CLIENT CONSULTANT MAIN CONTRACTOR MEP SUBCONTRACTOR

Ref. ITP- (J248)1374-PL-0001


ALTHAMRA SELF OWNED
PROPERTY LEASING &
MANAGEMENT SERVICES
Revision 00
AL SAHEL CONTRACTING
COMPANY LLC Date
Project Name:
J-248 (DB-1374) Commercial & Residential Building (Basement+G+13+Roof) @ Al Barsha South 3, Dubai, UAE
Document Title:
INSPECTION TEST PLAN (ITP)
Activity: INSTALLATION OF UNDERGROUND PIPE WORK & LEAKAGE TEST
Type of Inspection Category Responsible
No. Activity Inspection / Material Testing / Reference Acceptance Person Quality Records
Test Sampling Frequency Document Criteria SAIFCO ASCC AJMI (SAIFCO)

SHOP DRAWING / MATERIAL APPROVAL

1 Material /Shop Drawing Document Contract Drawing + Project Approved Material & Shop Drawing H H H PM Material & Shop Drawing
Review Specification Submittals Record

INCOMING MATERIAL

Material Delivered from Approved Supplier

As per Project Contract Drawing + Project Material Conformity


2 Incoming Material Visual Specification Specification + Manufacturer Material free from defects H H H PE/SE/QE Request
Manual
Material conforming to project
requirements
INSTALLATION

3 Mock Up Field Contract Drawing + Project Mock up as per Approved Drawings / H H H PM/PE/QE Approved IR
Verification Specification Details , Approved Material used

Installation of Underground Field As per Project Contract Drawing + Project A.) Installations + Level +Slopes as per Approved IR & QC Check
4 UPVC Pipe & Fittings Verification Specification Specification approved shop drawings H H H PM/PE/QE List
B.) No deffects

5 Leakage Test Field Each Area Contract Drawing + Project No Leakages H H H PM/PE/QE Approved IR & QC Check
Verification Specification List

Prepared By Reviewed By
QA/QC Engineer Project Manager

Signature Signature

Date Date

Page 1 of 11
CLIENT CONSULTANT MAIN CONTRACTOR MEP SUBCONTRACTOR
Ref. ITP- (J248)1374-PL-0003-B-1
ALTHAMRA SELF OWNED
PROPERTY LEASING &
MANAGEMENT SERVICES
Revision 00
AL SAHEL CONTRACTING
COMPANY LLC Date
Project Name:
J-248 (DB-1374) Commercial & Residential Building (B+G+13+R) @ Al Barsha South 3, Dubai, UAE
Document Title:
INSPECTION TEST PLAN (ITP)
Activity: INSTALLATION & TESTING OF WATER SU00+PPLY PIPE WORKS - PEX Specification: Division 15000, Section 15200

Inspection Parties/ type of


Responsible Inspection/ inspection
Verifying Recording (Internal Checking, Hold or Witness point)
No. Description Person Testing Acceptance Criteria Frequency REMARKS
(SAIFCO) Method Document Document

SAIFCO ASCC AJMI

Materials (PEX - Water Supply pipes & Accessories) are to be in


1 accordance with the Specification. Sr.PE/PE/QE N/A Specification Once Material Submittal Material Submittal H R H

Handling & On every


Materials - MCR (PEX-Water Supply pipes & Accessories) are to be in Storage Delivery of Material Material
2 Sr.PE/PE/QE Approved Material Submittal H R H
accordance with the approved Material Submittal. Inspection Inspection
Checklist material

Approved Construction/ Design


3 Shop Drawings are to be as per approved Construction/ Design Dwg. Sr.PE/PE/QE N/A Once Shop Dwgs. Shop Dwgs. H R H
Drawings

Civil Clearance or civil area handover form is to be obtained for the Civil Clearance or civil area Civil Clearance or Civil Clearance or
4 Sr.PE/PE/QE N/A Once civil area civil area R H R
area where MEP installation is to be executed. handover form handover form handover form

1- Civil Clearance/ Civil Area


Installation of (PEX-Water Supply pipes & Accessories) shall be as per Handover Form,
Approved; Civil Clearance/ Civil Area Handover Form, Material Sr.PE/PE/ Installation 2- Material Conformity Report Every Inspection Inspection
5 Conformity Report & Manufaturer recommendation, Shop Drawing SE/QE Checklist 3- Manufature recommendation, Inspection Request Request H R H
and Method Statement. 4- Shop Drawing
5- Method Statement.

Testing of (Water Supply pipes & Accessories) shall be as per Sr.PE/PE/ Leakage 1- Installation approval- Every Inspection Inspection
6 H R H/W
installation approval and method statement. SE/QE Checklist 2- Method Statement Inspection Request Request

Prepared By Reviewed By Approved By


QA/QC Manager Sr. Project Engr. Project Manager

Signature Signature Signature

Date Date Date

Legend: H: Hold Point Sr. PE: Project Engineer SK: Store Keeper
R: Review Point PE: Project Engineer MCR: Material Conformity Report TR: Test Report
S: Surveilance/ Internal Checking Point SE: Site Engineer MS: Material Submittal ICL: Inspection Checklist
W: Witness Point QE: Quality Engineer IR: Inspection Request

Page 2 of 11
CLIENT CONSULTANT

AL SAYYAH & SONS


INVESTMENT LLC

Project Name:
J-248 (DB-1374) Commercial & Residential Build
Document Title:
INSPECTION TEST
Activity: INSTALLATION & TESTING OF WATER SUPP

M/s SAIF
Hand
readine
M/s SAIF
Install
(emb

M/s SAIFCO
for the "P

M/s SAIFCO
(test shall be d
inst
Issuance of "Plaster
Clearance"

Prepared By Reviewed By
QA/QC Manager Sr. Project Engr.

Signature Signature

Date Date
MAIN CONTRACTOR MEP SUBCONTRACTOR

AL SAHEL CONTRACTING
COMPANY LLC

Residential Building (B+G+13+R) @ Al Barsha South 3, Dubai, UAE

PECTION TEST PLAN (ITP) - Flow Chart


G OF WATER SUPPLY PIPE WORKS-PEX Specification: Division 15

START

Civil Clearance from the Main


Contructor to be obtained
prior starting the MEP
Installation

M/s SAIFCO to inspect the the


Handed over area of its
readiness (Access & Safety)

M/s SAIFCO to "mark the pipe


routing (block wall)" for the
pipe run
M/s SAIFCO to raise the
Inspection for the "Marking"
(Mockup Only)

Civil to cut/ chase the wall


after obtaining the marking
approval

M/s SAIFCO to complete the


Installation of PEX pipe
(embeded pipe) in the
blockwall

M/s SAIFCO to raise the Inspection


for the "PEX pipe Installation)

M/s SAIFCO to complete Pressure


Testing
(test shall be done only after obtaining the
installation approval)
END

Approved By
Project Manager

Signature

Date
Ref. ITP- (J248)1374-PL-0003-B-2

Revision 00

Date

Specification: Division 15000, Section 15200