Change Management Process should be used, and where required verification should involve multiple

parties.
TOOLSET AND RELATED WORK INSTRUCTIONS
HP Service Manager – ChgM Work Instructions for
Quick Reference Card 11. Validation – each Change must be validated to confirm that the Change Emergency, Normal, Standard (Routine), Template, Addendum can be
Target Audience: Account and Service Delivery Executives and Change was successful and/or yielded the intended results. All failed Changes found at: PVE - Change Management
Managers must be followed up with a Post Implementation Review (PIR). CHANGE TYPES AND CATEGORIES
Owner: Change Management Global Process Subject Matter Expert 12. Process Performance - every Change must be measured as part of Standard - A well defined, fully documented Change with low risk and/or
Version: R 01.06 overall Change performance, so that Customer and HP internal metrics can significant value in providing stability to the business. These Changes
Version Date: Jul-2013 be reported. follow a predefined set of work instructions. These types of Changes are
DEFINITION OF CHANGE MANAGEMENT ROLES AND RESPONSIBILITIES pre-approved by the Customer and the Change Advisory Board (CAB).
Change Management - the objective is to control and manage Changes to Change Manager - The HP Change Manager(s) owns the day to day Normal – Any temporary or permanent Change to a service or the
services and associated IT infrastructure components (represented as operation of the Change Management process for a Customer. infrastructure with a certain level of risk within a managed environment.
Configuration Items (CIs)), to promote business benefit while minimizing They are ultimately responsible for the Request for Change (RFC), its Careful planning and adherence to the Change Management process can
the risk of disruption to services and therefore impact on the business. successful implementation and ensuring appropriate authorization is reduce any potential risk and impact associated with an individual Change.
Change Management manages coordinates and controls the gained before a Change is deployed.
Urgent (Normal) - Changes which are considered as urgent by the
implementation of Requests for Change (RFCs). Change Requester - An individual within the Business or Organization
Change - Any modification to the managed environment, including the business. They follow the Normal Change process flow, but by the nature
entitled to raise a Change Request. This could be someone from HP or a
of their potential impact to the business they by-pass normal Customer
addition, removal, or replacement of any component (Configuration Item) Customer representative. An Organization should identify and document
lead times and therefore may need to be implemented prior to the next
supporting the infrastructure or a service in that environment. These an Authorized Change Requester List. The Change Requester is responsible
modifications must be under Change Management scheduled CAB review. The planning, review and approval of these Changes
for translating a Business need into an actionable Change Request
occurs in a streamlined controlled fashion. The risks associated with
BUSINESS RULES ensuring the request contains as much information as possible, and
Urgent Changes are higher, since the available time to assess, plan and
The following "Business Rules" are high level operational standards which ensuring the Change Request clearly defines the goals and business
implement these Changes is reduced, so it is important to ensure that
must be adhered to in order to effectively perform and execute the Change objectives.
Urgent Changes are raised as exceptions and not the norm. Poor planning
Management process. Business Rules help ensure successful and complete Change Supervisor - The Change Supervisor is responsible for leading,
and preparation are not valid reasons for raising Normal Change Requests
outcomes with each execution: coordinating and supporting the planning, build and test, and
as Urgent.
implementation phases associated to a Change.
1. A Change Management Process must be well defined, documented, Change Approver - The Change Approver is responsible for evaluating and Emergency - A Change required to be applied to a managed environment
correctly implemented, and consistently followed approving Change and Release and Deployment Plans on behalf of the as a result (or to prevent) of sudden loss or reduction of service. Due to
2. Training - all HP staff and suppliers involved in Change Management domain which they represent. The domain could be the Customer, Tower, their nature Emergency Changes are always derived from business critical
must be trained and familiar with the Change Management process before and a vertical business unit, an Account or a Service. Incidents. Emergency Changes are the only Change type that is reactive,
they use the process Change Tester - The Change Tester is responsible for performing and not proactive. Poor planning and preparation are not valid reasons for
3. Roles and Responsibilities - must be clearly defined, documented, and recording the outcome of tasks defined in the Test Plan. Their technical submitting Emergency Changes.
maintained using a Change Management Contact Matrix. Need to also ability will enable the Change Tester to carry out the test and where
ensure that those directly involved in the process are empowered to applicable provide solutions to issues and errors which may arise.
Change Implementer - Individual(s) identified as subject matter experts
PROCESS FLOW, PROCEDURES AND ACTIVITIES
perform the role they are assigned within the process.
4. Categorization – each Change type (Normal, Emergency or Standard), who are responsible for deploying a Change as defined in the Build/Test
must follow the appropriate Process flow and associated lead times. and Implementation Plan.
5. Change Approval - all Changes must be documented, categorized, Change Advisory Board (CAB) - The Change Advisory Board is a function
tracked, and approved via Change Advisory Board (CAB). which consists of individuals (some of whom have been identified earlier)
6. Unauthorized Changes are strictly prohibited - Unauthorized Changes responsible for reviewing and formally approving or rejecting Change and
are those Changes which are implemented without a formal Request for Release and Deployment Plans.
Change being raised, or a Change which is not fully approved, or a Change Technical Advisory Board (TAB) - The Technical Advisory Board is a
which is implemented outside the approved parameters of the original function which consists of individuals (some of whom have been identified
Change Scope (for example. a Change implemented outside the agreed earlier) who discuss advice and approve Changes from a technical
implementation window or a modification to the CI's impacted). prospective. Typically this review will take place before the CAB meeting
7. Emergency Changes are utilized for Incident Resolution. Urgent Changes and its finding submitted as additional information to support a Change
are utilized to address Business Critical requirements and must follow the Request.
normal change process in an expedited way PROCESS AND SUPPORTING ASSETS
8. Scheduling – Changes must be scheduled during an approved Change HP Global Change Management Process can be found at:
window. The duration must be sufficient to manage the execution, PVE - Change Management
verification, validation and back out. The window should not conflict with Where the following documents can be referred to:
any agreed availability for the CI’s or Services impacted by the Change  ChgM Flow Diagram Overview
9. Change Execution – every Change Request must be documented (where  ChgM Relationship Diagram See ChgM Flow Diagram Overview
possible tracked via workflow tool). A change record must adhere to the  ChgM Process Overview Guide
agreed Change process without deviation or Non-conformance.  ChgM Metrics Guide ChgM-01 INITIATE RFC
10. Verification - Implemented Changes must be verified to have been  ChgM Roles Guide Change Requester
completed as documented and designed; verification criteria or testing  ChgM 01-01 Identify Change Type
 ChgM 01-02 Complete RFC Record
Important Confidentiality Notice HP Confidential
© Copyright 2013 Hewlett-Packard Development Company, L.P. Valid Agreement Required.
The information (data) contained on all sheets of this document constitutes confidential information of Hewlett-Packard Company or its affiliates (collectively hereinafter “HP”).
ChgM-06 APPROVE CHANGE IMPLEMENTATION /RELEASE
ChgM-02 ASSESS AND AUTHOURIZE RFC DEPLOYMENT PLANS
Change Manager Change Manager
 ChgM 02-01 Assess Change  ChgM 06-01 Notify Implementation Approvers and Schedule CAB
Change Requestor:  ChgM 06-02 Review and Approve Implementation Schedule
 ChgM 02-02 Complete Additional RFC Detail  ChgM 06-03 Revise Implementation Schedule
Change Supervisor Change Supervisor
 ChgM 02-03 Perform Technical Assessment  ChgM 06-04 Schedule Implementation Resources
Change Manager
Change Manager
 ChgM 02-04 Identify Release Candidates  ChgM 06-05 Finalize and Communicate FSC
 ChgM 02-05 Authorize RFC
 ChgM 02-06 Reject Change and Close RFC ChgM-07 IMPLEMENT CHANGE
Change Supervisor
ChgM-03 Plan CHANGE  ChgM 07-01 Coordinate Change Implementation
Change Manager Change Implementer
 ChgM 03-01 Review Change Category  CHMG 07-0 2 Perform Implementation Activities
Change Supervisor
Change Manager
 ChgM 03-02 Perform Risk / Impact Assessment  ChgM 07-03 Review Implementation Status
 ChgM 03-03 Document Change Plan Change Tester
Change Manager  ChgM 07-04 Execute Post-Implementation Tests
 ChgM 03-04 Identify Change Approvers Change Implementer
Change Supervisor  ChgM 07-05 Execute Back-out
 ChgM 03-05 Propose Schedule and Finalize Change Plan Change Supervisor
 ChgM 07-06 Trigger Configuration Management Update
ChgM-04 APPROVE CHANGE/RELEASE PLANS AND SCHEDULE
Change Manager ChgM-08 MONITOR, REVIEW AND CLOSE CHANGE
 ChgM 04-01 Review Change / Release Plans Change Manager
 ChgM 04-02 Notify Approvers and Schedule CAB  ChgM 08-01 Review Change Record
 ChgM 04-03 Review and Approve Plans Change Supervisor
Change Supervisor  ChgM 08-02 Monitor Change
 ChgM 04-04 Schedule Resources Change Manager
Change Manager  ChgM-08-03 Review Post Implementation Status
 ChgM 04-05 Update and Communicate FSC  ChgM-08-04 Notify Post Implementation Reviewers & Schedule CAB
 ChgM 04-6 7 Review Change Plan Options  ChgM-08-05 Review Implementation Results
 ChgM 04-08 Reject and Cancel Change  ChgM-08-06 Apply CAB Actions
 ChgM-08-07 Update and Close Change Record
ChgM-05 BUILD AND TEST CHANGE
Change Supervisor CLOSURE CODES
 ChgM 05-01 Coordinate Build Service Manager
 ChgM 05-02 Submit Change Procurement
Change Implementer Successful
 ChgM 05-03 Perform Build Activities Successful with issues
Change Supervisor
Implemented – with Customer Impact
 ChgM 05-04 Coordinate Change Testing
Change Tester Backed Out – Customer Impact
 ChgM 05-05 Execute Test Activities Backed Out – No Customer Impact
Change Supervisor
 ChgM 05-06 Log, Review and Resolve Defects Rejected (Financial/Security/Technical)
 ChgM 05-07 Update Supporting Change Documentation Cancelled
Change Manager
 ChgM 05-08 Approve Build and Test Activities Withdrawn
 ChgM 05-09 Review Build/Test Options Rescheduled by HP – SLA met
 ChgM 05-10 Cancel Change Record
Rescheduled by HP – SLA breached
Rescheduled by Customer

Important Confidentiality Notice HP Confidential


© Copyright 2013 Hewlett-Packard Development Company, L.P. Valid Agreement Required.
The information (data) contained on all sheets of this document constitutes confidential information of Hewlett-Packard Company or its affiliates (collectively hereinafter “HP”).

Вам также может понравиться