1 Material /Shop Drawing Document Contract Drawing + Project Approved Material & Shop Drawing H H H PM Material & Shop Drawing
Review Specification Submittals Record
INCOMING MATERIAL
3 Mock Up Field Contract Drawing + Project Mock up as per Approved Drawings / H H H PM/PE/QE Approved IR
Verification Specification Details , Approved Material used
Installation of Underground Field As per Project Contract Drawing + Project A.) Installations + Level +Slopes as per Approved IR & QC Check
4 UPVC Pipe & Fittings Verification Specification Specification approved shop drawings H H H PM/PE/QE List
B.) No deffects
5 Leakage Test Field Each Area Contract Drawing + Project No Leakages H H H PM/PE/QE Approved IR & QC Check
Verification Specification List
Prepared By Reviewed By
QA/QC Engineer Project Manager
Signature Signature
Date Date
Page 1 of 11
CLIENT CONSULTANT MAIN CONTRACTOR MEP SUBCONTRACTOR
Ref. ITP- (J248)1374-PL-0003-B-1
ALTHAMRA SELF OWNED
PROPERTY LEASING &
MANAGEMENT SERVICES
Revision 00
AL SAHEL CONTRACTING
COMPANY LLC Date
Project Name:
J-248 (DB-1374) Commercial & Residential Building (B+G+13+R) @ Al Barsha South 3, Dubai, UAE
Document Title:
INSPECTION TEST PLAN (ITP)
Activity: INSTALLATION & TESTING OF WATER SU00+PPLY PIPE WORKS - PEX Specification: Division 15000, Section 15200
Civil Clearance or civil area handover form is to be obtained for the Civil Clearance or civil area Civil Clearance or Civil Clearance or
4 Sr.PE/PE/QE N/A Once civil area civil area R H R
area where MEP installation is to be executed. handover form handover form handover form
Testing of (Water Supply pipes & Accessories) shall be as per Sr.PE/PE/ Leakage 1- Installation approval- Every Inspection Inspection
6 H R H/W
installation approval and method statement. SE/QE Checklist 2- Method Statement Inspection Request Request
Legend: H: Hold Point Sr. PE: Project Engineer SK: Store Keeper
R: Review Point PE: Project Engineer MCR: Material Conformity Report TR: Test Report
S: Surveilance/ Internal Checking Point SE: Site Engineer MS: Material Submittal ICL: Inspection Checklist
W: Witness Point QE: Quality Engineer IR: Inspection Request
Page 2 of 11
CLIENT CONSULTANT
Project Name:
J-248 (DB-1374) Commercial & Residential Build
Document Title:
INSPECTION TEST
Activity: INSTALLATION & TESTING OF WATER SUPP
M/s SAIF
Hand
readine
M/s SAIF
Install
(emb
M/s SAIFCO
for the "P
M/s SAIFCO
(test shall be d
inst
Issuance of "Plaster
Clearance"
Prepared By Reviewed By
QA/QC Manager Sr. Project Engr.
Signature Signature
Date Date
MAIN CONTRACTOR MEP SUBCONTRACTOR
AL SAHEL CONTRACTING
COMPANY LLC
START
Approved By
Project Manager
Signature
Date
Ref. ITP- (J248)1374-PL-0003-B-2
Revision 00
Date