Вы находитесь на странице: 1из 10

REPUBLIC OF THE PHILIPPINES

T UM ABIE NE DE SIG N | AR CH ITE CT UR E


TABLE OF CONTENTS DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
" DE SI GN IN G DU RA BI LI TY IN A ES TH ET IC "

OFFICE OF THE BUILDING OFFICIAL

SHT. NO. CONTENTS

A R C H I T E C T U R A L DISTRICT/CITY/MUNICIPALITY

PERSPECTIVE
A1 SITE DEVELOPMENT PLAN
VICINITY MAP

GROUND FLOOR PLAN


REFLECTED CEILING PLAN
A2 FRONT, & REAR ELEVATION
TYP. CEILING DETAIL

ROOF DECK PLAN


RIGHT & LEFT-SIDE ELEVATIONS
A3 SCHEDULE OF DOORS & WINDOWS LAND USE AND ZONING
CROSS SECTION
LONGITUDINAL SECTION

TEMPORARY PENTHOUSE DETAIL


BLOW-UP TOILET DETAIL (MALE)
BLOW-UP TOILET DETAIL (FEMALE)
A4 TYP. OFFICE CUBICLE DETAIL
KITCHEN SECTION DETAIL
MOVABLE PARTITION DETAIL

S T R U C T U R A L

FOUNDATION PLAN LINE AND GRADE


DECK FRAMING PLAN
S1 TYP. RAMP DETAIL
STIFFENER-MASONRY CONNECTION DETAIL
TYP. 2-WAY SLAB DETAIL

STAIRWAY DETAIL
SPOT DETAIL
SCHEDULE OF BEAMS, COLUMNS, & FOOTINGS
TYP. COLUMN DETAIL
S2
A PERSPECTIVE CONC. CANOPY DETAIL
TYP. BEAM DETAIL
WF-01 DETAIL
N O T D R A W N T O S C A L E
TYP. RAILING DETAIL ARCHITECTURAL

P L U M B I N G
20.87
WASTE DISPOSAL PLUMBING LAYOUTS
P1
2.78

CANOPY LINE WATER SUPPLY PLUMBING LAYOUTS

CANOPY LINE W A L K W A Y W A L K W A Y CANOPY LINE


N P2
WASTE DISPOSAL ISOMETRIC VIEW
SEPTIC VAULT DETAIL
CATCH BASIN DETAIL
CANOPY LIN E

WATER SUPPLY ISOMETRIC VIEW


P A R T I T I O N

P3 GENERAL NOTES
STRUCTURAL
LEGEND
F E N C E
W A L K W A Y
Y

PROJECTOR SCREEN

PROJECTOR SCREEN

MATERIAL SPECIFICATIONS
T R A I N I N G H A L L 0 1 T R A I N I N G H A L L 0 2
A

M O V A B L E

E L E C T R I C A L
W

THE SITE LIGHTING OUTLET LAYOUT


CANOPY LINE

E R

CONVENIENCE OUTLET LAYOUT


ELECTRICAL LOAD SCHEDULE
E

E1
C O V E R E D

PANEL BOARD DIAGRAM


P E R I M E T

A U D I O WAITI NG AREA
INFORMATION
R O O M PWD
V

DESK
(TOILET)
KITCHEN GENERAL NOTES
ELECTRICAL SYMBOLS
C AN OPY LI N E
I

UP
H A L L W A Y
L O U N G E
N O T H I N G F O L L O W S SANITARY/PLUMBING
R

O F F I C E
TOILET AREA TOILET AREA
A R E A (FEMALE)
D

(MALE)

STAIRWAY
MAIN ENTRY
1.50
1.70
CAN OP Y LI N E

RAMP P O R C H RAMP
2.24

CANOPY LIN E

G U A R D
8.54

H O U S E
ELECTRICAL
6.02

MAIN ENTRY P E R I M E T E R F E N C E

M A I N R O A D

SITE DEVELOPMENT PLAN A VICINITY MAP


A N O T D R A W N T O S C A L E
MECHANICAL
SCALE: 1:150mts.

T
"CONSTRUCTION OF CSC RO-VIII HUMAN
RESOURCE TRAINING CENTER PHASE-01" A 1
ARIEL M. JAVIER EDGAR B. TABACON VICTORIA F. ESBER 1 10
SUPERVISING HR SPECIALIST REGIONAL DIRECTOR - DPWH VIII REGIONAL DIRECTOR - CSC VIII
RESIDENT PROJECT COORDINATOR/IMPLEMENTOR
A B B' C C' D E
17.67
5.06 3.77 3.72 5.11

A B B' C C' D E 3.58 1.49 1.78 3.34

SEC
17.67 LONG

5.06 3.77 3.72 5.11 BALCON Y LI N E

3.58 1.49 1.78 3.34

SEC

2.40

2.40
LONG DL DL

CANOPY LINE CAN OPY LIN E CANOPY LINE

60x60cm FLOOR TILES DL CL-04 DL

TEXTURED
1.50 3

3.00
2.40
CANOPY LINE W A L K W A Y W A L K W A Y CANOPY LINE

BALCON Y LI N E
1.50

0.80
PLANT BOX PLANT BOX PLANT BOX PLANT BOX CL-04
3 1.50
CL-01 CL-01 CL-01 CL-01

CANOPY LINE

P A R T I T I O N

6.75

6.75
60x60cm FLOOR TILES
GLAZED (WHITE) ACCORDION TYPE
MOVABLE PARTITION
(SOUND PROOF)

PROJECTOR SCREEN

PROJECTOR SCREEN
1.20

CL-01 CL-01 CL-01 CL-01


6.75

6.75
T R A I N I N G H A L L 0 1 T R A I N I N G H A L L 0 2
SEC

M O V A B L E
60x60cm FLOOR TILES CROSS

BALCONY LIN E
GLAZED (WHITE)

13.00
13.30
2
CL-04
SEC CL-02

1.48
CROSS

1.98
PL
CANOPY LINE

CM CM CM CM

13.00
13.30

CANOPY LINE
CL-02 CL-02
2 CL-03 CL-03

CANOPY LINE
DL CM
1.48

A U D I O WAITING AREA PL PL PL DL
INFORMATION

1.98

1.35
R O O M PWD CL-03

2.85
DESK
KITCHEN CL-01

6.25
(TOILET)

6.55
CL-01
60x60cm FLOOR TILES

CANOPY LINE
PL PL PL
CM CM
1.50

GLAZED (WHITE) CL-02 CL-02


SEE STAIR RAILING

1.20

1.35
DETAILS H A L L W A Y
2.85

UP
L O U N G E CL-03

6.25

2.92
STAIRWAY
6.55

PL PL

2.23
O F F I C E 40x40cm FLOOR TILES CL-03
1.20 TOILET AREA
A R E A TOILET AREA SEMI-GLAZED
(FEMALE)
(MALE) 1

2.92
CANOPY LINE CAN OPY LIN E
2.23

STAIRWAY DL CL-04 DL CANOPY LINE

1.80
1.50
MAIN ENTRY
1
CANOPY LINE
PLANT BOX CANOPY LINE
60x60cm FLOOR TILES

1.80
TEXTURED
1.50

RA MP P O R C H SEE RAMP RAILING

2.52
RAMP
2.22

DETAILS
CANOPY LINE 2.58 2.53
0.72

0.72
3.30 4.42 4.84 5.11

LEGEND: 17.67

2.58 2.53 CL-01- DROP CEILING 70cm SUSPENDED FROM BOT. OF SLAB w/ 1 4" THK. MARINE PLYWOOD ON A 2" X 2" CEILING JOIST spaced
3.30 4.20 5.06 5.11 @ 40cm O.C BOTH WAYS & 2" WD. CORNICE ALL AROUND.
17.67
CL-02- DROP CEILING 90cm SUSPENDED FROM BOT. OF SLAB w/ 1 4" THK. MARINE PLYWOOD ON A 2" X 2" CEILING JOIST spaced
@ 40cm O.C BOTH WAYS & 2" WD. CORNICE ALL AROUND.

CL-03- DROP CEILING, ALIGNED TO BEAM w/ 1 4" THK. MARINE PLYWOOD ON A 2" X 2" CEILING JOIST spaced @ 40cm O.C BOTH
WAYS & 2" WD. CORNICE ALL AROUND.
0.40 0.40
A GROUND FLOOR PLAN CL-04- FLAT CEILING - PLASTERED BOT. OF SLAB FINISH.
SCALE: 1:100mts.
GRO UND FL OO R
A REFLECTED CEILING PLAN 2"x2" CEILING JOIST
SCALE: 1:100mts.

0.40
spaced @ 40cm O.C
both ways
APEX LINE APEX LINE
7050 7050

TEMPORARY PENTHOUSE FOR TEMPORARY PENTHOUSE FOR

0.40
STAIRWAY STAIRWAY
2.60

2.60

A B B' C C' D ROOF DECK SLAB MIXED w/


E E ROOF DECK SLAB MIXED w/
D C' C B' B A
WATERPROOFING COMPOUND WATERPROOFING COMPOUND
R O O F D E C K A R E A R O O F D E C K A R E A
ROOF DECK LINE ROOF DECK LINE
0.20

4.20 4450 4450


0.60

CONCRETE CANOPY 01 3.00


RECESSED PLASTER FINISH w/ HOR.
6.00 6.00
PLAN
GROOVES spaced @ 0.30m CONC. SLAB
1.80

0.80
F F
1.20 STAGGERED 1.50 1.50 0.80
TOP OF SLAB/BEAM
4.00

4.00

CONC. CANOPY
4.45

4.45
0.50

3.40

2"x2" HANGER

*VARIES
2"x2" CEILING JOIST
spaced @ 40cm O.C
1.50

P O R C H both ways
FIN. FLOOR LINE P L A N T B O X P L A N T B O X FIN. FLOOR LINE
(ELEV. 0.40m) BOT. OF CEILING
0.50

450 450
0.70
0.45

0.45

1
PLASTER FINISH w/ HOR. GROOVES 0 0 4"thick MARINE PLYWOOD w/
STONE CLADDING WALL FINISH NATURAL GRADE LINE STONE CLADDING WALL FINISH NATURAL GRADE LINE
spaced @ 0.30m STAGGERED SECTION 2" WD CORNICE ALL AROUND

A FRONT ELEVATION A REAR ELEVATION A TYP. CEILING DETAIL


SCALE: 1:100mts. SCALE: 1:100mts. SCALE: 1:20mts.

T
"CONSTRUCTION OF CSC RO-VIII HUMAN
RESOURCE TRAINING CENTER PHASE-01" A 2
ARIEL M. JAVIER EDGAR B. TABACON VICTORIA F. ESBER 2 10
SUPERVISING HR SPECIALIST REGIONAL DIRECTOR - DPWH VIII REGIONAL DIRECTOR - CSC VIII
RESIDENT PROJECT COORDINATOR/IMPLEMENTOR
3.60
1.50 2.10
0.70 0.70
1.50 0.90 0.80 0.80

0.40

0.40
F F F F 0.70 0.70 0.80 0.70 0.70
0.70
0.60

A B B' C C' D E

2.50
17.67

1.90
F F

2.10

2.10

2.10

2.10

2.10

1.55
5.06 3.77 3.72 5.11

1.75
3.58 1.49 1.78 3.34

SEC
LONG

BALCONY LINE

0.20

0.20
FIN. FLR. LINE FIN. FLR. LINE FIN. FLR. LINE FIN. FLR. LINE FIN. FLR. LINE FIN. FLR. LINE

DOOR 01 DOOR 02 DOOR 03 DOOR 04 DOOR 05 DOOR 06


TYPE 2.50m x 3.60m ALUMINUM FRAME TYPE TYPE 2.10m x 0.90m ALUMINUM FRAME TYPE 2.10m x 0.80m ALUMINUM FRAME TYPE TYPE
2.40

2.40
2.10m x 1.50m DOUBLE FLUSH 1/4 2.10m x 0.70m PANEL DOOR w/ 1.55m x 0.60m FLUSH DOOR
CANOPY LINE CANOPY LINE DOUBLE GLASS DOOR with FIXED LITE DOOR w/ ACCESSORIES GLASS DOOR GLASS DOOR ACCESSORIES QTY 3-SET(S)
GLASS QTY 2-SET(S) QTY 3-SET(S) QTY 3-SET(S) QTY 3-SET(S) LOC REFER TO PLANS & ELEVATIONS
CANOPY LINE CANOPY LINE
QTY 1-SET(S) LOC REFER TO PLAN LOC REFER TO PLANS & ELEVATIONS LOC REFER TO PLANS & ELEVATIONS LOC REFER TO PLANS & ELEVATIONS
3 LOC REFER TO PLANS & ELEVATIONS
BALCON Y LI N E

3.00 2.40
2% SLOPE 2% SLOPE 2% SLOPE 2% SLOPE EQ EQ EQ EQ EQ EQ EQ EQ EQ
(MAINTAIN) (MAINTAIN) (MAINTAIN) (MAINTAIN)
1.20 1.20 1.20

0.40

0.40
F F F F F F F F F 0.60 0.60 0.60 0.60 0.60 0.60
1.80
6.75

6.75
EQ EQ

0.40
0.40
1.20

1.20

1.20

1.20
F

2.50

2.50

2.10

2.10

2.10
SEC

1.80

1.70
CROSS

1.20
R O O F D E C K A R E A F F
BALCONY LIN E

13.00
(MAINTAIN)

(MAINTAIN)
2% SLOPE

2% SLOPE
13.30

0.90

0.90

0.90

0.90
2

CANOPY LINE
ROOF DECK SLAB w/ 3-COATS OF

0.20
FIN. FLR. LINE FIN. FLR. LINE STAIR LANDING FLR. LINE FIN. FLR. LINE FIN. FLR. LINE FIN. FLR. LINE
1.48

MULTI-HIGH QUALITY WATERPROOFING

1.98
WINDOW 01 WINDOW 02 WINDOW 03 WINDOW 04 WINDOW 05 WINDOW 06
CANOPY LINE

TYPE 1.60m x 3.00m ALUMINUM FRAME TYPE 1.60m x 2.40m ALUMINUM FRAME TYPE 1.60m x 1.80m ALUMINUM FRAME TYPE 1.20m x 1.20m ALUMINUM FRAME TYPE 1.20m x 1.20m ALUMINUM FRAME TYPE 0.40m x 1.20m ALUMINUM FRAME

CANOPY LINE
SLIDING WINDOW w/ FIXED GLASS SLIDING WINDOW w/ FIXED GLASS AWNING WINDOW w/ FIXED GLASS SLIDING WINDOW FIXED GLASS WINDOW AWNING WINDOW
QTY 1-SET(S) QTY 4-SET(S) QTY 1-SET(S) QTY 1-SET(S) QTY 1-SET(S) QTY 2-SET(S)

1.35
LOC REFER TO PLANS & ELEVATIONS LOC REFER TO PLANS & ELEVATIONS LOC REFER TO PLANS & ELEVATIONS LOC REFER TO PLANS & ELEVATIONS LOC REFER TO PLANS & ELEVATIONS LOC REFER TO PLANS & ELEVATIONS
2.85

6.25
2% SLOPE 2% SLOPE 2% SLOPE
6.55

(MAINTAIN) (MAINTAIN) (MAINTAIN)

TEMPORARY
A SCHEDULE OF DOORS & WINDOWS
PENTHOUSE FOR SCALE: 1:50mts.

2.92
STAIRWAY
2.23

A B' C' D ROOF DECK SLAB w/ 3-COATS OF


E
1 R O O F D E C K A R E A
MULTI-HIGH QUALITY WATERPROOFING
ROOF DECK LINE
CAN OPY LIN E CANOPY LINE
4450

0.60
2% SLOPE CANOPY LINE

1.80
(MAINTAIN) CL-04 CL-01 CL-01 CL-01 CL-01
1.50

CEILING LINE CEILING LINE


CANOPY LINE

4.00
ACCORDION TYPE

4.45

3.40

3.20
MOVABLE PARTITION
(SOUND PROOF)
2.58 2.53
3.30 4.42 4.84 5.11 TRAINING HALL O1 TRAINING HALL O2
FIN. FLOOR LINE
17.67 450

0.45
0
NATURAL GRADE LINE

A ROOF DECK PLAN


SCALE: 1:100mts.
A CROSS SECTION
SCALE: 1:100mts.

APEX LINE APEX LINE APEX LINE


7050 7050 7050
TEMPORARY PENTHOUSE FOR TEMPORARY PENTHOUSE FOR
STAIRWAY STAIRWAY
2.60

2.60

2.60
3 ROOF DECK SLAB MIXED w/
2 1 1 2 3 1 4" WD CONCRETE ZOCALLO 2 3
WALL AROUND STAIRWELL RIM ROOF DECK SLAB w/ 3-COATS OF
WATERPROOFING COMPOUND
R O O F D E C K A R E A MULTI-HIGH QUALITY WATERPROOFING
R O O F D E C K A R E A R O O F D E C K A R E A

0.10
ROOF DECK LINE ROOF DECK LINE ROOF DECK LINE
4450 4450 4450
0.50

0.60
0.60

CL-04 CL-03 CL-02 CL-01 CL-04

STAIR SEE TYP.


LANDING RAILING DETAIL
1"GROOVE
4.00

4.00

4.00
CONC. CANOPY
4.45

4.45

4.45
3.50

3.40
3.40

3.20
3.00
AU D IO
P O R C H FIN. FLOOR LINE P O R C H P O R C H ROOM
TRAINING HALL O1
FIN. FLOOR LINE STORAGE FIN. FLOOR LINE
(ELEV. 0.40m) 450 (ELEV. 0.40m) 450 (ELEV. 0.40m) 450
0.45

0.45

0.45
PLASTER FINISH w/ HOR. GROOVES 0 0 0
STONE CLADDING WALL FINISH NATURAL GRADE LINE STONE CLADDING WALL FINISH NATURAL GRADE LINE NATURAL GRADE LINE
spaced @ 0.30m STAGGERED

A RIGHT-SIDE ELEVATION A LEFT-SIDE ELEVATION A LONGITUDINAL SECTION


SCALE: 1:100mts. SCALE: 1:100mts. 6 6 SCALE: 1:100mts.

T
"CONSTRUCTION OF CSC RO-VIII HUMAN
RESOURCE TRAINING CENTER PHASE-01" A 3
ARIEL M. JAVIER EDGAR B. TABACON VICTORIA F. ESBER 3 10
SUPERVISING HR SPECIALIST REGIONAL DIRECTOR - DPWH VIII REGIONAL DIRECTOR - CSC VIII
RESIDENT PROJECT COORDINATOR/IMPLEMENTOR
P A R T O F H A L L W A Y P A R T O F H A L L W A Y

2.53 2.53 1.51


1.51 0.80 0.23 0.23 0.80
3.78

0.65 1.29 1.04 0.40 1.49 1.49 0.40 0.70 0.70

8"x16"x4" CHB w/ 1" PLASTER BOTH SIDES 8"x16"x4" CHB w/ 1" PLASTER BOTH SIDES
R O O F L I N E R O O F L I N E R O O F L I N E
0.10

0.16
LAVATORY LAVATORY
0.35

0.40

0.40
0.20
0.20
LAVATORY 0.36

TOILET (FEMALE) FLR.


ELEV: 1" LOWER FROM FINISH DRAIN
2" x3" F LY ING RAF T E R TOILET (MALE)

8"x16"x4" CHB w/ 1" PLASTER BOTH SIDES

8"x16"x4" CHB w/ 1" PLASTER BOTH SIDES


( M A L E )
8"x16"x4" CHB w/ 1" PLASTER BOTH SIDES

8"x16"x4" CHB w/ 1" PLASTER BOTH SIDES


FLOOR LINE

( F E M A L E )

3-LAYERS OF 40x40cm VITRIFIED


3-LAYERS OF 40x40cm VITRIFIED

1.76
( g o o d l u m b e r ) ELEV: 1" LOWER FROM FINISH

1.72

0.70
1.76
A R E A
1/ 2" thk x 20cm FIBER
CEMENT BOARD
S L O P E FLOOR LINE
FLR. 40x40cm FLOOR TILES

E
E

WALL TILES SEMI GLAZED


WALL TILES SEMI GLAZED

0.40
DRAIN SEMI-GLAZED
N

N
GA#24 G.I SHEE T

S
40x40cm FLOOR TILES

0.40
I

OF FIC E
R I D G E C A P SEMI-GLAZED 0.60 0.71 0.60

T O I L E T
L

L
L

2.60
3.45

3.45

4.25

4.25

3.45

2.60
U

T O I L E T
URINAL

R
F

F
CORRUGAT ED URINAL
2"THK CONCRETE WALL w/
O

O
2"x3" (good lumber) STUDS

T
2"x3" PURLINS (good

H R
G.I.SHE ET GA#26 10mm RSB spaced @ 0.20m
& GIRT S spaced @ 0.60m 0.13

O
O

O
l umber ) spaced @ 0.40 O.C. both ways & 1"THK

O F
s t a g g e r e d w / 14 " F I B E R S L O P E 0.95
R

OF
0.60M stagger ed

O F
PLASTER BOTHSIDES

1.72
CEMENT BOARD SIDING 0.13

P A R T
o n b o t h s i d e s .

P A R T

P A R T
2"THK CONCRETE WALL w/ FLR. FLR.

0.25
1.25 10mm RSB spaced @ 0.20m DRAIN DRAIN
O.C. both ways & 1"THK 0.34 0.33

0.51
PLASTER BOTHSIDES

0.84
0.84
0.40

0.40
WATER WATER WATER
CLOSET CLOSET CLOSET

0.70

0.60
R O O F L I N E R O O F L I N E R O O F L I N E

0.51
FLR.
DRAIN 0.31 0.53 0.44
2.98 3.78 3.78

0.15
0.08
COLUMN COLUMN

P L A N R O O F P L A N ROO F FRAMI NG P LAN

0.60mx1.20m JALOUSIE
0.55 1.20 0.63 0.63 1.20 0.55
W INDOW w/ BARS
APEX LINE APEX LINE 2.38 2.13
7050 7050

0.50
0.60 0.70 A BLOW-UP TOILET DETAIL (MALE) A BLOW-UP TOILET DETAIL (FEMALE)
SCALE: 1:25mts. SCALE: 1:25mts.
2"x3" (good lumber) STUDS
& GIRT S spaced @ 0.60m
s t a g g e r e d w / 14 " F I B E R
2.60

2.60
1.20

0.70x1.80m CEMENT BOARD SIDING 0.72


F LU SH DOOR o n b o t h s i d e s .

2.10
1.80

0.34 0.34

0.30

0.30
4"CONC. ZOCALLO W ALL 0.40 0.40 0.40
0.60

SHELF SHELF SHELF SHELF

0.64
CABINET CABINET

0.32
4450 4450 0.51 0.63
ROOF DECK LINE ROOF DECK LINE SHELF SHELF
4"CONC. ZOCALLO W ALL SIDE ELEVATION

1.24
40x40cm WALL TILES
FRONT ELEVATION
A TEMPORARY PENTHOUSE DETAIL

0.60

0.60
0.70

2.04
SCALE: 1:50mts. 0.60
60x60cm GRANITE TILES
KITCHEN SINK 3"THK COUNTER SLAB w/
COUNTER

O.C. both ways & WATER


PROOFING COMPOUND

0.20
DRAWER
SHELF

0.20
0.80
0.40 0.40 0.40 0.40 0.40
DRAWER 0.13 0.43
CABINET CABINET CABINET
0.44

0.20
4"THK CONCRETE SLAB w/
DRAWER
40x40cm CERAMIC TILES
FINISH FLOOR LINE 4 " B A S E B O A R D & WATER PROOFING COMPOUND

A KITCHEN SECTION DETAIL


SCALE: 1:25mts.
6.68

PLAN
6.68

C E I L I N G L I N E

0.25
T OP GUIDE RAIL

0.66

N
SOUND PROOF MOV ABLE
P ART IT ION ( P ANE L T Y PE )

M
U

U
3.20
2.95
1 2 3 4 5 6 7 8 9 10

L
O

O
C

C
DIVISION CHIEF TABLE
SET: 01 FINISH FLOOR LINE BOT . GUIDE RAIL

TYP. OFFICE CUBICLE DETAILS ELEVATION


A STAFF TABLE
S E E D R A W I N G D I M E N S I O N S
SETS: 04 A MOVABLE PARTITION DETAIL
SCALE: 1:50mts.

T
"CONSTRUCTION OF CSC RO-VIII HUMAN
RESOURCE TRAINING CENTER PHASE-01" A 4
ARIEL M. JAVIER EDGAR B. TABACON VICTORIA F. ESBER 4 10
SUPERVISING HR SPECIALIST REGIONAL DIRECTOR - DPWH VIII REGIONAL DIRECTOR - CSC VIII
RESIDENT PROJECT COORDINATOR/IMPLEMENTOR
A B B' C C' D E A B B' C C' D E
17.67 17.67
5.06 3.77 3.72 5.11 5.06 3.77 3.72 5.11
1.50 3.58 1.49 1.78 3.34 1.50 2.63 2.44 1.48 2.30 1.27 2.46 2.59 2.52

BALCON Y LI N E
FB-02

3.00
PLANT BOX

CB-01
CB-01
2.40
ELEV.=4.40M

1.50
ELEV.=0.20M ELEV.=0.20M ELEV.=0.20M CAN OPY LIN E CANOPY LINE

0.80

0.80
CAN OPY LIN E CANOPY LINE
C1F1 PLANT BOX

0.30

0.30
PLANT BOX
3 3 CB-02 FB-01 FB-01 FB-01 FB-01
TB-01 TB-01 TB-01 TB-01
C1F1 C1F1 C1F1 C1F1

BALC ON Y LIN E

ELEV.=4.40M
2.62

FB-02
0.125m THK. CONC. SLAB w/

FB-01

FB-01

FB-01

FB-01

FB-01
WAYS

4.72
0.18
CB-02

TB-01

TB-01

TB-01
6.75

6.75

6.78

6.78
1.35
ELEV.=0.45M ELEV.=0.45M FB-02 FB-02 FB-02 FB-02

NOTE:
-

1.35

FB-01

FB-01

FB-01

FB-01

FB-01
-

NOTE:
CB-02

2.05
-
STIFFENER COLUMN
-

1.28

BALCONY LINE
C1F1 C1F1 C1F1

13.00

ELEV.=4.40M

13.00
TB-01 TB-01 TB-01 TB-01
13.30

13.30
2

FB-02
C1F1 C1F1 2 FB-01 FB-01 FB-01 FB-01

CAN OPY LINE


WF-01
1.47

1.45
WF-01
ELEV.=0.45M ROOF DECK SLAB w/ 3-COATS OF

1.98
0.30

WF-01

1.78
STIFFENER COLUMN ELEV.=0.425M ELEV.=0.45M MULTI-HIGH QUALITY WATERPROOFING
WF-01 WF-01 CB-02
WF-01 WF-01

CANOPY LINE

FB-01

FB-01

FB-01

FB-01
ELEV.=4.45M
WF-01

CAN OPY LIN E


0.80
1.65

1.57
ELEV.=0.40M

TB-01

WF-01
ELEV.=0.45M STIFFENER

1.35
ELEV.=0.45M ELEV.=0.40M 0.80

TB-01

FB-01
WF-01 WF-01

6.25
FB-02 FB-02 FB-02 FB-02

6.22
6.55

6.52
TB-01

NOTE:
1.20

- PROVIDE 1.00m LENGTH RSB DOWELS


WF-01

4.45
AT COLUMNS, STIFFENERS, STAIRS &

FB-01

FB-01

FB-01

FB-01
WF-01

WF-01
ELEV.=0.45M WALLS FOR PHASE-II UTILIZATION.

2.92
ELEV.=0.425M ELEV.=0.425M STAIRWELL - PROVIDE 4"x4" CONC. ZOCALLO AROUND
WF-01

3.50
WF-01
THE RIM OF STAIRWELL OPENING
STIFFENER
ELEV.=0.40M MONOLITHIC w/ CONCRETE SLAB.
2.23

TB-01 TB-01 C1F1


1 TB-01 1 FB-01 FB-01 FB-01

0.30
C1F1 TB-01 C1F1 FB-02

0.60
C2F2 PLANT BOX

0.20
PLANT BOX
C2F2

WF-01
CAN OPY LIN E CANOPY LINE

CB-02

CB-02
CANOPY LINE

1.80
ELEV.=0.40M ELEV.=4.40M CANOPY LINE
WF-01
1.50

RAMP

2.52
R AMP
2.22

WF-01 FB-02
0.72

0.72
2.58 2.53 1.27 3.60 2.58 2.53
3.30 4.42 4.84 5.11 3.30 4.40 4.86 5.11
17.67 17.67

S FOUNDATION PLAN S DECK FRAMING PLAN


SCALE: 1:100mts. SCALE: 1:100mts.

CHB REINFORCEMENT
MUST BE CONTINUOUS
PASSING THROUGH COLUMN
*VARIES (L)

T
L/4 L/2 L/4

0.25m O.C bothways


T

T
121
BALUSTER spaced @ 0.60m O.C.
0.20

CHB REINFORCEMENT @ 0.25m M.O.C

L/4
MUST BE CONTINUOUS
CHB REINFORCEMENT PASSING THROUGH COLUMN
T 0.25m M.O.C (IN BETWEEN
MUST BE CONTINUOUS
BENT BARS)
0.90

PASSING THROUGH COLUMN

E NT
NT
0.70

EM
ME

RC
NOTES: "T" DENOTES

*VARIES (L)
CE

FO
0.10M thk CONC. RAMP w/ T T THICKNESS OF CHB R

IN
O

L/2
NF

RE
- 21" GROOVES spaced @ 0.10m O.C. I
RE

P
STIFFENER COLUMNS

TO
.
BOT
*VARIES

0.25m O.C bothways


COMPACTED EARTH FILL
0.10

NGL

L/4
T

T
NOTE:
0.15

- USE GRADE 40 FOR


0.10m thick GRAVEL BED (COMPACTED)
0.20 STIFFENER COLUMNS OR - USE GRADE 50 FOR
CHB REINFORCEMENT BEAMS SHALL BE MADE TO
*VARIES ALL CHB AT EVERY 2.0m SPAN
MUST BE CONTINUOUS
PASSING THROUGH COLUMN OF MASONRY VERTICALLY AND
HORIZONTALLY. PLAN TOP REINFORCEMENT

0.125
0.30m

BOT. REINFORCEMENT

TYP. RAMP DETAIL


T

SECTION
S
SCALE: 1:25mts.
S STIFFENER-MASONRY CONNECTION DETAIL S TYP. 2-WAY SLAB DETAIL
SCALE: 1:25mts. SCALE: 1:25mts.

T
"CONSTRUCTION OF CSC RO-VIII HUMAN
RESOURCE TRAINING CENTER PHASE-01" S 1
C:\Users\user\Desktop\TUMABIENE\BFAR VIII FILES\LOGOS\unnamed.jpg
ARIEL M. JAVIER EDGAR B. TABACON VICTORIA F. ESBER 5 10
SUPERVISING HR SPECIALIST REGIONAL DIRECTOR - DPWH VIII REGIONAL DIRECTOR - CSC VIII
RESIDENT PROJECT COORDINATOR/IMPLEMENTOR
*VARIES (L)
S C H E D U L E O F B E A M S : L/4 L/4
0.30
1 0.25
@ SUPPORT
TOP BARS
@ MID SPAN
0.30 0.25 0.25
0.40 3.65 0.40
L/2 L/2 APEX LINE
7050

0.30

0.375

0.375
DIAGRAM

0.60

0.50
0.50
@ SUPPORT @ MID SPAN
BOT. BARS CUT BARS
BEAM TB1 FB1 FB2 CB1 CB2 L/5 NOTE: L/5

2.60
- BEAM REINFORCEMENTS MUST BE CONTINUOUS PASSING
2.75

COLUMN COLUMN
THROUGH COLUMN or OTHER BEAM.

2.10
REIN. @ SUPPORT

1.80
-
SECTION -

ROOF DECK SLAB w/ 3-COATS REIN. @ MIDSPAN


C O N C R E T E
EYELASH CANOPY O F M U L T I -H I G H Q U A L I T Y
WA TE RP ROOFING TIES
18 2ND FLOOR LINE (SIZE & SPACING) 3-0.10m, 3-0.15m, rest @ 2-0.10m, 2-0.15m, 2-0.20m, 3-0.10m, rest @ 0.15m. 2-0.10m, 2-0.15m, rest @ 3-0.10m, rest @ 0.15m.
17
4450 0.20m. rest @ 0.25 0.20m.
FB-01 16 FB-01 S TYP. BEAM DETAIL
15 BOT OF BEAM SCALE: 1:25mts.
3850
14
SCHEDULE OF COLUMNS:

2.00
13 0.30
0.30
12 0.15
0.45
11 0.10
10
S E E T Y P . R A I LI N G D E T .
STAIR LANDING

0.45

0.70

0.25
9
DIAGRAM

4.00
0.15m x 0.30m WALL FOOTING
3.90

8
6" thk CHB WALL
7
30cm O.C
6
spcd EVERY 3 LAYERS OF CHB
5

2.00
0.20
1.90

4 COLUMN C1 C2 STIFFINER
3

2 SEE SPOT DETAIL MAIN REINF. PLAN


6" thk CHB WALL
1 0.125m thk CONC.SLAB
P O R C H S T O R A G E A R E A TIES
GROUND FIN. FLR. LINE (SIZE & SPACING)
450 2-0.10m, 2-0.15m, 2-0.20m, 3-0.10m, 3-0.15m, rest @ spcd EVERY 3 LAYERS OF CHB ELEV. *VARIES
BARS spcd @ 30cm O.C bothways
2-0.25m, rest @ 0.30m. 0.20m.

0.12
*VARIES
SECONDARY TIES YES YES -
NGL
0.10M THK GRAVEL BED

SCHEDULE OF FOOTINGS:

0.40
0.15m x 0.30m WALL FOOTING

0.55
FOOTING X (mm) Y (mm) THICKNESS DEPTH REIN. @ X REIN. @ Y REMARKS
STAIRWAY DETAIL (mm) (mm)
30cm O.C

0.15 0.15
S F1 2500 2500 350 3000 ISOLATED FOOTING
SCALE: 1:50mts. O.C. O.C.
0.15M THK GRAVEL BED
F2 1700 3700 350 3000 ISOLATED FOOTING
O.C. O.C. SECTION

S W F - 0 1 D E T A I L
0.15
SCALE: 1:25mts.
4" thick CHB WALL
12mm NOSING BARS
1"thick PLASTER
s p c d a s s h o w n
CONC. CANOPY w/
0.10mX0.20m LINTEL BEAM
1/4"thk 16"x16" CERAMIC X 0.12m O.C both ways
FLOOR TILES (MATT) *VARIES 0.60 0.60 121
5 1% SLOPE
@0.10m. O.C (ALTERNATE)
0.30 0.30 0.30 0.30
NOTE: CANOPY
10mm BEND

0.10
0.05
4 REINFORCEMENTS MUST
EQ

0.25
B A R S BE CONTINUOUS PASSING

0.20
THROUGH BEAM/TIE-BEAM
COLUMN 0.05

0.10
3
EQ

1" thk MORTAR

0.90
12mm TEMP BARS 1" DRIP MOULD
s p c d @ 3 0 c m "Y" REINFORCEMENT 0.10

0.56
2 0.30
NOTE: "X" REINFORCEMENT
SEE TYPICAL RAILING DETAIL FOR

0.15
ELEV. *VARIES
1 STAIR RAILING DESIGN.
EQ

BOLTED w/ FLANGE (STAINLESS)


12mm TOP & BOT BARS PLAN SECTION ELEVATION
L/4
SECTION
GRND. FIN. FLOOR LINE
NATURAL GRADE LINE
0.13
0.10

MAIN REINFORCEMENT S CONC. CANOPY DETAIL S TYP.RAILING DETAIL


0.40

SCALE: 1:10mts. SCALE: 1:25mts.


*VARIES

12mm HOR. BARS


0.50

0.84

1 2 mm VE R TI C AL
DEPTH
0.70

B A R S TB-01
GA#24 G.I SHEET RIDGE CAP
UMBRELLA NAILS w/ GLASS SEALANT 0.60
4-12mm BEDBARS
CORRUGATED G.I SHEET G.A # 26 0.60
0.20

REINFORCEMENT
100mm thk GRAVEL
THK

"X" & "Y"

0.50
B E D
2" THK. GRAVEL BED 2"x3" TOP CHORD (good lumber )
0.60 SECTION

2"x3" BOT. CHORD (good lumber ) 1/2" thk x 20cm FIBER CEMENT BOARD

S TYP. CO LUMN DETA IL 0.40 1.83 1.83 0.40

S S P O T D E T A I L SCALE: 1:25mts. 4.45

SCALE: 1:25mts.

S T R U S S D E T A I L
SCALE: 1:20mts.

T
"CONSTRUCTION OF CSC RO-VIII HUMAN
RESOURCE TRAINING CENTER PHASE-01" S 2
ARIEL M. JAVIER EDGAR B. TABACON VICTORIA F. ESBER 6 10
SUPERVISING HR SPECIALIST REGIONAL DIRECTOR - DPWH VIII REGIONAL DIRECTOR - CSC VIII
RESIDENT PROJECT COORDINATOR/IMPLEMENTOR
ROUGHING-IN FOR PHASE-II ROUGHING-IN FOR PHASE-II

WS FD
CB CB CB CB CB WS DS WS
SS
WS DS WS WS
WS WS SS LAV
FD LAV
FD

WC FD
CO

FD
WC CO

FD
FD
CB CB WC
FD WC
LAV FD
WS
WS CO
CO
SS SS FD
WS LAV CO WS
WC FD
FD
SS CO SS

CO

SINK NOTE:
CB NOTE: CB FD
WC FD LAV
- -
WS FD
WS

WATER SUPPLY LINE WATER SUPPLY LINE


- SECOND FLOOR PLUMBING LAYOUT IS FD
- SECOND FLOOR PLUMBING LAYOUT IS
FOR ROUGHING-INS ONLY. FOR ROUGHING-INS ONLY.
- ALL EXPOSED ROUGH-IN PIPES MUST BE DOWN - ALL EXPOSED ROUGH-IN PIPES MUST BE
SECURED OR PLUGGED UNTIL PHASE-II UP SECURED OR PLUGGED UNTIL PHASE-II WC CO
UTILIZATION. LAV LAV UTILIZATION.
FD
LAV
FD
FD
LAV
U FD
CO U
SINK
FD FD CO
WC CO
WS
DS WC WC CO WS
CO DS U
CO SS SS
DS WS DS FD
CO DS
WS DS
CB CB CB
CB CB

TO MAIN SV
TO MAIN DRAINAGE
DRAINAGE

TO MAIN
SEWER LINE
G ROUND FLO OR R O O F D E C K
P WASTE DISPOSAL PLUMBING LAYOUT P WASTE DISPOSAL PLUMBING LAYOUT
SCALE: 1:100mts. SCALE: 1:100mts.

LAV
LAV
WC

SHO
F WC

WC

WC F
LAV
SHO SHO
F
SHO
LAV WC F

WC RISER
NOTE: SINK SINK RISER
- NOTE:
-
LAV
WATER SUPPLY LINE
- SECOND FLOOR PLUMBING LAYOUT IS WATER SUPPLY LINE
SHO
FOR ROUGHING-INS ONLY. - SECOND FLOOR PLUMBING LAYOUT IS
F
- ALL EXPOSED ROUGH-IN PIPES MUST BE FOR ROUGHING-INS ONLY.
SECURED OR PLUGGED UNTIL PHASE-II DOWN - ALL EXPOSED ROUGH-IN PIPES MUST BE
UTILIZATION. UP SECURED OR PLUGGED UNTIL PHASE-II
WC
UTILIZATION.
LAV LAV LAV

LAV
U U

WC
WC WC SINK
U

CV
M WM
GV

G ROUND FLO OR R O O F D E C K
P WA TE R S U PP LY PLU MB ING L AY O UT P W ATE R SU PP LY P LUMB IN G LA YO U T
SCALE: 1:100mts. SCALE: 1:100mts.

T
"CONSTRUCTION OF CSC RO-VIII HUMAN
RESOURCE TRAINING CENTER PHASE-01" P 1
ARIEL M. JAVIER EDGAR B. TABACON VICTORIA F. ESBER 7 10
SUPERVISING HR SPECIALIST REGIONAL DIRECTOR - DPWH VIII REGIONAL DIRECTOR - CSC VIII
RESIDENT PROJECT COORDINATOR/IMPLEMENTOR
2.50M.
0.10 0.70 0.10 1.50 0.10
0.50 0.50

OUTLET INLET

LEACHING CHAMBER DIGESTIVE CHAMBER

0.10

0.50
1.50
1.30
MANHOLE MANHOLE

0.10
P L A N

RSB spaced @ 0.15m. O.C. both ways. RSB spaced @ 0.15m. O.C. both ways.
C.O. C.O.

0.10
NGL NGL

AIR GAP
WATER LEVEL

OUTLET

4" THK CHB w/ 1" PLASTERING

4" THK CHB w/ 1" PLASTERING

4" THK CHB w/ 1" PLASTERING


CLEANOUT & VERT. BARS spaced @

1.20
SANITARY TEE

1.50
BARS spaced @ EVERY
2-LAYERS OF CHB.
LEACHING D IG E S T IV E
C H A M B E R C H A M B E R
0.20m THK CONC. SLAB

@ 0.40m O.C. both ways.

0.20
2.90

SECTION

P SEPTIC VAULT DETAIL


SCALE: 1:25mts.

0.50
0.10 0.30 0.10

0.10
8"x16"x4" CHB

0.50
0.30
0.10
PLAN DRAINAGE PIPE

DOWNSPOUT
CONC. COLUMN

0.10
0.50
0.30
8"x16"x4" CHB

0.10
0.10
PVC PICE
WASTE DISPOSAL PLUMBING LAYOUT
P ISOMETRIC VIEW
N O T D R A W N T O S C A L E SECTION

P CATCH BASIN DETAIL


SCALE: 1:20mts.

T
"CONSTRUCTION OF CSC RO-VIII HUMAN
RESOURCE TRAINING CENTER PHASE-01" P 2
ARIEL M. JAVIER EDGAR B. TABACON VICTORIA F. ESBER 8 10
SUPERVISING HR SPECIALIST REGIONAL DIRECTOR - DPWH VIII REGIONAL DIRECTOR - CSC VIII
RESIDENT PROJECT COORDINATOR/IMPLEMENTOR
GENERAL NOTES:
1. ALL PLUMBING WORK INDICATED HEREIN SHALL MEET THE PROVISION OF
THE PLUMBING CODE OF THE PHILIPPINES, THE NATIONAL PLUMBING CODE, LOCAL CITY ORDINANCE RULES AND
REGULATIONS.

2. PLUMBING CONTRACTOR TO COORDINATE WITH OTHER RELATED DRAWINGS AND SPECIFICATIONS, AND NOTIFY THE
CONSULTING ENGINEER OF ANY DISCREPANCY FOUND.

3. ALL PLUMBING PIPES SHALL BE INSTALLED AS INDICATED ON PLANS. ANY RELOCATION REQUIRED FOR PROPER
EXECUTION OF OTHER TRADE SHALL BE WITH PRIOR APPROVAL OF THE ARCHITECT OR ENGINEER.

4. PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL SITE


CONDITION, DEPTH AND INVERT ELEVATION OF ALL EXISTING PIPES AND STRUCTURES AS VERIFIED BY THE CONTRACTOR.

5. ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL MAINTAIN 1% UNLESS OTHERWISE SPECIFIED.

6. SIZE OF WATER SUPPLY PIPES TO FIXTURES SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS.

7. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE, TAPPING POINT AND WATER LINE SERVICE
CONNECTING POINT UNLESS OTHERWISE SPECIFIED.

8. ALL FIXTURES SHALL BE INDIVIDUALLY VENTED.

9. ALL PIPE SIZE AND DIMENSION ARE IN MILLIMETERS, UNLESS OTHERWISE SPECIFIED.

LEGEND:
SHO. SHOWER

FD. FLOOR DRAIN

WC. WATER CLOSET

U. URINAL

CB. CATCH BASIN

CO. CLEAN OUT

F. FAUCET

LAV. LAVATORY

DS. DOWN SPOUT

SS. SOIL STACK

WS. WASTE STACK

SV. STACK VENT

WV. WASTE VENT

VTR. VENT THRU ROOF

CV. CHECK VALVE


MATERIAL SPECIFICATIONS: GV. GATE VALVE

M WM. WATER METER


SOLID WASTE PIPE SHALL BE 4" DIA POLYVINYL (PVC) WATER SUPPLY PIPE LINE
PIPE, SERIES 1000 OR APPROVED
WATER WASTE PIPE LINE
EQUAL FITTING SHALL BE PVC WITH
SOLVENT CEMENT JOINT TO ASTM D2564 SOIL PIPE LINE

VENT LINE
WATER WASTE PIPE SHALL BE 3" DIA PVC PIPE (MAIN
LINE) FLOOR DRAIN 3" DIA PVC
(BRANCHING) LAVATORY 2" DIA PVC
(BRANCHING) SINK 2" DIA PVC (BRANCHING)

STORM DRAIN SHALL BE 12 " AND 8" DIA RCPC MAIN


AND 6" DIA BRANCHING AND 4" DIA FOR END
LINES
W A T E R S U PP L Y PL U M B IN G L A Y OU T
P ISOMETRIC VIEW VENT PIPE SHALL BE POLYVINYL (PVC) PIPE,
SERIES 900 OR APPROVED EQUAL. FITTING
N O T D R A W N T O S C A L E SHALL BE PVC WITH SOLVENT CEMENT
JOINT TO ASTM D2564

WATER LINE SHALL BE uPVC

WATER METER WATER METER SHALL BE "ARAD",


ASAHI" BRAND OR APPROVED EQUAL.

T
"CONSTRUCTION OF CSC RO-VIII HUMAN
RESOURCE TRAINING CENTER PHASE-01" P 3
ARIEL M. JAVIER EDGAR B. TABACON VICTORIA F. ESBER 9 10
SUPERVISING HR SPECIALIST REGIONAL DIRECTOR - DPWH VIII REGIONAL DIRECTOR - CSC VIII
RESIDENT PROJECT COORDINATOR/IMPLEMENTOR
DL DL
2
DL DL

S1
S1 S1 ACU
ACU

GENERAL NOTES:
1. ALL ELECTRICAL WORKS HEREIN SHALL COMPLY WITH THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE, THE RULES
ACU
AND REGULATIONS OF THE LOCAL UTILITY COMPANY AND THE LAWS AND ORDINANCES OF THE LOCAL ENFORCING AUTHORITIES
CONCERNED.THE ELECTRICAL WORKS SHALL BE UNDER THE IMMEDIATE SUPERVISION OF COMPETENT DULY LICENSED
ELECTRICAL ENGINEER.

2.

3. MINIMUM SIZE OF CONDUCTOR AND CONDUIT TO BE USED SHALL BE3.5mm TYPE 'TW' STRANDED AND 15mm INTERNAL
DIAMETER, RESPECTIVELY.
1
4. WIRING LAYOUT ARE DIAGRAMMATIC ONLY. CONTRACTOR SHALL WIRE THE SYSTEM TO ATTAIN ITS INTENDED FUNCTION EVEN
WIRES ARE NOT INDICATED ON PLANS.
ACU

S3 S3 5. ALL SERVICE ENTRANCE EQUIPMENT, SWITCHES, PANEL BOARDS, LIGHTING FIXTURES AND ALL NON-CURRENT CARRYING
3 METAL PARTS SHALL BE PROPERLY GROUNDED IN ACCORDANCE WITH THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL
S1 CODE.
PL NOTE:
CM CM CM CM - SECOND FLOOR CONVENIENCE OUTLET 6. SERVICE ENTRANCE CONDUIT SHALL BE IN RIGID STEEL CONDUIT.
LAYOUT IS FOR ROUGHING-INS ONLY.
S1 S1 - ALL EXPOSED ROUGH-IN PIPES MUST BE 7. UNLESS OTHERWISE SPECIFIED, PULL BOXES OR JUNCTION BOXES SHALL BE PROVIDED WHENEVER REQUIRED AND
DL CM PB2 SECURED OR PLUGGED UNTIL PHASE-II
S1 NECESSARY, ALTHOUGH SUCH BOXES ARE NOT INDICATED ON PLANS.
PL PL PL DL
UTILIZATION.
S2 8. USE BOLT-ON TYPE CIRCUIT BREAKERS.
DOWN
S1 UP
PB1 9. WIRING LAYOUT IN GENERAL SHALL BE IN POLYVINYL CHLORIDE CONDUIT (PVC) SCH. 40 HIGH IMPACT TYPE.
PL PL PL
CM CM S1 S1
S3 10. ALL WIRING DEVICES ARE APPROXIMATE LOCATION ONLY, ACTUAL SETTING CAN BE MOVED WITHIN 3.0 METERS WITHOUT
S2 ADDITIONAL COST TO THE OWNER.
S2 S2
4 PL PL 11. THE CONTRACTOR SHALL CONDUCT MEAGER TEST ON ALL WIRES.
ACU

5
WL WL
WL WL
DL DL

G ROUND FLO OR R O O F D E C K
E LIGHTING OUTLET LAYOUT E CONVENIENCE OUTLET LAYOUT
SCALE: 1:100mts. SCALE: 1:100mts.

SERVICE ELECTRICAL SYMBOLS:


ENTRANCE
PL
M
ACU ACU
DL PB-01 ELECTRICAL LOAD SCHEDULE:
7 IN 40mm RSC/PVC
9 6 11 CIRCUIT CIRCUIT
CONDUIT PIPE DOUBLE LED TROFFER LIGHTING (FLUSH) LOAD DESCRIPTION L.O. C.O. WATTS VOLTS AMPS SIZE OF WIRE SIZE OF CONDUIT
PB1 NO. BREAKER
CM DOUBLE LED TROFFER LIGHTING (CEILING MOUNTED)
1 LIGHTING OUTLET 7 700W 220 3.18 15A STRANDED WIRE
100A
SINGLE LED TROFFER LIGHTING (FLUSH)
15A 15A 2 LIGHTING OUTLET 9 900W 4.09 15A STRANDED WIRE
SINGLE LED TROFFER LIGHTING (CEILING MOUNTED)
L.O. 1 2 L.O. CM
3 LIGHTING OUTLET 11 1100W 5.00 15A STRANDED WIRE
15A 15A COMPACT FLUORESCENT LAMP SCREW-IN
4 LIGHTING OUTLET 9 900W 4.09 15A STRANDED WIRE
L.O. 3 4 L.O. UP/DOWN WALL LIGHT (WARM WHITE)
WL 5 LIGHTING OUTLET 9 900W 4.09 15A STRANDED WIRE
15A 20A TTB TERMINAL BLOCK (TELEPHONE TERMINAL BLOCK
WITH COVER) 6 CONVENIENCE OUTLET 7 1260W 5.73 20A STRANDED WIRE
L.O. 5 6 C.O.
PANEL BOARD
10 20A 20A 7 CONVENIENCE OUTLET 8 1440W 6.55 20A STRANDED WIRE
12
POWER SERVICE ENTRANCE
ACU ACU
C.O. 7 8 C.O. 8 CONVENIENCE OUTLET 7 1260W 5.73 20A STRANDED WIRE
30A 30A M KILOWATT HOUR METER
9 AIR CONDITIONING UNIT 1 1300W 5.91 30A STRANDED WIRE
ACU ACU 9 10 ACU CIRCUIT BREAKER
10 AIR CONDITIONING UNIT 1 1300W 5.91 30A STRANDED WIRE
8 13
30A 30A
GROUND
11 AIR CONDITIONING UNIT 1 1300W 5.91 30A STRANDED WIRE
ACU 11 12 ACU
1 CIRCUIT HOME RUN
30A 30A 12 AIR CONDITIONING UNIT 1 1300W 5.91 30A STRANDED WIRE
DUPLEX CONVENIENCE OUTLET
ACU 13 14 ACU 13 AIR CONDITIONING UNIT 1 1300W 5.91 30A STRANDED WIRE
ACU
AIR CONDITIONING UNIT
PB1 14 AIR CONDITIONING UNIT 1 1300W 5.91 30A STRANDED WIRE
WP
SPARE 15 16 SPARE WEATHER PROOF OUTLET
15 SPARE
S1 1-GANG SWITCH
16 SPARE
S2 2-GANG SWITCH
TOTAL: 45 28 16,260 220 73.91
14
S3 3-GANG SWITCH TOTAL LOAD: 16,260W/220V = 73.91A WIRE RSC/PVC CONDUIT PIPE
ACU GROUND LINE
CIRCUIT HOME RUN LINE BREAKER: 220V, 100A CIRCUIT BREAKER

CONVENIENCE OUTLET LINE

SWITCH LINE

E PANEL BOARD DIAGRAM


G ROUND FLO OR 4 4 N O T D R A W N T O S C A L E

E CONVENIENCE OUTLET LAYOUT


SCALE: 1:100mts.

T
"CONSTRUCTION OF CSC RO-VIII HUMAN
RESOURCE TRAINING CENTER PHASE-01" E 1
C:\Users\user\Desktop\TUMABIENE\BFAR VIII FILES\LOGOS\unnamed.jpg
ARIEL M. JAVIER EDGAR B. TABACON VICTORIA F. ESBER 10 10
SUPERVISING HR SPECIALIST REGIONAL DIRECTOR - DPWH VIII REGIONAL DIRECTOR - CSC VIII
RESIDENT PROJECT COORDINATOR/IMPLEMENTOR