Вы находитесь на странице: 1из 3

DAILY ACTITVITY ON DATED: 02.10.

2019
IN RESPECT OF ASSET MANAGEMENT/ GSO (SOUTH) CIRCLE NTDC
JAMSHORO.
GRID STATION

S# STATION DESCRIPTION OF WORK TEAM DEPUTED DURATION REMAR


OF WORK KS
1. 500kV G/S Dadu
Mr. Narender Kumar
Cleaning of MK Boxes of 132kV AE(M) 9:30 HRs
Switchyard. Mr. Khalid (FM) and
maintenance team

1.Check and maintain


water level in cells and put
battery charges on boost
after opening vent. 09:00 Hrs
2. A.E (M) along with his
220kV G/S Jhampir 2.Cleaning of of cells and
team
application of petroleum
jelly on terminal
3.Phase marking in
switchyard
3. Annual maintenance and testing of Maintenance team
500kV C.B B1Q2 09:20 Hrs
500kV G/S
Jamshoro

4. 220kV G/S 1. Cleaning of all control panels A.E (M ) along with his
T.M.Khan Hyd 2. cleaning ofall relay panels of team
9.30 Hrs
relay room
3. Rooting out wild grass.
5. Visual inspection of switchyard
220kV G/S Hala Mr. Mutiullah A.E (M) 9:30 Hrs
maintenance of battery bank No.
Road Hyderabad with his Team
03
6. 500kV G/S NKI Washing/cleaning of
Karachi bay equipment of Maintenance team 09:30Hrs
500kV Hub – NKI
7 XEN 500kV (P&I) Tracing grounding
Division Jamshoro cable of synchronize 10:30 Hrs
A.E (P&I)
panel of 500kV
Jamshoro – NKI S/R
TRANSMISSION LINE

S# T/Line Description of TEAM DEPUTED DURATIO REMARKS


work N OF
WORK
1 500kV Hub – NKI Washing of disc NKI Sub Division Karachi 9:30
insulators
67,68,69,70

2 500kV PortQasim – Dadu Installation of Sub division Dadu 9:30


missing braces
at Location No.
215 & 216

3. 500kV CPHGC – Jamshoro Tree and bush Cum Store Sub – Division 9:30
cutting location
No.
270,271,272,27
5,275

Installation of A.E (T) along with his team 10:00 Hrs


4. missing braces
220kV Jamshoro – T.M.Khan Road
circuits on 124,125,
126