Вы находитесь на странице: 1из 1

6 5 4 3 2 1

TO
TEST MANIFOLD
D 10"
PID-1305
D

TO
PRODUCTION MANIFOLD
10"
PID-1305

13HV0110 Note 2 13HV0111 Note 2 13HV0210 Note 2 13HV0211 Note 2 13HV0310 Note 2 13HV0311 Note 2 13HV0410 Note 2 13HV0411 Note 2
13HC 13HY M 13HY 13HC 13HY 13HY 13HC 13HY 13HY 13HC 13HY 13HY

M
FL FL FL FL FL FL FL FL
0110 0110 0111 0210 0210 0211 0310 0310 0311 0410 0410 0411
6" 6" 6" 6" 6" 6" 6" 6"
5.12 5.13 5.14 5.15
13ZI 13HC 13TI 13ZI 13HC 13TI 13ZI 13HC 13TI 13ZI 13HC 13TI
0107 0107 0108 PSD 13HC 0207 0207 0208 PSD 13HC 0307 0307 0308 PSD 13HC 0407 0407 0408 PSD 13HY
0111 0211 0311 0411

HH = 50 barg HH = 50 barg HH = 50 barg HH = 50 barg


13ZT 13HY 13TT 13PST 13ZT 13HY 13TT 13PST 13ZT 13HY 13TT 13PST 13ZT 13HY 13TT 13PST
0107 0107 0108 0109 0207 0207 0208 0209 0307 0307 0308 0309 0407 0407 0408 0409
C LL = 28 barg LL = 28 barg LL = 28 barg LL = 28 barg C
13HV0107 13HV0207 13HV0307 13HV0407

Choke Valve FL FL FL FL
Note 1

HH = 200 barg HH = 200 barg HH = 200 barg HH = 200 barg


13PST 13PST 13PST 13PST

PSD

PSD

PSD
PSD

5" 5.12 5" 5.13 5" 5.14 5" 5.15


0106 0206 0306 0406
LL = 20 barg LL = 20 barg LL = 20 barg LL = 20 barg

13EV0105 13EV0205 13EV0305 13EV0405


ESD

ESD

ESD

ESD
Wing Valve FC 2.0 FC 2.0 FC 2.0 FC 2.0

Note 1 R R R R
PSD

PSD

PSD

PSD
5.12 5.12 5.14 5.15

7"
13PT 13PI 7"
13PT 13PI 7"
13PT 13PI 7"
13PT 13PI
0104 0104 L = 30 barg 0204 0204 L = 30 barg 0304 0304 L = 30 barg 0404 0404 L = 30 barg

B 13PST 13PST 13PST 13PST B


PSD

PSD

PSD

PSD
5.12 5.13 5.12 5.15
0103 0203 0303 0403
LL = 20 barg LL = 20 barg LL = 20 barg LL = 20 barg

13EV0102 13EV0202 13EV0302 13EV0402


ESD

ESD

ESD

ESD
Master Valve FC 2.0 FC 2.0 FC 2.0 FC 2.0

Note 1 R R R R
PSD

PSD

PSD

PSD
5.12 5.13 5.14 5.15

13PT 13PI H = 100 barg 13PT 13PI H = 100 barg 13PT 13PI H = 100 barg 13PT 13PI H = 100 barg
Sub-Surface 0112 0112 L = 30 barg 0212 0212 L = 30 barg 0312 0312 L = 30 barg 0412 0412 L = 30 barg
Safety Valve 13EV0101 13EV0201 13EV0301 13EV0401
ESD

ESD

ESD

ESD
FC 1.0 FC 1.0 FC 1.0 FC 1.0
Note 1
R R R R
FROM FROM FROM FROM
PRODUCTION PRODUCTION PRODUCTION PRODUCTION
WELL 01 WELL 02 WELL 03 WELL 04

NOTES: PROJECT NAME

1. All wells have the following interlock sequence when opening: GENERIC OIL & GAS PRODUCTION PROCESS
A i) Sub-Surface Safety Valve (SSSV) GENERIC OIL & GAS PRODUCTION PROCESS A
ii) Master Valve
DRAWING TITLE PROCESS P & I DIAGRAM
iii) Manifold Valve (Production or Test)
iv) Wing Valve
v) Choke Valve PRODUCTION WELLS (GROUP 1)
2. i) When well is selected to Test Manifold then PSD 4.1 Test Separator is enabled.
DRAWN BY SIZE PROJECTION DRAWING NO. REV
ii) When well is selected to Production Manifold then PSD 4.2 HP Separator is enabled.