Вы находитесь на странице: 1из 17

Site Acceptance Testing for New insatllation ac

Circle

✘ New Site
Basic Information (New Site/ Swap)

Technology 2G 3G
Site ID :-
Site Name TILBHITTA-02
Ramjee Bhagat S/o Late Sambhonath Bhagat, Vill+PO- Sangrampur
Address 816107. Mob- 9576001072
Site Type (ID/OD) OD
IP 55 cabinet Make if applicable NA
Parent Node Name & Id
BTS -OEM NOKIA
BTS Type MR
RF Configuration
MIMO Power configuration
BTS SW Version FL18A
BTS IP 100.69.248.118
BTS O&M IP 100.69.248.118
TOCO (Indus/Infratel/ATC etc..)
Type (GBT/RTT/RTP/IBS)
No. of Sectors
Date of AT

Signoff :

BSS Manager:-MD SHAIF


Date :
Mobile Number: 919755042281
New insatllation activtiy

BIHAR

Swap/
Upgrades Sector Addition

3G ✘ FDD TDD SRAN


JHTIL-02
TILBHITTA-02
hagat, Vill+PO- Sangrampur, PS- Pakur Muffasil, Dist- Pakur. Pin-
816107. Mob- 9576001072
OD
NA
JHTIL-02
NOKIA
MR
2T2R/4T4R
43 dbm
FL18A
100.69.248.118
100.69.248.118
INFRATEL
GBT
3
3-Oct-19

off :

Project Manager:-JAYANT BIJAY


Date:
Mobile Number: 8405004048
OEM to fill details
S.No
Activity
1-Rack & Cabinet
Cabinet is fixed firmly with all necessary installation accessories in correct
1.1.01 sequence
Cabinet is or order. mounted & secured on wall /pole. (When the cabinet is
properly
1.1.02 mounted on wall/pole).
1.1.03 IP 55 Cabinet Filter( whereever appicable) are in place and properly cleaned
1.1.04 IP 55 cabinet fans are working properly
1.1.05 IP 55 cabinet alarms are extended
2. Base station
2.1.01 RF Module Type- Technology wise for SRAN
2.1.02 No of RF Module- Technology wise for SRAN
2.1.03 Base band Unit Type
2.1.04 No of Baseband Units- Technology wise
2.1.05 Base Station is secured installed.
Base Station is perfect at vertical position ( Should not be tilted towards sky or
2.1.06 ground )
2.1.07 IP seals /plugs must be installed in all module.
2.1.08 RRUs are securely installed.
3-Power and grounding cable
3.1.01 Tower, DG and Shelter grounding is connected to earth pit
3.1.02 Potential between Earth to Neutral is zero
3.1.03 Circuit breaker for PDU, DCDU, BBU and RRU meets the design specifications.
3.1.04 BBU and DCDU are grounded.
3.1.05 Number of DCDUs installed
All the power cables and protection ground cables are connected firmly with
3.1.06 RRU is grounded
correct polarity. and the grounding cable of RRUs are extended downward and
3.1.07 fixed to the tower nearby.(ensure that paints are removed at touching portion of
3.1.08 clamp to tower
RRU power member
cables before in
are arranged fixing).
neat and straight way without any crossing.
3.1.09 IGB is properly grounded to earth pit
3.1.10 OGB is properly grounded to earth pit
3.1.11 Grounding of FO cable at Y joint should be downward & weather proofing done.
3.1.12 CPRI - FO Cable looped in ring at least 2-3 times
3.1.13 Any visible stretch/Cut/damage on FO Cable.
4. Media Cable
4.1.01 The E1 / Ethernet Lan cables are routed and connected securely at BBU.
4.1.02 CPRI cables of RRU are arranged in neat and straight way without any crossing.
4.1.03 The fixing clips of the CPRI cables of RRU are spaced evenly and secured and
oriented
Cables inrouted
are thesame direction.
properly inside and outside the cabinet and bound with ties
4.1.04
with uniform spacing & moderate tightness.
Correct CPRI Cable / SFP Port is there as per FDD-1000/TDD-10G Recommendation (E//
4.1.05 Only)
4.1.06 Feeder should be traced for Swap / Cyclic Swap / Proper Mapping (FDD/TDD/3G)

5. Media Details
5.1.01 Type of Media
5.1.02 BW Provisioned
5.1.03 QOS Implementation as per guideline
6. Clock
6.1.01 BTS Clock Configuration-Primary

6.1.02 BTS Clock Configuration-Secondary

In case FDD installation of existing TDD site, FDD should be syncronized with GPS
6.1.03
only.
7. RF Media used
7.1.01 CPRI/Feeder Length Sec-1
7.1.02 CPRI/Feeder Length Sec-2
7.1.03 CPRI/Feeder Length Sec-3
7.1.04 CPRI/Feeder Length Sec-4
7.1.05 CPRI/Feeder Length Sec-5
7.1.06 CPRI/Feeder Length Sec-6
8. Antenna System Details
Item List- Only for new installation
8.1.01 Antenna Type
8.1.02 Antenna Type
8.1.03 Antenna Quantity
8.1.04 Antenna Height (AGL)
8.1.05 Azimuth
8.1.06 Electrical Downtilt
8.1.07 Mechanical Downtilt
8.1.08 TMA/Combiner/Duplexer/Triplexer
8.1.09 Obstructions if any ( Optimization purpose)
8.1.10 TX Power ( On Top of BTS Cabinet )
FDD/TDD Antenna should be in same direction & no Height / Azimuth /Tilt
8.1.11
missmatch
Antenna Clamp should not be blocked to allow Antenna for proper optimization
8.1.12 (+/-30 Degree)

8.1.13 Antenna Clamp should not be damaged/Up Tilted

9. Cable Return loss, Cable Loss & VSWR Measurements : (<1.5)


Sector/ Cell
9.1.01 TXRX-1
9.1.02 TXRX-1
9.1.03 TXRX-1
9.1.04 TXRX-1
9.1.05 Path Imbalance for FDD / TDD Ports
10. Weather Proofing
Sector/ Cell
10.1.01 Weather proofing on all joints
Activity
11. Active Alarm
11.1.01 Active alarm on site (Critical, Major, Minor or Warning)
11.1.02 Any fluctuating alarm in last 24 hours

11.1.03 Last 24 Hr Alarm (Sync/GPS/QA Alarm)


12. Labelling done for all BTS and TX equipments Installed (Yes/No)
12.1.01 For All BTS Cabinet
12.1.02 For all Cables & Accessories
12.1.03 For Antenna
12.1.04 Labeling of DDF modules is done according to specifications. (External alarm
number marking on Wire & index of alarms stick beside DDF Box).
12.1.05 For TMA's/ Duplexer/Combiner/Triplexer
12.1.06 For Indoor Unit
12.1.07 For Outdoor Unit
13. BTS Infra Alarm Verification (2G/SRAN/ Standalone sites) on actual basis
13.1.01 Site Electrified
13.1.02 DG Fails to Start
13.1.03 Rectifer Fail
13.1.04 Mains Fail
13.1.05 High Temperature
13.1.06 Site on DG
13.1.07 Site on Battery
14-Site clean
14.1.01 Site is cleaned properly & housekeeping is done.
14.1.02 Any project left over material lying at site
14.1.03 Site access is safe and as per OHS
14.1.04 EMF Signage Board
15. CATS Lables (Y/N)
16. AT Doc uploaded to Bulls Eye (Y/N)

*Kindly mention NA where ever planned values is not required.


Wherever NA is not applicable, Yes/No to be filled in Actual Column

Signoff :
BSS Manager:-MOHAMMAD SHAIF
Date :
Mobile Number:
OEM to fill details
UoM Planned* Actual

Yes/No Yes Yes


Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes

Model FXEF FXEF


Number 2 2
Model FSMF FSMF
Number 1 1
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes

Yes/No NO NO
Yes/No Yes Yes
Yes/No NO NO
Yes/No Yes Yes
Number NA NA
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No NA NA
Yes/No NO NO

Yes/No Yes Yes


Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes

ATM/IP/Media IP IP
Mbps/Gbps Mbps Mbps
Yes/No Yes Yes
2G 3G FD TD SRAN
GPS/IP/Top/TDM/NTP TOP

GPS/IP/Top/TDM/NTP IP

Yes/No Yes
2G 3G FD/L1800 TD SRAN
Mtr 50
Mtr NA
Mtr NA
Mtr NA
Mtr NA
Mtr NA

Sector 1 Sector 2 Sector 3


Planned Actual Planned Actual Planned
Model ANDREW ANDREW ANDREW ANDREW ANDREW
Part Code 4 PORT 4 PORT 4 PORT 4 PORT 4 PORT
Number 1 1 1 1 1
Mtr 34 34 34 34 34
Degree 70 70 245 245 350
Degree 1 1 1 1 1
Degree 1 1 1 1 1
Number NA NA NA NA NA
Yes/No NO NO NA NA NA
dB NA NA NA NA NA

Yes/No NA NA NA NA NA

Yes/No NA NA NA NA NA

Yes/No NA NA NA NA NA

Sector 1 Sector 2 Sector 3 Sector 4 Sector 5


Actual Actual Actual Actual Actual
Value NA NA NA NA NA
Value NA NA NA NA NA
Value NA NA NA NA NA
Value NA NA NA NA NA
<=2 dB NA NA NA NA NA

Sector 1 Sector 2 Sector 3 Sector 4 Sector 5


Yes/No Yes Yes Yes
Planned* Actual

Yes/No Yes Yes


Yes/No Yes Yes

Yes Yes

Yes/No Yes Yes


Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No NA NA
Yes/No No No
Yes/No Yes Yes

Yes/No Yes Yes


Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes
Yes/No Yes Yes

Yes/No Yes Yes


Yes/No Yes Yes
Yes/No Yes Yes

Yes/No Yes Yes


Yes/No Yes Yes
Project Manager:- VIDYANSHU SUMIT
Date :
Mobile Number: 9934940538
MS Remarks ( Ok/ Punch Point Details)
MS Remarks ( Ok/ Punch Point Details)

MS Remarks ( Ok/ Punch Point Details)

Sector 3 Sector 4 Sector 5 Sector 6


Actual Planned Actual Planned Actual Planned Actual
ANDREW NA NA NA NA NA NA
4 PORT NA NA NA NA NA NA
1 NA NA NA NA NA NA
34 NA NA NA NA NA NA
350 NA NA NA NA NA NA
1 NA NA NA NA NA NA
1 NA NA NA NA NA NA
NA NA NA NA NA NA NA
NA NA NA NA NA NA NA
NA NA NA NA NA NA NA

NA NA NA NA NA NA NA

NA NA NA NA NA NA NA

NA NA NA NA NA NA NA

Sector 6 MS Remarks ( Ok/ Punch Point Details)


Actual
NA
NA
NA
NA
NA

Sector 6 MS Remarks ( Ok/ Punch Point Details)

MS Remarks ( Ok/ Punch Point Details)


Insta
2. BBU Installation Showing Labeling,
1. OD BTS SHOWING Proper Routing & Grounding

7. DCDB Open With Labelling 8. DCDB Closed With Labelling

NA

GPS
Installation Snap
3. System Grounding With Labelling 4. Open RF Module End Labeling

NA

9.GSM Antenna with Weather-Proofing kit 10. OVP INSTALLATION


5. Closed RF Module End Labeling 6. Rf Module Groundig With Labelling

11. Full Tower 12. SITE IS CLEAN