A R C H I T E C T U R A L DISTRICT/CITY/MUNICIPALITY
PERSPECTIVE
A1 SITE DEVELOPMENT PLAN
VICINITY MAP
S T R U C T U R A L
STAIRWAY DETAIL
SPOT DETAIL
SCHEDULE OF BEAMS, COLUMNS, & FOOTINGS
TYP. COLUMN DETAIL
S2
A PERSPECTIVE CONC. CANOPY DETAIL
TYP. BEAM DETAIL
WF-01 DETAIL
N O T D R A W N T O S C A L E
TYP. RAILING DETAIL ARCHITECTURAL
P L U M B I N G
20.87
WASTE DISPOSAL PLUMBING LAYOUTS
P1
2.78
P3 GENERAL NOTES
STRUCTURAL
LEGEND
F E N C E
W A L K W A Y
Y
PROJECTOR SCREEN
PROJECTOR SCREEN
MATERIAL SPECIFICATIONS
T R A I N I N G H A L L 0 1 T R A I N I N G H A L L 0 2
A
M O V A B L E
E L E C T R I C A L
W
E R
E1
C O V E R E D
A U D I O WAITI NG AREA
INFORMATION
R O O M PWD
V
DESK
(TOILET)
KITCHEN GENERAL NOTES
ELECTRICAL SYMBOLS
C AN OPY LI N E
I
UP
H A L L W A Y
L O U N G E
N O T H I N G F O L L O W S SANITARY/PLUMBING
R
O F F I C E
TOILET AREA TOILET AREA
A R E A (FEMALE)
D
(MALE)
STAIRWAY
MAIN ENTRY
1.50
1.70
CAN OP Y LI N E
RAMP P O R C H RAMP
2.24
CANOPY LIN E
G U A R D
8.54
H O U S E
ELECTRICAL
6.02
MAIN ENTRY P E R I M E T E R F E N C E
M A I N R O A D
T
"CONSTRUCTION OF CSC RO-VIII HUMAN
RESOURCE TRAINING CENTER PHASE-01" A 1
ARIEL M. JAVIER EDGAR B. TABACON VICTORIA F. ESBER 1 10
SUPERVISING HR SPECIALIST REGIONAL DIRECTOR - DPWH VIII REGIONAL DIRECTOR - CSC VIII
RESIDENT PROJECT COORDINATOR/IMPLEMENTOR
A B B' C C' D E
17.67
5.06 3.77 3.72 5.11
SEC
17.67 LONG
SEC
2.40
2.40
LONG DL DL
TEXTURED
1.50 3
3.00
2.40
CANOPY LINE W A L K W A Y W A L K W A Y CANOPY LINE
BALCON Y LI N E
1.50
0.80
PLANT BOX PLANT BOX PLANT BOX PLANT BOX CL-04
3 1.50
CL-01 CL-01 CL-01 CL-01
CANOPY LINE
P A R T I T I O N
6.75
6.75
60x60cm FLOOR TILES
GLAZED (WHITE) ACCORDION TYPE
MOVABLE PARTITION
(SOUND PROOF)
PROJECTOR SCREEN
PROJECTOR SCREEN
1.20
6.75
T R A I N I N G H A L L 0 1 T R A I N I N G H A L L 0 2
SEC
M O V A B L E
60x60cm FLOOR TILES CROSS
BALCONY LIN E
GLAZED (WHITE)
13.00
13.30
2
CL-04
SEC CL-02
1.48
CROSS
1.98
PL
CANOPY LINE
CM CM CM CM
13.00
13.30
CANOPY LINE
CL-02 CL-02
2 CL-03 CL-03
CANOPY LINE
DL CM
1.48
A U D I O WAITING AREA PL PL PL DL
INFORMATION
1.98
1.35
R O O M PWD CL-03
2.85
DESK
KITCHEN CL-01
6.25
(TOILET)
6.55
CL-01
60x60cm FLOOR TILES
CANOPY LINE
PL PL PL
CM CM
1.50
1.20
1.35
DETAILS H A L L W A Y
2.85
UP
L O U N G E CL-03
6.25
2.92
STAIRWAY
6.55
PL PL
2.23
O F F I C E 40x40cm FLOOR TILES CL-03
1.20 TOILET AREA
A R E A TOILET AREA SEMI-GLAZED
(FEMALE)
(MALE) 1
2.92
CANOPY LINE CAN OPY LIN E
2.23
1.80
1.50
MAIN ENTRY
1
CANOPY LINE
PLANT BOX CANOPY LINE
60x60cm FLOOR TILES
1.80
TEXTURED
1.50
2.52
RAMP
2.22
DETAILS
CANOPY LINE 2.58 2.53
0.72
0.72
3.30 4.42 4.84 5.11
LEGEND: 17.67
2.58 2.53 CL-01- DROP CEILING 70cm SUSPENDED FROM BOT. OF SLAB w/ 1 4" THK. MARINE PLYWOOD ON A 2" X 2" CEILING JOIST spaced
3.30 4.20 5.06 5.11 @ 40cm O.C BOTH WAYS & 2" WD. CORNICE ALL AROUND.
17.67
CL-02- DROP CEILING 90cm SUSPENDED FROM BOT. OF SLAB w/ 1 4" THK. MARINE PLYWOOD ON A 2" X 2" CEILING JOIST spaced
@ 40cm O.C BOTH WAYS & 2" WD. CORNICE ALL AROUND.
CL-03- DROP CEILING, ALIGNED TO BEAM w/ 1 4" THK. MARINE PLYWOOD ON A 2" X 2" CEILING JOIST spaced @ 40cm O.C BOTH
WAYS & 2" WD. CORNICE ALL AROUND.
0.40 0.40
A GROUND FLOOR PLAN CL-04- FLAT CEILING - PLASTERED BOT. OF SLAB FINISH.
SCALE: 1:100mts.
GRO UND FL OO R
A REFLECTED CEILING PLAN 2"x2" CEILING JOIST
SCALE: 1:100mts.
0.40
spaced @ 40cm O.C
both ways
APEX LINE APEX LINE
7050 7050
0.40
STAIRWAY STAIRWAY
2.60
2.60
0.80
F F
1.20 STAGGERED 1.50 1.50 0.80
TOP OF SLAB/BEAM
4.00
4.00
CONC. CANOPY
4.45
4.45
0.50
3.40
2"x2" HANGER
*VARIES
2"x2" CEILING JOIST
spaced @ 40cm O.C
1.50
P O R C H both ways
FIN. FLOOR LINE P L A N T B O X P L A N T B O X FIN. FLOOR LINE
(ELEV. 0.40m) BOT. OF CEILING
0.50
450 450
0.70
0.45
0.45
1
PLASTER FINISH w/ HOR. GROOVES 0 0 4"thick MARINE PLYWOOD w/
STONE CLADDING WALL FINISH NATURAL GRADE LINE STONE CLADDING WALL FINISH NATURAL GRADE LINE
spaced @ 0.30m STAGGERED SECTION 2" WD CORNICE ALL AROUND
T
"CONSTRUCTION OF CSC RO-VIII HUMAN
RESOURCE TRAINING CENTER PHASE-01" A 2
ARIEL M. JAVIER EDGAR B. TABACON VICTORIA F. ESBER 2 10
SUPERVISING HR SPECIALIST REGIONAL DIRECTOR - DPWH VIII REGIONAL DIRECTOR - CSC VIII
RESIDENT PROJECT COORDINATOR/IMPLEMENTOR
3.60
1.50 2.10
0.70 0.70
1.50 0.90 0.80 0.80
0.40
0.40
F F F F 0.70 0.70 0.80 0.70 0.70
0.70
0.60
A B B' C C' D E
2.50
17.67
1.90
F F
2.10
2.10
2.10
2.10
2.10
1.55
5.06 3.77 3.72 5.11
1.75
3.58 1.49 1.78 3.34
SEC
LONG
BALCONY LINE
0.20
0.20
FIN. FLR. LINE FIN. FLR. LINE FIN. FLR. LINE FIN. FLR. LINE FIN. FLR. LINE FIN. FLR. LINE
2.40
2.10m x 1.50m DOUBLE FLUSH 1/4 2.10m x 0.70m PANEL DOOR w/ 1.55m x 0.60m FLUSH DOOR
CANOPY LINE CANOPY LINE DOUBLE GLASS DOOR with FIXED LITE DOOR w/ ACCESSORIES GLASS DOOR GLASS DOOR ACCESSORIES QTY 3-SET(S)
GLASS QTY 2-SET(S) QTY 3-SET(S) QTY 3-SET(S) QTY 3-SET(S) LOC REFER TO PLANS & ELEVATIONS
CANOPY LINE CANOPY LINE
QTY 1-SET(S) LOC REFER TO PLAN LOC REFER TO PLANS & ELEVATIONS LOC REFER TO PLANS & ELEVATIONS LOC REFER TO PLANS & ELEVATIONS
3 LOC REFER TO PLANS & ELEVATIONS
BALCON Y LI N E
3.00 2.40
2% SLOPE 2% SLOPE 2% SLOPE 2% SLOPE EQ EQ EQ EQ EQ EQ EQ EQ EQ
(MAINTAIN) (MAINTAIN) (MAINTAIN) (MAINTAIN)
1.20 1.20 1.20
0.40
0.40
F F F F F F F F F 0.60 0.60 0.60 0.60 0.60 0.60
1.80
6.75
6.75
EQ EQ
0.40
0.40
1.20
1.20
1.20
1.20
F
2.50
2.50
2.10
2.10
2.10
SEC
1.80
1.70
CROSS
1.20
R O O F D E C K A R E A F F
BALCONY LIN E
13.00
(MAINTAIN)
(MAINTAIN)
2% SLOPE
2% SLOPE
13.30
0.90
0.90
0.90
0.90
2
CANOPY LINE
ROOF DECK SLAB w/ 3-COATS OF
0.20
FIN. FLR. LINE FIN. FLR. LINE STAIR LANDING FLR. LINE FIN. FLR. LINE FIN. FLR. LINE FIN. FLR. LINE
1.48
1.98
WINDOW 01 WINDOW 02 WINDOW 03 WINDOW 04 WINDOW 05 WINDOW 06
CANOPY LINE
TYPE 1.60m x 3.00m ALUMINUM FRAME TYPE 1.60m x 2.40m ALUMINUM FRAME TYPE 1.60m x 1.80m ALUMINUM FRAME TYPE 1.20m x 1.20m ALUMINUM FRAME TYPE 1.20m x 1.20m ALUMINUM FRAME TYPE 0.40m x 1.20m ALUMINUM FRAME
CANOPY LINE
SLIDING WINDOW w/ FIXED GLASS SLIDING WINDOW w/ FIXED GLASS AWNING WINDOW w/ FIXED GLASS SLIDING WINDOW FIXED GLASS WINDOW AWNING WINDOW
QTY 1-SET(S) QTY 4-SET(S) QTY 1-SET(S) QTY 1-SET(S) QTY 1-SET(S) QTY 2-SET(S)
1.35
LOC REFER TO PLANS & ELEVATIONS LOC REFER TO PLANS & ELEVATIONS LOC REFER TO PLANS & ELEVATIONS LOC REFER TO PLANS & ELEVATIONS LOC REFER TO PLANS & ELEVATIONS LOC REFER TO PLANS & ELEVATIONS
2.85
6.25
2% SLOPE 2% SLOPE 2% SLOPE
6.55
TEMPORARY
A SCHEDULE OF DOORS & WINDOWS
PENTHOUSE FOR SCALE: 1:50mts.
2.92
STAIRWAY
2.23
0.60
2% SLOPE CANOPY LINE
1.80
(MAINTAIN) CL-04 CL-01 CL-01 CL-01 CL-01
1.50
4.00
ACCORDION TYPE
4.45
3.40
3.20
MOVABLE PARTITION
(SOUND PROOF)
2.58 2.53
3.30 4.42 4.84 5.11 TRAINING HALL O1 TRAINING HALL O2
FIN. FLOOR LINE
17.67 450
0.45
0
NATURAL GRADE LINE
2.60
2.60
3 ROOF DECK SLAB MIXED w/
2 1 1 2 3 1 4" WD CONCRETE ZOCALLO 2 3
WALL AROUND STAIRWELL RIM ROOF DECK SLAB w/ 3-COATS OF
WATERPROOFING COMPOUND
R O O F D E C K A R E A MULTI-HIGH QUALITY WATERPROOFING
R O O F D E C K A R E A R O O F D E C K A R E A
0.10
ROOF DECK LINE ROOF DECK LINE ROOF DECK LINE
4450 4450 4450
0.50
0.60
0.60
4.00
4.00
CONC. CANOPY
4.45
4.45
4.45
3.50
3.40
3.40
3.20
3.00
AU D IO
P O R C H FIN. FLOOR LINE P O R C H P O R C H ROOM
TRAINING HALL O1
FIN. FLOOR LINE STORAGE FIN. FLOOR LINE
(ELEV. 0.40m) 450 (ELEV. 0.40m) 450 (ELEV. 0.40m) 450
0.45
0.45
0.45
PLASTER FINISH w/ HOR. GROOVES 0 0 0
STONE CLADDING WALL FINISH NATURAL GRADE LINE STONE CLADDING WALL FINISH NATURAL GRADE LINE NATURAL GRADE LINE
spaced @ 0.30m STAGGERED
T
"CONSTRUCTION OF CSC RO-VIII HUMAN
RESOURCE TRAINING CENTER PHASE-01" A 3
ARIEL M. JAVIER EDGAR B. TABACON VICTORIA F. ESBER 3 10
SUPERVISING HR SPECIALIST REGIONAL DIRECTOR - DPWH VIII REGIONAL DIRECTOR - CSC VIII
RESIDENT PROJECT COORDINATOR/IMPLEMENTOR
P A R T O F H A L L W A Y P A R T O F H A L L W A Y
8"x16"x4" CHB w/ 1" PLASTER BOTH SIDES 8"x16"x4" CHB w/ 1" PLASTER BOTH SIDES
R O O F L I N E R O O F L I N E R O O F L I N E
0.10
0.16
LAVATORY LAVATORY
0.35
0.40
0.40
0.20
0.20
LAVATORY 0.36
( F E M A L E )
1.76
( g o o d l u m b e r ) ELEV: 1" LOWER FROM FINISH
1.72
0.70
1.76
A R E A
1/ 2" thk x 20cm FIBER
CEMENT BOARD
S L O P E FLOOR LINE
FLR. 40x40cm FLOOR TILES
E
E
0.40
DRAIN SEMI-GLAZED
N
N
GA#24 G.I SHEE T
S
40x40cm FLOOR TILES
0.40
I
OF FIC E
R I D G E C A P SEMI-GLAZED 0.60 0.71 0.60
T O I L E T
L
L
L
2.60
3.45
3.45
4.25
4.25
3.45
2.60
U
T O I L E T
URINAL
R
F
F
CORRUGAT ED URINAL
2"THK CONCRETE WALL w/
O
O
2"x3" (good lumber) STUDS
T
2"x3" PURLINS (good
H R
G.I.SHE ET GA#26 10mm RSB spaced @ 0.20m
& GIRT S spaced @ 0.60m 0.13
O
O
O
l umber ) spaced @ 0.40 O.C. both ways & 1"THK
O F
s t a g g e r e d w / 14 " F I B E R S L O P E 0.95
R
OF
0.60M stagger ed
O F
PLASTER BOTHSIDES
1.72
CEMENT BOARD SIDING 0.13
P A R T
o n b o t h s i d e s .
P A R T
P A R T
2"THK CONCRETE WALL w/ FLR. FLR.
0.25
1.25 10mm RSB spaced @ 0.20m DRAIN DRAIN
O.C. both ways & 1"THK 0.34 0.33
0.51
PLASTER BOTHSIDES
0.84
0.84
0.40
0.40
WATER WATER WATER
CLOSET CLOSET CLOSET
0.70
0.60
R O O F L I N E R O O F L I N E R O O F L I N E
0.51
FLR.
DRAIN 0.31 0.53 0.44
2.98 3.78 3.78
0.15
0.08
COLUMN COLUMN
0.60mx1.20m JALOUSIE
0.55 1.20 0.63 0.63 1.20 0.55
W INDOW w/ BARS
APEX LINE APEX LINE 2.38 2.13
7050 7050
0.50
0.60 0.70 A BLOW-UP TOILET DETAIL (MALE) A BLOW-UP TOILET DETAIL (FEMALE)
SCALE: 1:25mts. SCALE: 1:25mts.
2"x3" (good lumber) STUDS
& GIRT S spaced @ 0.60m
s t a g g e r e d w / 14 " F I B E R
2.60
2.60
1.20
2.10
1.80
0.34 0.34
0.30
0.30
4"CONC. ZOCALLO W ALL 0.40 0.40 0.40
0.60
0.64
CABINET CABINET
0.32
4450 4450 0.51 0.63
ROOF DECK LINE ROOF DECK LINE SHELF SHELF
4"CONC. ZOCALLO W ALL SIDE ELEVATION
1.24
40x40cm WALL TILES
FRONT ELEVATION
A TEMPORARY PENTHOUSE DETAIL
0.60
0.60
0.70
2.04
SCALE: 1:50mts. 0.60
60x60cm GRANITE TILES
KITCHEN SINK 3"THK COUNTER SLAB w/
COUNTER
0.20
DRAWER
SHELF
0.20
0.80
0.40 0.40 0.40 0.40 0.40
DRAWER 0.13 0.43
CABINET CABINET CABINET
0.44
0.20
4"THK CONCRETE SLAB w/
DRAWER
40x40cm CERAMIC TILES
FINISH FLOOR LINE 4 " B A S E B O A R D & WATER PROOFING COMPOUND
PLAN
6.68
C E I L I N G L I N E
0.25
T OP GUIDE RAIL
0.66
N
SOUND PROOF MOV ABLE
P ART IT ION ( P ANE L T Y PE )
M
U
U
3.20
2.95
1 2 3 4 5 6 7 8 9 10
L
O
O
C
C
DIVISION CHIEF TABLE
SET: 01 FINISH FLOOR LINE BOT . GUIDE RAIL
T
"CONSTRUCTION OF CSC RO-VIII HUMAN
RESOURCE TRAINING CENTER PHASE-01" A 4
ARIEL M. JAVIER EDGAR B. TABACON VICTORIA F. ESBER 4 10
SUPERVISING HR SPECIALIST REGIONAL DIRECTOR - DPWH VIII REGIONAL DIRECTOR - CSC VIII
RESIDENT PROJECT COORDINATOR/IMPLEMENTOR
A B B' C C' D E A B B' C C' D E
17.67 17.67
5.06 3.77 3.72 5.11 5.06 3.77 3.72 5.11
1.50 3.58 1.49 1.78 3.34 1.50 2.63 2.44 1.48 2.30 1.27 2.46 2.59 2.52
BALCON Y LI N E
FB-02
3.00
PLANT BOX
CB-01
CB-01
2.40
ELEV.=4.40M
1.50
ELEV.=0.20M ELEV.=0.20M ELEV.=0.20M CAN OPY LIN E CANOPY LINE
0.80
0.80
CAN OPY LIN E CANOPY LINE
C1F1 PLANT BOX
0.30
0.30
PLANT BOX
3 3 CB-02 FB-01 FB-01 FB-01 FB-01
TB-01 TB-01 TB-01 TB-01
C1F1 C1F1 C1F1 C1F1
BALC ON Y LIN E
ELEV.=4.40M
2.62
FB-02
0.125m THK. CONC. SLAB w/
FB-01
FB-01
FB-01
FB-01
FB-01
WAYS
4.72
0.18
CB-02
TB-01
TB-01
TB-01
6.75
6.75
6.78
6.78
1.35
ELEV.=0.45M ELEV.=0.45M FB-02 FB-02 FB-02 FB-02
NOTE:
-
1.35
FB-01
FB-01
FB-01
FB-01
FB-01
-
NOTE:
CB-02
2.05
-
STIFFENER COLUMN
-
1.28
BALCONY LINE
C1F1 C1F1 C1F1
13.00
ELEV.=4.40M
13.00
TB-01 TB-01 TB-01 TB-01
13.30
13.30
2
FB-02
C1F1 C1F1 2 FB-01 FB-01 FB-01 FB-01
1.45
WF-01
ELEV.=0.45M ROOF DECK SLAB w/ 3-COATS OF
1.98
0.30
WF-01
1.78
STIFFENER COLUMN ELEV.=0.425M ELEV.=0.45M MULTI-HIGH QUALITY WATERPROOFING
WF-01 WF-01 CB-02
WF-01 WF-01
CANOPY LINE
FB-01
FB-01
FB-01
FB-01
ELEV.=4.45M
WF-01
1.57
ELEV.=0.40M
TB-01
WF-01
ELEV.=0.45M STIFFENER
1.35
ELEV.=0.45M ELEV.=0.40M 0.80
TB-01
FB-01
WF-01 WF-01
6.25
FB-02 FB-02 FB-02 FB-02
6.22
6.55
6.52
TB-01
NOTE:
1.20
4.45
AT COLUMNS, STIFFENERS, STAIRS &
FB-01
FB-01
FB-01
FB-01
WF-01
WF-01
ELEV.=0.45M WALLS FOR PHASE-II UTILIZATION.
2.92
ELEV.=0.425M ELEV.=0.425M STAIRWELL - PROVIDE 4"x4" CONC. ZOCALLO AROUND
WF-01
3.50
WF-01
THE RIM OF STAIRWELL OPENING
STIFFENER
ELEV.=0.40M MONOLITHIC w/ CONCRETE SLAB.
2.23
0.30
C1F1 TB-01 C1F1 FB-02
0.60
C2F2 PLANT BOX
0.20
PLANT BOX
C2F2
WF-01
CAN OPY LIN E CANOPY LINE
CB-02
CB-02
CANOPY LINE
1.80
ELEV.=0.40M ELEV.=4.40M CANOPY LINE
WF-01
1.50
RAMP
2.52
R AMP
2.22
WF-01 FB-02
0.72
0.72
2.58 2.53 1.27 3.60 2.58 2.53
3.30 4.42 4.84 5.11 3.30 4.40 4.86 5.11
17.67 17.67
CHB REINFORCEMENT
MUST BE CONTINUOUS
PASSING THROUGH COLUMN
*VARIES (L)
T
L/4 L/2 L/4
T
121
BALUSTER spaced @ 0.60m O.C.
0.20
L/4
MUST BE CONTINUOUS
CHB REINFORCEMENT PASSING THROUGH COLUMN
T 0.25m M.O.C (IN BETWEEN
MUST BE CONTINUOUS
BENT BARS)
0.90
E NT
NT
0.70
EM
ME
RC
NOTES: "T" DENOTES
*VARIES (L)
CE
FO
0.10M thk CONC. RAMP w/ T T THICKNESS OF CHB R
IN
O
L/2
NF
RE
- 21" GROOVES spaced @ 0.10m O.C. I
RE
P
STIFFENER COLUMNS
TO
.
BOT
*VARIES
NGL
L/4
T
T
NOTE:
0.15
0.125
0.30m
BOT. REINFORCEMENT
SECTION
S
SCALE: 1:25mts.
S STIFFENER-MASONRY CONNECTION DETAIL S TYP. 2-WAY SLAB DETAIL
SCALE: 1:25mts. SCALE: 1:25mts.
T
"CONSTRUCTION OF CSC RO-VIII HUMAN
RESOURCE TRAINING CENTER PHASE-01" S 1
C:\Users\user\Desktop\TUMABIENE\BFAR VIII FILES\LOGOS\unnamed.jpg
ARIEL M. JAVIER EDGAR B. TABACON VICTORIA F. ESBER 5 10
SUPERVISING HR SPECIALIST REGIONAL DIRECTOR - DPWH VIII REGIONAL DIRECTOR - CSC VIII
RESIDENT PROJECT COORDINATOR/IMPLEMENTOR
*VARIES (L)
S C H E D U L E O F B E A M S : L/4 L/4
0.30
1 0.25
@ SUPPORT
TOP BARS
@ MID SPAN
0.30 0.25 0.25
0.40 3.65 0.40
L/2 L/2 APEX LINE
7050
0.30
0.375
0.375
DIAGRAM
0.60
0.50
0.50
@ SUPPORT @ MID SPAN
BOT. BARS CUT BARS
BEAM TB1 FB1 FB2 CB1 CB2 L/5 NOTE: L/5
2.60
- BEAM REINFORCEMENTS MUST BE CONTINUOUS PASSING
2.75
COLUMN COLUMN
THROUGH COLUMN or OTHER BEAM.
2.10
REIN. @ SUPPORT
1.80
-
SECTION -
2.00
13 0.30
0.30
12 0.15
0.45
11 0.10
10
S E E T Y P . R A I LI N G D E T .
STAIR LANDING
0.45
0.70
0.25
9
DIAGRAM
4.00
0.15m x 0.30m WALL FOOTING
3.90
8
6" thk CHB WALL
7
30cm O.C
6
spcd EVERY 3 LAYERS OF CHB
5
2.00
0.20
1.90
4 COLUMN C1 C2 STIFFINER
3
0.12
*VARIES
SECONDARY TIES YES YES -
NGL
0.10M THK GRAVEL BED
SCHEDULE OF FOOTINGS:
0.40
0.15m x 0.30m WALL FOOTING
0.55
FOOTING X (mm) Y (mm) THICKNESS DEPTH REIN. @ X REIN. @ Y REMARKS
STAIRWAY DETAIL (mm) (mm)
30cm O.C
0.15 0.15
S F1 2500 2500 350 3000 ISOLATED FOOTING
SCALE: 1:50mts. O.C. O.C.
0.15M THK GRAVEL BED
F2 1700 3700 350 3000 ISOLATED FOOTING
O.C. O.C. SECTION
S W F - 0 1 D E T A I L
0.15
SCALE: 1:25mts.
4" thick CHB WALL
12mm NOSING BARS
1"thick PLASTER
s p c d a s s h o w n
CONC. CANOPY w/
0.10mX0.20m LINTEL BEAM
1/4"thk 16"x16" CERAMIC X 0.12m O.C both ways
FLOOR TILES (MATT) *VARIES 0.60 0.60 121
5 1% SLOPE
@0.10m. O.C (ALTERNATE)
0.30 0.30 0.30 0.30
NOTE: CANOPY
10mm BEND
0.10
0.05
4 REINFORCEMENTS MUST
EQ
0.25
B A R S BE CONTINUOUS PASSING
0.20
THROUGH BEAM/TIE-BEAM
COLUMN 0.05
0.10
3
EQ
0.90
12mm TEMP BARS 1" DRIP MOULD
s p c d @ 3 0 c m "Y" REINFORCEMENT 0.10
0.56
2 0.30
NOTE: "X" REINFORCEMENT
SEE TYPICAL RAILING DETAIL FOR
0.15
ELEV. *VARIES
1 STAIR RAILING DESIGN.
EQ
0.84
1 2 mm VE R TI C AL
DEPTH
0.70
B A R S TB-01
GA#24 G.I SHEET RIDGE CAP
UMBRELLA NAILS w/ GLASS SEALANT 0.60
4-12mm BEDBARS
CORRUGATED G.I SHEET G.A # 26 0.60
0.20
REINFORCEMENT
100mm thk GRAVEL
THK
0.50
B E D
2" THK. GRAVEL BED 2"x3" TOP CHORD (good lumber )
0.60 SECTION
2"x3" BOT. CHORD (good lumber ) 1/2" thk x 20cm FIBER CEMENT BOARD
SCALE: 1:25mts.
S T R U S S D E T A I L
SCALE: 1:20mts.
T
"CONSTRUCTION OF CSC RO-VIII HUMAN
RESOURCE TRAINING CENTER PHASE-01" S 2
ARIEL M. JAVIER EDGAR B. TABACON VICTORIA F. ESBER 6 10
SUPERVISING HR SPECIALIST REGIONAL DIRECTOR - DPWH VIII REGIONAL DIRECTOR - CSC VIII
RESIDENT PROJECT COORDINATOR/IMPLEMENTOR
ROUGHING-IN FOR PHASE-II ROUGHING-IN FOR PHASE-II
WS FD
CB CB CB CB CB WS DS WS
SS
WS DS WS WS
WS WS SS LAV
FD LAV
FD
WC FD
CO
FD
WC CO
FD
FD
CB CB WC
FD WC
LAV FD
WS
WS CO
CO
SS SS FD
WS LAV CO WS
WC FD
FD
SS CO SS
CO
SINK NOTE:
CB NOTE: CB FD
WC FD LAV
- -
WS FD
WS
TO MAIN SV
TO MAIN DRAINAGE
DRAINAGE
TO MAIN
SEWER LINE
G ROUND FLO OR R O O F D E C K
P WASTE DISPOSAL PLUMBING LAYOUT P WASTE DISPOSAL PLUMBING LAYOUT
SCALE: 1:100mts. SCALE: 1:100mts.
LAV
LAV
WC
SHO
F WC
WC
WC F
LAV
SHO SHO
F
SHO
LAV WC F
WC RISER
NOTE: SINK SINK RISER
- NOTE:
-
LAV
WATER SUPPLY LINE
- SECOND FLOOR PLUMBING LAYOUT IS WATER SUPPLY LINE
SHO
FOR ROUGHING-INS ONLY. - SECOND FLOOR PLUMBING LAYOUT IS
F
- ALL EXPOSED ROUGH-IN PIPES MUST BE FOR ROUGHING-INS ONLY.
SECURED OR PLUGGED UNTIL PHASE-II DOWN - ALL EXPOSED ROUGH-IN PIPES MUST BE
UTILIZATION. UP SECURED OR PLUGGED UNTIL PHASE-II
WC
UTILIZATION.
LAV LAV LAV
LAV
U U
WC
WC WC SINK
U
CV
M WM
GV
G ROUND FLO OR R O O F D E C K
P WA TE R S U PP LY PLU MB ING L AY O UT P W ATE R SU PP LY P LUMB IN G LA YO U T
SCALE: 1:100mts. SCALE: 1:100mts.
T
"CONSTRUCTION OF CSC RO-VIII HUMAN
RESOURCE TRAINING CENTER PHASE-01" P 1
ARIEL M. JAVIER EDGAR B. TABACON VICTORIA F. ESBER 7 10
SUPERVISING HR SPECIALIST REGIONAL DIRECTOR - DPWH VIII REGIONAL DIRECTOR - CSC VIII
RESIDENT PROJECT COORDINATOR/IMPLEMENTOR
2.50M.
0.10 0.70 0.10 1.50 0.10
0.50 0.50
OUTLET INLET
0.10
0.50
1.50
1.30
MANHOLE MANHOLE
0.10
P L A N
RSB spaced @ 0.15m. O.C. both ways. RSB spaced @ 0.15m. O.C. both ways.
C.O. C.O.
0.10
NGL NGL
AIR GAP
WATER LEVEL
OUTLET
1.20
SANITARY TEE
1.50
BARS spaced @ EVERY
2-LAYERS OF CHB.
LEACHING D IG E S T IV E
C H A M B E R C H A M B E R
0.20m THK CONC. SLAB
0.20
2.90
SECTION
0.50
0.10 0.30 0.10
0.10
8"x16"x4" CHB
0.50
0.30
0.10
PLAN DRAINAGE PIPE
DOWNSPOUT
CONC. COLUMN
0.10
0.50
0.30
8"x16"x4" CHB
0.10
0.10
PVC PICE
WASTE DISPOSAL PLUMBING LAYOUT
P ISOMETRIC VIEW
N O T D R A W N T O S C A L E SECTION
T
"CONSTRUCTION OF CSC RO-VIII HUMAN
RESOURCE TRAINING CENTER PHASE-01" P 2
ARIEL M. JAVIER EDGAR B. TABACON VICTORIA F. ESBER 8 10
SUPERVISING HR SPECIALIST REGIONAL DIRECTOR - DPWH VIII REGIONAL DIRECTOR - CSC VIII
RESIDENT PROJECT COORDINATOR/IMPLEMENTOR
GENERAL NOTES:
1. ALL PLUMBING WORK INDICATED HEREIN SHALL MEET THE PROVISION OF
THE PLUMBING CODE OF THE PHILIPPINES, THE NATIONAL PLUMBING CODE, LOCAL CITY ORDINANCE RULES AND
REGULATIONS.
2. PLUMBING CONTRACTOR TO COORDINATE WITH OTHER RELATED DRAWINGS AND SPECIFICATIONS, AND NOTIFY THE
CONSULTING ENGINEER OF ANY DISCREPANCY FOUND.
3. ALL PLUMBING PIPES SHALL BE INSTALLED AS INDICATED ON PLANS. ANY RELOCATION REQUIRED FOR PROPER
EXECUTION OF OTHER TRADE SHALL BE WITH PRIOR APPROVAL OF THE ARCHITECT OR ENGINEER.
5. ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL MAINTAIN 1% UNLESS OTHERWISE SPECIFIED.
6. SIZE OF WATER SUPPLY PIPES TO FIXTURES SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS.
7. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE, TAPPING POINT AND WATER LINE SERVICE
CONNECTING POINT UNLESS OTHERWISE SPECIFIED.
9. ALL PIPE SIZE AND DIMENSION ARE IN MILLIMETERS, UNLESS OTHERWISE SPECIFIED.
LEGEND:
SHO. SHOWER
U. URINAL
F. FAUCET
LAV. LAVATORY
VENT LINE
WATER WASTE PIPE SHALL BE 3" DIA PVC PIPE (MAIN
LINE) FLOOR DRAIN 3" DIA PVC
(BRANCHING) LAVATORY 2" DIA PVC
(BRANCHING) SINK 2" DIA PVC (BRANCHING)
T
"CONSTRUCTION OF CSC RO-VIII HUMAN
RESOURCE TRAINING CENTER PHASE-01" P 3
ARIEL M. JAVIER EDGAR B. TABACON VICTORIA F. ESBER 9 10
SUPERVISING HR SPECIALIST REGIONAL DIRECTOR - DPWH VIII REGIONAL DIRECTOR - CSC VIII
RESIDENT PROJECT COORDINATOR/IMPLEMENTOR
DL DL
2
DL DL
S1
S1 S1 ACU
ACU
GENERAL NOTES:
1. ALL ELECTRICAL WORKS HEREIN SHALL COMPLY WITH THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE, THE RULES
ACU
AND REGULATIONS OF THE LOCAL UTILITY COMPANY AND THE LAWS AND ORDINANCES OF THE LOCAL ENFORCING AUTHORITIES
CONCERNED.THE ELECTRICAL WORKS SHALL BE UNDER THE IMMEDIATE SUPERVISION OF COMPETENT DULY LICENSED
ELECTRICAL ENGINEER.
2.
3. MINIMUM SIZE OF CONDUCTOR AND CONDUIT TO BE USED SHALL BE3.5mm TYPE 'TW' STRANDED AND 15mm INTERNAL
DIAMETER, RESPECTIVELY.
1
4. WIRING LAYOUT ARE DIAGRAMMATIC ONLY. CONTRACTOR SHALL WIRE THE SYSTEM TO ATTAIN ITS INTENDED FUNCTION EVEN
WIRES ARE NOT INDICATED ON PLANS.
ACU
S3 S3 5. ALL SERVICE ENTRANCE EQUIPMENT, SWITCHES, PANEL BOARDS, LIGHTING FIXTURES AND ALL NON-CURRENT CARRYING
3 METAL PARTS SHALL BE PROPERLY GROUNDED IN ACCORDANCE WITH THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL
S1 CODE.
PL NOTE:
CM CM CM CM - SECOND FLOOR CONVENIENCE OUTLET 6. SERVICE ENTRANCE CONDUIT SHALL BE IN RIGID STEEL CONDUIT.
LAYOUT IS FOR ROUGHING-INS ONLY.
S1 S1 - ALL EXPOSED ROUGH-IN PIPES MUST BE 7. UNLESS OTHERWISE SPECIFIED, PULL BOXES OR JUNCTION BOXES SHALL BE PROVIDED WHENEVER REQUIRED AND
DL CM PB2 SECURED OR PLUGGED UNTIL PHASE-II
S1 NECESSARY, ALTHOUGH SUCH BOXES ARE NOT INDICATED ON PLANS.
PL PL PL DL
UTILIZATION.
S2 8. USE BOLT-ON TYPE CIRCUIT BREAKERS.
DOWN
S1 UP
PB1 9. WIRING LAYOUT IN GENERAL SHALL BE IN POLYVINYL CHLORIDE CONDUIT (PVC) SCH. 40 HIGH IMPACT TYPE.
PL PL PL
CM CM S1 S1
S3 10. ALL WIRING DEVICES ARE APPROXIMATE LOCATION ONLY, ACTUAL SETTING CAN BE MOVED WITHIN 3.0 METERS WITHOUT
S2 ADDITIONAL COST TO THE OWNER.
S2 S2
4 PL PL 11. THE CONTRACTOR SHALL CONDUCT MEAGER TEST ON ALL WIRES.
ACU
5
WL WL
WL WL
DL DL
G ROUND FLO OR R O O F D E C K
E LIGHTING OUTLET LAYOUT E CONVENIENCE OUTLET LAYOUT
SCALE: 1:100mts. SCALE: 1:100mts.
SWITCH LINE
T
"CONSTRUCTION OF CSC RO-VIII HUMAN
RESOURCE TRAINING CENTER PHASE-01" E 1
C:\Users\user\Desktop\TUMABIENE\BFAR VIII FILES\LOGOS\unnamed.jpg
ARIEL M. JAVIER EDGAR B. TABACON VICTORIA F. ESBER 10 10
SUPERVISING HR SPECIALIST REGIONAL DIRECTOR - DPWH VIII REGIONAL DIRECTOR - CSC VIII
RESIDENT PROJECT COORDINATOR/IMPLEMENTOR