Bid Security in the prescribed form, amount and validity period; http://philgeps.gov.ph JVA, if applicable; The ABC shall be the upper limit or ceiling for acceptable bid price. There shall be no lower limit or floor on the amount of the award. Statement of ALL Ongoing Government and Private Contracts; Legal Requirements - licenses, certificates, permits, and agreements submitted by bidder The bidder shall bear all costs associated with the preparation and submission of his bid, and the Procuring Entity will in no case be responsible or liable for those costs, regardless of the conduct or outcome of the bidding process; Prospective bidders may request for clarification(s) on and/or interpretation of any part of the Bidding Documents. Such a request must be in writing and submitted to the Procuring Entity at least ten (10) c.d. before the deadline for the submission and receipt of bids. If the BAC determines that the LCB passes all the criteria for post- qualification, it shall declare the said bidder as LCRB and recommend to the HOPE the award of contract to the said bidder at its submitted bid price or calculated bid price, whichever is lower. PCAB License and Registration; Project Requirements, which shall include the following: Statement of SLCC; Bid Evaluation Decisions of the BAC at any stage of the procurement process may be questioned by filing a request for reconsideration within 3 c.d. upon receipt of written notice or upon verbal notification. Pre-bid Conference Failure to submit any of the post-qualification requirements on time shall disqualify a bidder for award. Within 10 c.d. from receipt of NOA the winning bidder shall enter into contract with the Procuring Entity and post the requried Performance Security "No Contact Rule" Protests shall be resolved strictly on the basis of the records of the BAC. The HOPE shall resolve the protest within 7 c.d. from receipt thereof. In case of approval, the HOPE shall immediately issue the Notice of Award (NOA) to the LCRB Unsealed or unmarked bid envelopes shall be rejected. Bidder, by the act of submitting a bid, shall be deemed to have inspected the site, determined the general characteristics of the contract works and the conditions for the Project and examine all instructions, forms, terms, and project requirements in the bid docs. The Procuring Entity will accept bids only from those that have paid the applicable fee for the Bidding Documents at the office indicated in the Invitation to Bid. Dir. Renato de Vera, MNSA Latest income and business tax returns; and The first envelope shall contain the following technical information/documents, at the least: (Procurement of Infra) Other appropriate licenses and permits required by law and indicated in the bidding documents. The BAC shall open the first envelope in public to determine each bidder's compliance with the documents required. The BAC shall decide on the request for reconsideration within 7 c.d. from receipt thereof. The bidder shall not be allowed to submit additional documents to correct any defects in the bid submitted. In the event the request for reconsideration is denied by the BAC, the decision may be protested in writing to the HOPE within 7 c.d. from receipt of decision, by filing a verified position paper accompanied by the payment of non-refundable protest fee. "Bidders shall submit their bids through their duly authorized representative using the forms specified in the Bidding Documents in two (2) separate sealed bid envelopes, and which shall be submitted simultaneously. The first shall contain the technical component of the bid, including the eligibility requirements under Section 23.1 of th(e) IRR for the procurement of Goods and Infrastructure Projects, and the second envelope shall contain the financial component of the bid." "All bidders shall upload and maintain in PhilGEPS a current and updated the following Class "A" eligibility documents": Registration Certificate Mayor's/Business Permit Tax Clearance PCAB license and registration and Audited Financial Statements "The Bidding Documents shall be prepared by the Procuring Entity following the standard forms and manuals prescribed by the GPPB." Bidder's stated competence and experience, and its key personnel to be assigned to the project Post-qualification involves verification, validation, and ascertainment of all statements made and documents submitted by the bidder with the LCB using non-discretionary criteria, which shall consider, but not limited to the following: PLATINUM Membership Bidding documents shall be the latest edition prescribed by the GPPB (5th Ed.); Non-attendance of the bidder will in no way prejudice its bid; however, the Bidder is expected to know the changes and/or amendments to the bidding documents as recorded in the minutes of the pre-bid conference and the Supplemental/Bid Bulletin. Bid Submission The bidder or their duly authorized representatives may attend the opening of bids. Managing Government Procurement Sole responsibility of the bidder to determine and to satisfy itself as to all matters pertaining to the Project, including: (a) location and nature of the project; (b) climatic conditions; (c) transportation facilities; (d) nature and condition of the terrain, geological conditions at the site, communication facilities, requirements, location and availability of construction aggregates and other materials, labor, water, electric power and access roads; and (d) other factors that may affect the cost, duration and execution or implementation of the contract, project or work. Technical Requirements - to determine compliance with the requirements, including: Organizational chart for the contract to be bid; Failure of the contractor to commence repair works on ongoing contracts within 7 c.d. and to complete them within 30 c.d. after receipt of the Procuring Entity's notice of defects and deficiencies; Before submitting their bids, the Bidders are deemed to have become familiar with all existing laws, decrees, ordinances, acts and regulations of the Philippines which may affect the contract in any way. Bidders are encouraged to attend the pre-bid conference to ensure that they fully understand the Procuring Entity's requirements. Protest Mechanism __________ BAC evaluates the financial bid to determine the LCB; Original copy of the bid form shall be typed or written in ink and shall be signed by the bidder or its duly authorized representative. http://gppb.gov.ph If the BAC determines the bidder with the LCB fails the criteria for post-qualification, it shall immediately notify said bidder in writing of its post-disqualification and the grounds for it. Preparation and Submission of Bidding Documents PhilGEPS Certificate of Registration and membership (Platinum); Verification of availability and commitment, and/or inspection and testing for the required capacities and operating conditions, of equipment units to be owned/leased/under purchase by the bidder for use in the contract under bidding, as well checking the performance of the bidder in its ongoing government and private contracts, if any of the ongoing contracts shows: Omnibus Sworn Statement The Procuring Entity shall issue the Notice to Proceed (NTP) with the copy or copies of the approved contract to the successful bidder within seven (7) c.d. from approval of contract. BAC considers computational errors and omissions to enable proper comparison of all eligible bids; (Blue Membership is no longer acceptable) In case of disapproval of award, it shall be based only on valid, reasonable and justifiable grounds under Section 41 of the IRR or RA 9184. Procuring Entity shall not assume any responsibility regarding erroneous interpretations or conclusions by the prospective or eligible bidder out of the data furnished by the procuring entity. Negative slippage of at least 15% in any one project or a negative slippage of at least 10% in each of 2 or more contracts; Within 3 c.d. from the issuance of BAC Resolution recommending award of contract to the LCRB, the BAC shall notify all other bidders, in writing of its recommendation The bidder with the LCB shall be notified by the BAC to submit the following additional documents within five (5) c.d. from receipt of notice: Failure of the contractor to commence repair works on contracts with pending certificates of acceptance within 30 c.d. and complete them within 90 c.d. after receipt of the Procuring Entity's notice of defects and failures; or Decisions of the BAC amending any provision of the bidding documents shall be issued in writing through a Supplemental/Bid Bulletin at least seven (7) c.d. before the deadline for submission of bids. Bidder's responsibility to carefully examine all of the bidding documents; Financial Requirements - bid price of the bidder, or the bidder's NFCC SPECS It shall be the responsibility of all Bidders who have properly secured the Bidding Documents to inquire and secure Supplemental/Bid Bulletin that may be issued by the BAC. Substandard quality of work as per contract plans and specifications or unsatisfactory performance of the contractor's obligations at the time of inspection. The BAC shall respond to such request by issuing a Supplemental/Bid Bulletin, to be made available to all those who have properly secured the Bidding Documents, at least seven (7) c.d. before the deadline for submission and receipt of bids. Post-Qualification List of contractor's major equipment units, which are owned, leased and/or under purchase agreements, supported by proof of ownership or certification of availability of equipment from the equipment lessor/vendor for the duration of the project; NFCC Computation; List of contractor's personnel to be assigned to the contract to be bid, with their complete qualification and experience data; The HOPE shall notify the BAC and the bidder in writing of such decision and the grounds for it. A request for reconsideration may be filed by the bidder with the HOPE within 3 c.d. from receipt of notice of disapproval. PhilGEPS Registration BAC evaluates all bids on an equal footing to ensure fair and competitive bid comparison. All bidders are required to include the cost of all taxes, and other fiscal levies and duties which shall be itemized in the bid form and reflected in the detailed estimates. Court action may be resorted to only after the protests shall have been completed, i.e., resolved by the HOPE with finality. DBM-Mimaropa