Вы находитесь на странице: 1из 8

FiberGen BOM

Vendor Name: Fiberhome


Area: NORTH LUZON
Project: FTBTS
Site Name: N3743 SUN LUBA STA. CRUZ
PO #:

ACTIVITIES UOM
CABLE WORKS: Aerial Cable Layout (Supply, Installation, and Testing)
FOC Type: Figure 8
24F - Semi Dry (3 Buffers; 8-Fibers) Meter
24F - 4 Buffers; 6-Fibers Meter
48F Meter
72F Meter
144F Meter
FOC Type: Traditional
24F Meter
48F Meter
72F Meter
144F Meter
216F Meter
CABLE WORKS: Underground Cable Installation (Supply, Installation, and Testing)
FOC Type: Traditional
24F Meter
48F Meter
72F Meter
144F Meter
216F Meter
FOC Type: Armoured
144F Meter
216F Meter
CABLE WORKS: Tie-Cable (Supply, Installation, and Testing)
FOC Type: Traditional Indoor Cable
72F Meter
144F Meter
216F Meter
CIVIL WORKS: Trenching and Ducts Laying
Shallow Trench (Type 1: Reinforced Concrete Encased, Cast-In-Place, 1200mm - 1499mm)

Page 1 BOQ TEMPLATE - NBPRM


ACTIVITIES UOM
HDPE Pipe 50mm Ø
2 Meter
4 Meter
Shallow Trench (Type 2: Reinforced Concrete U-Frame, Pre-Cast, 1200mm - 1499mm)
HDPE Pipe 50mm Ø
2 Meter
4 Meter
Shallow Trench (Type 3: Reinforced Concrete Encased, 700mm)
PVC Pipe 114mm Ø
1 Meter
2 Meter
Shallow Trench (Type 4: Reinforced Concrete Encased, 400mm)
GI Pipe 114mm Ø, Sched 40
1 Meter
2 Meter
Standard Trench (1.5m)
HDPE Pipe 50mm Ø
2 Meter
4 Meter
CIVIL WORKS: Trenchless Ducts Laying
Two (2) HDPE Pipe 50mm Ø (>100m) Meter
Two (2) HDPE Pipe 50mm Ø (<100m) Meter
Four (4) HDPE Pipe 50mm Ø (>100m) Meter
Four (4) HDPE Pipe 50mm Ø (<100m) Meter
CIVIL WORKS: Microtrenching (Including Supply and Installation of Micro Duct and Micro Fiber)
2-Way micro Duct (27.4mm Height, 14.7 Width) - with 24F micro Fiber Meter
2-Way micro Duct (27.4mm Height, 14.7 Width) - with 24F micro Fiber (3 Buffers; 8 Fibers) Meter
2-Way micro Duct (27.4mm Height, 14.7 Width) - with 48F micro Fiber Meter
2-Way micro Duct (27.4mm Height, 14.7 Width) - with 72F micro Fiber Meter
2-Way micro Duct (27.4mm Height, 14.7 Width) - with 144F micro Fiber Meter
CIVIL WORKS: Service Box
Reinforced Concrete Manhole -(L:1.2m,W:1.2m,H:1.5m) Unit
CIVIL WORKS: Concrete Pole (Supply and Installation)
New Concrete Pole (7.5m) Unit
New Concrete Pole (9.14m) Unit
New Concrete Pole (10.67m) Unit
New Concrete Pole (12.19m) Unit
CIVIL WORKS: Riser Installation (Supply and Installation)
GI Pipe (114mm Ø x 3m) - Vertical Unit
Two (2) HDPE Pipe 50mm Ø - Lateral Conduit Meter
CIVIL WORKS: Bridge Attachment (Supply and Installation)
GI Pipe 114mm Ø Meter

Page 2 BOQ TEMPLATE - NBPRM


ACTIVITIES UOM
CIVIL WORKS: Surface Restoration
Open Trench
Concrete (0.23 m thk.) Meter
Asphalt (0.10 m. thk.) Meter
Concrete Sidewalk/Driveway (0.10 m thk) Meter
Microtrench
Concrete (0.23 m thk.) Meter
Asphalt (0.10 m. thk.) Meter
Concrete Sidewalk/Driveway (0.10 m thk) Meter
HDD - Entry/Exit Points
Concrete (0.23 m thk.) Square-Meter
Asphalt (0.10 m. thk.) Square-Meter
Concrete Sidewalk/Driveway (0.10 m thk) Square-Meter
Splice Closure (Supply, Installation, Splicing, and Testing)
Joint Installation and Connection (24:24) Unit
Joint Installation and Connection (48:48) Unit
Joint Installation and Connection (72:72) Unit
Joint Installation and Connection (144:144) Unit
Joint Installation and Connection (216:216) Unit
Splitter Installation and Connection (1:8) - Input: Fused, Output: Fused Unit
Splitter Installation and Connection (1:4) - Input: Fused, Output: Fused Unit
Splitter Installation and Connection (1:8) - Input: Fused, Output: Connectorized Unit
Splitter Installation and Connection (1:4) - Input: Fused, Output: Connectorized Unit
Optical Distribution Frame (Supply, Installation, Splicing, and Termination)
Rack Mounted
24F Unit
48F Unit
72F Unit
144F Unit
216F Unit
Wall Mounted
24F Unit
48F Unit
72F Unit
19-inch Open Bay Rack (Supply and Installation)
New 19-inch open bay rack Unit
BUILDINGS: FTTU (Fiber-To-The-Unit) Implementation
FTTU Implementation for 400 Units Below Line/Port
FTTU Implementation for 400 Units Above Line/Port
In-Building Conduit (Supply and Install) Meter
EXTRA:
Raising of Manhole Frame and Cover (Supply and Install) Unit

Page 3 BOQ TEMPLATE - NBPRM


ACTIVITIES UOM
Pushrodding and Mandrelling
Main Duct Meter-Run
Sub Duct Meter-Run

Authorized PLDT signatory Authorized VENDO

__________________________________ _______________
SIGN OVER PRINTED NAME SIGN OVER PRINT

Page 4 BOQ TEMPLATE - NBPRM


Date:________________
en BOM

QUANTITY

151

Page 5 BOQ TEMPLATE - NBPRM


QUANTITY

Page 6 BOQ TEMPLATE - NBPRM


QUANTITY

Page 7 BOQ TEMPLATE - NBPRM


QUANTITY

Authorized VENDOR signatory

__________________________________
SIGN OVER PRINTED NAME

Page 8 BOQ TEMPLATE - NBPRM

Вам также может понравиться