protection shall be proposed. WEEP HOLES @ 1000 MM C/C 10 MM GAP 10 MM GAP AT 7.5 M FROM AT 10 M FROM CENTERLINE CENTERLINE CLIENT : PROJECT : AUTHORITY ENGINEER SAFETY CONSULTANTS: PROOF CONSULTANTS: M/S Professional TITLE : Rehabilitation and Up gradation of existing Two lane M/S ARKITECHNO Civil Infra Pvt Ltd to four lane standards from Talcher to End of Consultants (India) Ltd. Kamakhyanagar Bypass Section (CH. 8+500 to 14+800) of NH-23 (New NH 149) and (CH. 301+474 to EPC CONTRACTOR : PREPARED BY : DRG. NO. : 336+900) of NH-200 (New NH-53) in the state of National Highway Authority Odisha on EPC Mode Monte Carlo Limited of India REVISION :