEMS
CIVIL WORKS
To Collection 2,570.50
ETHIHAD RAIL NETWORK
PACKAGE 2S - RAILWAY INTEGRATION SYSTEMS
CIVIL WORKS
To Collection 241,500.00
ETHIHAD RAIL NETWORK
PACKAGE 2S - RAILWAY INTEGRATION SYSTEMS
ELECTRICAL WORKS
To Collection 41,402.00
ETHIHAD RAIL NETWORK
PACKAGE 2S - RAILWAY INTEGRATION SYSTEMS
Containment Installation
Cable tray including all necessary fittings and supporting
bracketry complete as described
Sleeves
To Collection 47,465.00
MECHANICAL WORKS
GI Ducting for supply and return air as per SMACNA std with
D
50mm Fibre glass insulation and fostering
E Aluminum Cladding for the ducting on the exposed area
1 LS 145,000.00 145,000.00
F GI Volume control Dampers in Each Branches
G Acoustic Insulation upto 3 Mtr Length from the units
H Supply and Return Air Grills
Supply and installation of Upvc Drainage pipes and RWO for the
K roof rain water which is to be drained outside in the bottom of 1 Item 8,900.00 8,900.00
the Building
To Collection 596,400.00
ETHIHAD RAIL NETWORK
PACKAGE 2S - RAILWAY INTEGRATION SYSTEMS
To Collection 81,000.00
ETHIHAD RAIL NETWORK
PACKAGE 2S - RAILWAY INTEGRATION SYSTEMS