Вы находитесь на странице: 1из 1

The difference in the level is more

than 1m, Hence suitable kerb


protection shall be proposed.
WEEP HOLES
@ 1000 MM C/C
10 MM GAP 10 MM GAP
AT 7.5 M FROM AT 10 M FROM
CENTERLINE CENTERLINE
CLIENT : PROJECT : AUTHORITY ENGINEER SAFETY CONSULTANTS: PROOF CONSULTANTS: M/S Professional TITLE :
Rehabilitation and Up gradation of existing Two lane M/S ARKITECHNO Civil Infra Pvt Ltd
to four lane standards from Talcher to End of Consultants (India) Ltd.
Kamakhyanagar Bypass Section (CH. 8+500 to
14+800) of NH-23 (New NH 149) and (CH. 301+474 to EPC CONTRACTOR : PREPARED BY :
DRG. NO. :
336+900) of NH-200 (New NH-53) in the state of
National Highway Authority
Odisha on EPC Mode Monte Carlo Limited
of India REVISION :