M/s Al Sahel Contracting

Company
M/s. Al Thamra Self
Owned Property Main MEP
Client Leasing & Contractor Contractor
Management Services

PRESSURE TEST CHECKLIST


SPRINKLER & FIREFIGHTING SYSTEM

Document no: CL-J248(1374)-PL-001-B-03

IR.No Revision

Location
Legend: √ = Means YES, X = Means NO

Complied Inspected by
S.no Item to be checked (√ ) or (X) Main Contractor

1
Ensure that the Installation Inspection approval for Sprinkler &
Firefighting system is obtained.

2 Ensure that test pressure is maintained during the holding time of test.

3
Ensure the pressure gauge to be used for the pressure testing is
calibrated (calibration certificate is available).

Ensure that all openings in the piping are tightly closed by end
4 caps/plugs and the system is filled with water to the point of overflow
from the highest point.

Ensure that the water is maintained in the pipe network for 24 hrs. @
5 1.5 times of the system working pressure or as specified is higher the
operating pressure.

6
Ensure that there is no water leakage/ drop from any joint of the tested
pipe network.
MTR
Bars2.0 Specified Leak Test Holding time
Pressure Test (Hours)

Test start date & time

Test End date & time

LEAKAGE Test result (Passed/ Failed)

Comments/Remarks, if any
ASCC
Consulatnt

Work done and Checked By


M/s SAIFCO M/s AL SAHEL
(QA/QC Manager) (MEP Coordinator)

NAME

Designation

SIGN

Date
MEP
ontractor

J248-1374
COMMERCIAL AND
RESIDENTIAL
Project: BUILDING AT AL
BARSHA SOUTH 3 ,
DUBAI

Date

NO

nspected by Remarks
in Contractor
Holding time
24

M/s AL AJMI