Вы находитесь на странице: 1из 27
CONTRACT No. “4600002203 PECIKO FIELD DEVELOPMENT PROJECT — PHASE 7A CABLE TRAY/LADDER INSTALLATION PROCEDURE CLASS 4 ie He © | aun [Ge | neminswonsorennain | ea | SiR a | wane ew np 2 | nn | an ‘iP a | mone | om Teun Ome CHECK | APPR. ENG/PJC REV. DATE BY DESCRIPTION COMPANY conrmacron | _ SoMa STATUS CODE: A= Issued for comments - B= lssued for approval - C= Approved + D= As Built TOTAL OR PARTIAL REPRODUCTION AND/OR UTILIZATION OF THIS DOGUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER Tora ] >] >< [> [> >< [>< > SHEET REVISIONS AlB[C|DIElF[G]A a 52 Et 34. 55 56 57 58 59 60 et 62 63. G4 5. 66, 67 8 69 70 mt 2 73 74 75. 76 77 78 79 20 81 82 3 24 85 86 87 88 38 90 94 2 93 24 5 96 97 98 99 100) PECIKO FIELD DEVELOPMENT PROJECT - PHASE TA POKTAIEPCI2 “Tis document Is he property ef COMPANY. X must not 3 sored reproduced or disclosed to eer witout wi Rev. Date: 2012010 TOTAL E&P INDONESIE oo Cegeléc) Doe. Title: TRAY/LADDER INSTALLATION PROCEDURE ‘Pvecxout usar TOTAL | doc. type PRO Discipline NAP Page 3/27 CONTENT PAGES REVISION 1 PURPOSE 4 A 2 REFERENCE DOCUMENT 4 c 3. | SCOPE OF APPLICATION 4 Bt 4 | TERMINOLOGY 4 A 5 UNPACKING 4 A 6 | GENERAL 4 A 7 | CABLE TRAYS DESIGN 8 A 8 CABLE TRAYS CONNECTING PARTS 13 A 9 CABLE TRAYS UNIT SUPPORTING 17 A 10 | CABLE TRAYS VARIOUS FIXING SYSTEMS 18 A 11 | CABLE TRAYS VARIOUS MOUNTINGS, 19 A 12 | SUSPENDED CABLE TRAYS FIXATION 20 A 13 | CABLE TRAYS ASSEMBLY ACCESSORIES 241 A 14 | CABLE TRAYS ASSEMBLY BOLTING 22 A 15 | LARGE CAPACITY SUSPENDED CABLE TRAYS. 23 B 16 | CABLE TRAYS IN CHANNEL 24 A 47. | INSTALLATION OF Vi TRAY: 25 8 18 | CABLE TRAYS WITH COVER 27 B 1 PURPOSE PEE FELO DEVELOPUENT PROJECT -PHASETA Dee Roig PCR GEP ZOOS Date + 20/01/2010 ‘This documents the properly of COMPANY. I must nt be sore, reproduces oF sacised o other winout writen autorization fram COMPANY TOTAL E&P INDONESIE Cegelec) Doc. Title: TRAYILADDER INSTALLATION PROCEDURE eect TOTAL. | doc. Type PRC Discipline NAP Page 4/27 PURPOSE. The purpose of this document is to describe the installation of cable trays in various conditions and positions, REFERENCE DOCUMENT = Standard ISO 9002 — GS-EP-INS-101 = GS-EP-ELE-311 = 1D-PCK-PA-IBP-7002411 - MWP-A instr. Cable Tray Layout — _1D-PCK-PA-IBP-7002414 - MWP-A Instr. Tubing Tray Layout —_ 1D-PCK-PB-IBP-7002411 - MWP-8 Instr. Cable Tray layout — _1D-PCK-PB-IBP-7002414 - MWP-B Instr. Tubing Tray Layout ~ 1D-PCK-PE-IBP-7002411 - SWP-E Instr, Cable Tray Dwg Layout — ID-PCK-PE-IBP-7002414 - SWP-E Instr. Tubing Tray Dwg Layout — _ID-PCK-PE-IBP-6002400 - Electrical Cable Ladder Tray Layout ID-PCK-PE-IBP-6002401 - Electrical Cable Ladder Tray Support Layout soi PLICATION Peciko Field Development Phase-7 A Project TERMINOLOGY Not applicable in this procedure. INPACKING Cable trays are generally delivered in bundles or crates, unpacking does not require any particular precaution. — Store the main equipment under shelter. = Store small parts (washers, splices) in warehouse and classify them, GENERAL 61 CABLE TRAYS ARE INSTALLED IN DIFFERENT ZONES. THEY MUST BE ADAPTED TO PREVAILING CONDITIONS : = Environment drylocation - conventional trays, ‘damp locations =. painted trays or PVC. - Capacity : according fo the number of cables. = Supporting : they are reinforced for long distances. 62. THERE ARE DIFFERENT TYPES OF CABLES TRAYS ~ Ladder (normal or large capacity girder). — Perforated stab (various sizes for normal or for reinforced types). — Full slab (mechanical or electrical protection, e.g. : measuring cables). = PVC slab for particular locations or environments. — Electrical or gas tubing (for long span) mechanical protection “motor re-mounting’, etc. Rail telex (Individual tray). — Steel wire cable trays. PECIKO FIELD DEVELOPMENT PROJECT — PHASE TA PCKTAIEPCI2 ‘Doc. No: ID-PCK-GP1BP-2011005 Rov. : Status: C Date: 20/01/2010 | ToTaLespINDONesice | C a eee eee Cece) o Doc. Title: TRAYILADDER INSTALLATION PROCEDURE PL noeecs mre TOTAL Doc. Type PRC Discipline | NAP Page 5/27 6.3 CABLE TRAYS ARE INSTALLED IN VARIOUS POSITIONS = Horizontal fixation on walls, ~ Horizontal fixation on the cating, — Horizontal fixation on the ground, = Horizontal fixation on ground and ceiling, Vertical fixation against walls, = Vertical in the case of supporting cable ways followed by fixation on ground and ceiling. 64 — CABLE TRAYS ARE FITTED : = insoft materials by embedment, = In soft materials by expansion pins, — In hollow materials by toggle pins, — Imhard materials by sel-criling pins, —_ Inhard materials by percussion crilled hole and expansion pins, = In iron beams by driling and bolting, = Iniron beams by clamping, — Iniron beams by welding. ‘Tooling must be adapted (ilustrations 1, 2, 3) — embedment : mason tooling, trowels, = pins : driling machines, = eff driling pins, special machine on which the pin is mounted, the pin works like a bit, once the hole is made, an expansion cone is added to the pin, — welding (arc welding post, etc.), = bolting : proper spanners, ratchet wrench, flat spanners, tubular hexagon box spanner. ILLUSTRATION 4 SELF EXPANSION STUD MAINTAINING BOSS SOFT MATERTAL EXPANSION RING EXPANSLON CONE PECIKO FIELD DEVELOPMENT PROJECT PHASE TA Dos. No: D-POK-GPBP-2011005 PCK7AEPCI2 Rev. Status: € Date: 23/01/2010 “This document i the aropery of COMPANY. It must nt ba sere, fepreducod or dcloce to ether witht writen authorization from COMPANY TOTALESPINDONESIE | c zs Cegelec) | Doc. Title: TRAYILADDER INSTALLATION PROCEDURE ae TOTAL | doe. Type PRC Discipline NAP, Page 6/27 ILLUSTRATION 2 EMBEDMENT MELDING WS Tos Oo AUTOMATIC Hannes BERCUSSTON CORE EXPANSION ADAPTATION CONE RUPTUR ea past crxtse PECIKO FIELD DEVELOPMENT PROJECT PHASE 7A PCKTAIEPCI2 “This document i he property of COMPARY, It must aot be sores, eprocucad or disclose to ther witout wen eutterizton trom COMPANY oO : 1 TOTAL E&P INDONESIE Key | Cegelec) ~ Doc. Title: TRAY/LADDER INSTALLATION PROGEDURE. elaine TOTAL. | Doc. Type PRC Discipline NAP Page 7/27 65 CABLE TRAYS AND SUPPORTS MACHINING Equipment to be used - disc saw, — metel saw, — drill (to make adaptation parts), ~ puncher (if required), — shears. Eliminate all burrs after cutting (a burr may cause injuries to workmen hands or damage cables during pulling). Touch up paint with rust proof paint on cuts (example : Zinginox for galvanised parts), Do not use torch to galvanised parts. 66 INSTALLATION PREPARATION = survey locations, — position reference levels (using a sighting telescope), - check drawings (supplied by installation drafting office), mark the levels on the various points of the premises or galleries, — trace the various cable trays levels with a line, — place the two ends supports (e.g. in gallery), check supports plumb with a plumb line or level, = _ stretch lines between both of these supports (this allows an easier alignment for mounting the other supports), = fitthe cable trays checking the level PECIKO FELD DEVELOPMENT PROJECT ~ PHASE TA Doe, Nor ID PCK GPIBP-2011005 PCK7AIEPCI 2 Rev, 1G Status: C Date; Zarov2010 “This docuent i he propery of COMPANY, I must ast be sored, reprocucod or dielosed to oer without wr TOTAL E&P INDONESIE Co or Cegelec) Doc. Title: TRAY/LADDER INSTALLATION PROCEDURE mamma nrernues ToTau Doc. Type PRO Discipline NAP, Page 8/27 oO 6.7 CABLE TRAYS MACHINING AND MOUNTING ORGANISATION CHART ILLUSTRATION 4 Drawings checking Storage Levels tracing Check equipment stocks Supports tracing Levels plotting Fixations fitting Supports mounting [ Supports adjustment T SsSsaEasninsenes eessessemsoaasy Aligning level or vertical setting Cable trays machining Cable trays mounting 7 CABLE TH z 6 types should be remembere — ladder type cable trays, perforated slabs, — steel wire cable trays, = full slab cable trays with or without cover, = PVC cable trays, = telex (in steel or PVC). [serie ccaee ea PECIKO FIELD DEVELOPMENT PROJEGT — PHASE 7A Boe, PCKTAIEPCI2 Rev. Date. ‘This document i the propely of COMPANY. K must nt be Hore, reproduces oF sscloge Ls cher wihou! Wor 1O-PGK-GPIBP. 2071005 Status C 2310172010 writen autneraaion trom COMPANY TOTAL E&P INDONESIE C ao Cegelec) 2” | Doc. Title: TRAYILADDER INSTALLATION PROCEDURE, i oebaionisa TOTAL Doc. Type PRC Discipline NAP. Page 9/27 7.1 LADDER TYPE CABLE TRAYS : They are lade of 2 girders and cross-bars (riveted, welded or bolted). See flustrations 5 - 6. ILLUSTRATION 5 LINKED TOGETHER BY SPLICE PLATES ‘BECIKO FIELD DEVELOPMENT PROJECT - PHASE TA ‘Doc, No: ID-PCK-GP-BP-2071005 PCKTAIEPCI2 This documents the proserty of COMPANY. Kt must nl Be stored, ro TOTAL E&P INDONESIE ae I Cegelec) Doc, Title: TRAY/LADDER INSTALLATION PROCEDURE TOTAL | doe. Type | PRO Discipline NAP Page 10/27 ILLUSTRATION 7 ‘Straight splice plate Ate pe pte Sonia ste a, ILLUSTRATION 8 ‘The joining position should be away from the support The recommanded position is 1/5 to 1/10 of the distance between 77) supports Oo For one joint one head 2 splice-plate ~~ Te TREC 6 to1s PECIKO FIELD DEVELOPMENT PROJECT — PHASE 7A ‘Doe. Nor D-PCRGPLBP-2011005 POKTAEPCI2 Rev. : Status: C Date: 29/01/2010 “This eoeument i the peopety of COMPANY. Mt must no be sere, reproduces oF dsolosed to oer wiou! welen autherizaton from COMPANY TOTAL E&P INDONESIE ic a Cegelec) Doc. Title: TRAY/LADDER INSTALLATION PROCEDURE rocooterautnn TOTAL. | doc. Type PRC Discipline NAP Page 11/27 7.2 ORDINARY PERFORATED SLABS LINKED TOGETHER BY SPLICE PLATES PECIKO FIELD DEVELOPMENT PROJECT — PHASE TA Doe. No: ID-PCK-GP-1BP-2011005 PCK7AIEPCI2 Rev: C Status: © Dats; 2301/2010 “This ocument is he propery of COMPANY. I muBt no be store reproduced rd TOTAL E&P INDONESIE | 7 Cegeléc) Doc. Title: TRAVILADDER INSTALLATION PROCEDURE rma sinsnn TOTAL. | doc. Type PRE Discipline NAP Page 12/27 LUSTRATION 11 colnet ert aree 6 x 32 (bmn G GALVANIZED BOUT 73 FULL SLABS: ILLUSTRATION 12 GBR 0108/3 tus) GBR DIOB 7 : i i 1X 10 punching LINKED TOGETHER BY SPLICE PLATES PECIKO FIELD DEVELOPMENT PROJECT - PHASE TA ‘Boe: Nor D-POK-GPBP-207 1005 PCKTAIEPCI2 Rov. Status: C Date: 23/01/2010 “his document the property of COMPANY, I must fol be rout wetten ainalztien fram COMPANY TOTAL €&P INDONESIE cc on Cegelec) Doe. Title: TRAY/LADDER INSTALLATION PROCEDURE PvomoustnreN Tota | Doc. Type PRC Discipline NAP Page 13/27 ILLUSTRATION 13 Coupting away nem suppons Splice-ploes Gar 0107 Gar 0108 wee sx © GmmiS GALVANIZED- BOLT. 8 CABLE TRAYS CONNECTING PARTS They comprise = 90° elbows, = 135° elbows, — horizontal tee, — external vertical elbow, = Internal vertical elbow, = equal cross, = derivation. PECIKO FIELD DEVELOPMENT PROJECT PHASE TA PCKTAIEPCI2 “Tin dooumestis the propery of COMPANY. It must not Bs cored reprocuced Dac. Nor ID:PCK-GPABP-2011005 Rov. : Status: © Date: 20/00/2010 TOTAL TOTAL E&P INDONESIE Doc. Title: TRAYILADDER INSTALLATION PROCEDURE Doo. Type PRO Discipline NAP, 8.1 CONNECTION PARTS FOR LADDER TYPE CABLE TRAYS, 138" noua sow O OQ ILLUSTRATION 21, Orel 2 ECIKO FIELD DEVELOPMENT PROJECT - PHASE 7A PCKTAIEPCI2 ‘Dos, Nor DPC GPIBP 2011005 Rev. Date Doc. Title: TRAY/LADDER INSTALLATION PROCEDURE TOTAL E&P INDONESIE co D Cegelec) TOTAL Doc. Type PRC Discipline NAP Page 15/27 8.2 CONNECTION PARTS FOR PERFORATED SLABS ILLUSTRATION 22 ‘90° ronnie! ow ‘PECIKO FIELD DEVELOPMENT PROJECT ~ PHASETA ‘Dac, No: 1O-PCK-GPABP-2077005 PCKTAIEPC!2 Rev. : 6 Status: Date; 23/01/2010 “This dosurent is he property of COMPANY, H must nt be sored, reprocuce or ssclosed 1 ther without writen authorization fm COMPANY Doc. Title: TRAYILADDER INSTALLATION PROCEDURE acess TOTAL E&P INDONESIE | De mena cl | Toran | cec.tye | pr Lo Page 16/27 8.3 CONNECTION PARTS FOR FULL SLABS ILLUSTRATION 23 OO 20° snl bow 138 ton ato eo SS SS wn Oo ‘PECIKO FIELD DEVELOPENT PROJECT = PHASE 7A Doc, Wo: IPRGPIGP 201005 PORTAIEPGI? Ren. iG Status: C Date “his documents the prosely of COMPANY. M must nt be sore, reproduces oF eselesed ta cher Winou! wrt jovz010 ther zon trom COMPANY | TOTALESPINDONESIE | iC Doc. Title: TRAYILADDER INSTALLATION PROCEDURE msn TOTAL Doc. Type PRO |» Discipline NAP Page 17/27 9 CABLE TRAYS UNIT SUPPORTING This principle is identical for — ladder type cable trays, = steel wire cable trays, = slabs (perforated steel or ful), = PVCslabs. ILLUSTRATION 28 © PECIKO FIELD DEVELOPMENT PROJECT - PHASE 7A ‘Dos. Nor 1-PCK-GP-BP-2071005 2 Rev. PCKTAIEPCI Vv. iatust © Date: 23/01/2010 “This eocument the proper of COMPANY. M mus nt be sare, reproduces or sielaed to ther without writen autherzaton from COMPANY oO TOTAL E&P INDONESIE co QD Cegelec) Doc. Title: TRAY/LADDER INSTALLATION PROCEDURE Pivoratanarennas TOTAL | doe. Type | PRC Discipline NAP Page 18/27 i 10 Ys FIXING sv: ILLUSTRATION 29 ILLUSTRATION 30 Set up on supporting channet section Wot ong svc mounting On me wt ILLUSTRATION 31 (On stucturat steelwork ILLUSTRATION 32 ILLUSTRATION 33 Heats sections, | aS tna 0" an ‘PECIKO FIELD DEVELOPMENT PROJECT — PHASE 7A PCKTAIEPCI2 Rev. 23/01/2040 19 pepery of COMPANY. Ht must nat be stored, reprecuces oF eleioged La eter without writen autheriztln from COMPAHY TOTAL E&P INDONESIE Cegelec) Ss Doc. Title: TRAY/LADDER INSTALLATION PROCEDURE. romencuart i TOTAL Doc. Type | PRG Discipline NAP Page 19/27 1 BLE TRAYS VARI “INC {illustrations 34 - 35 - 36 - 37), ILLUSTRATION 34 ‘Sng norgg usp00 ILLUSTRATION 35, ‘PECIKO FIELD DEVELOPMENT PROJECT - PHASE TA PCKTAIEPCI2 ‘Dac, Nor ID-PCK-GPIBP-2077005 | TOTAL €&P INDONESIE Doc. Title: TRAYILADDER INSTALLATION PROCEDURE Cegeléc) TOTAL Doc. Type [| eerie | ww | Pazera 12 SUSPENDED CABLE TRAYS FIXATION ILLUSTRATION 38 Wosee yen ssbensen conante sent ‘Sento suc MOUNTING ON STRUCTURAL TRON WITH CLAM “Simple usset EDF bracket <2_EDF_" suspended gable ladder Folding” Cccansien ong if “mount ing ZF bricket Bolts TRCC 6 X17 mounting channe! flows Bolte HEEL sosnting chan Sane | fist o 107 omega mounting Metal or threa: Jed PECIKO FIELD DEVELOPMENT PROJECT PHASE TA Dos. No: 10-PCK-GPABP-2071005 PCKTAVEPCIZ Rov. iC Status: © Dato: 25/01/2010 TOTAL E&P INDONESIE Cegeléc) Doc. Title: TRAY/LADDER INSTALLATION PROCEDURE resmoroussnarences TOTAL | dee. type Pec Discipline nap Page 21/27 13, CABLE TRAYS ASSEMBLY ACCESSORIES ILLUSTRATION 39 pins tor acxat mounting chonnats Gx Loader camps (xn plated) O get aut oe nee SS 5 7 X 13 collar eee “M6 9 X 15 collar ILLUSTRATION 40 Cables note meaning on EDF rocker mounting chonnet } pean ve - 20X15 punchiny B_thpunching ECING FIELD DEVELOPMENT PROJECT ~ PHASE TA Does TO PCR GPP ATTOOS PKTAIEPCI2 Rev i, Sutus © Dats: 29/01/2010 ter without wien authorization fram COMPANY ‘This documents te property of COMPANY. I! mast at be sore, repreduone oracles TOTAL E&P INDONESIE = Cegelec) — Doe. Title: TRAY/LADDER INSTALLATION PROCEDURE Pacomasunane TOTAL | Doc. Type | PRC Discipline | Nap | Page 22/27 14 CABLE TRAYS ASSEMBLY BOLTING. (illustrations 41 - 42 - 43), ILLUSTRATION 41, ILLUSTRATION 42 Bott, nut ong wosner Hexogonot neaces bol! nut ona washer pm fi wm i Hexogona! headed screwand washer ‘Sone founa-neod boll. ut and wasnet (Gas jG ILLUSTRATION 43 CO ‘Spring ut for standard supporting channel sation urs M2 fox supporting ehannl section zoe For special profile PECIKO FIELD DEVELOPMENT PROJECT ~ PHASE 7A ‘Dos. Nor 1D-PCK-GPABP-207 1005 PCK7AIEPCI2 Rev. : Status: C Dato: 29/01/2010 “Tie document i he property of COMPANY, I mus abt De stores rproguced a deleted to other without writen autheratio from COMPANY Co , TOTAL E&P INDONESIE C D Cegelec) Doc. Title: TRAY/LADDER INSTALLATION PROCEDURE. rsmeuesirn, TOTAL | doe. Type PRC Discipline NAP Page 23/27 15 LARGE CAPACITY SUSPENDED CABLE TRAYS ILLUSTRATION 44 Svatioay for Sentral cir PECIKO FIELD DEVELOPMENT PROJECT - PHASE TA Doe. No: 1D-PCK-GPABP-207 1005 POKTAEPCI2 Rov. :C Status: © Dato: 23/01/2010 “This eosument Is he propery of COMPANY. It must nat 2 sored, reproduced o closed to olher witht wren authorization fom COMPANY TOTAL E&P INDONESIE co Cegelec) Doc. Title: TRAYILADDER INSTALLATION PROCEDURE nme in TOTaA Doc, Type PRO Discipline NAP Page 24/27 16 CABLE TRAYS IN CHANNEL ILLUSTRATION 45, Reveseo cade ooo li oe BonOm oF enc aows Me cables 1 be ie no kept Gut ot wae ‘PECIKO FIELD DEVELOPMENT PROJECT - PHASE TA Boe, No: ID-PCKGPIBP-2OT 1005 PCKTAIEPCI2 Rev. :C Status: © Date: 23/01/2010 ‘nis document athe prorerty of COMPANY, It mut nt be stord, reproduce o 1 6 othor without writen auorzntion from COMPANY TOTAL E&P INDONESIE S Cegeléc) Doc. Title: TRAYILADDER INSTALLATION PROCEDURE mecwana TOTAL | boc. Type | PRC Discipline NAP Page 25/27 17 INSTALLATION OF VERTICAL CABLE TRAYS 17.1 OPEN CROSSING (LADDER TYPE CABLE TRAYS) ILLUSTRATION 48 irene Noo s0008 1: open cessing -arongerent of epan eesting : minimum Noor 0008 I i Ladder width 100 om ‘sept geeteratea aaaee || Section rung oF length + 100 / 41) £ ee BE - | BY a - tall ae & = 11 or to be defined according to ‘the type and manufacturer of the selected fixation. 17.2 TRANSFER FROM HORIZONTAL TO VERTICAL LADDER ILLUSTRATION 49 SPLICE PLATS PECIKO FIELD DEVELOPMENT PROJECT PHASE TA Doe. No: 1D-PCK-GP1BP-207 1005 PCKZAIEPCI2 Rev. :C Status: C Date: 25/0v2010 ‘uthriaton from COMPANY “This eoeument i he propery of COMPANY. It must not be store, TOTAL E&P INDONESIE Cegeléc) Doo, Title: TRAY/LADDER INSTALLATION PROCEDURE. TOTAL. | doe. Type PRe Discipline NAP Page 26/27 17.3 INSTALLATION IN RISER (¢.g. wall ited ladder type cable trays) oS) 4 x yanchi | ee = passer oO 2B 2 SPACING POSSIBILITIES BETWEEN WALL AND CABLE LADDER Fixing bracket Fixing bracket = WC meee Tm 8 a ume WALL Wm sorb fot reo eveloced ronges of colar About_2 m between 2 Fixing bracket s Mounting parpondicutr to me wat with a 30x3 flat RY with a SSS a0x3 fat with U 35x1042 With uy 35e1at2 Le) it ECIKO HELD DEVELOPMENT PROJECT - PHASE TA Dios No: D-PCK-GP. PCKTAIEPCI2 Rov. :G Stat Date: 2a/ow2010 ‘Tris document Is the property of COMPANY. it must not He slored, reproduced or eucloved to other without wit suterzation from COMPANY TOTALESPINDONESIE | c aon Fe eee a ceecer errr reer COGtec ay Doc. Title: TRAYILADDER INSTALLATION PROCEDURE rivewavesooeinas | Tota Doc. Type | PRG Discipline NAP Page 27/27 18 CABLE TRAYS WITH COVER ILLUSTRATION 51. Covet on vere ry kha ILLUSTRATION 51 (cont'd) Covet or coanacng pie stor fing covers ona peso aight Range Eble oye mee i ‘same see PECIKO FIELD DEVELOPMENT PROJECT PHASE TA ‘Dos. No: ID-POK-GPABP-201 1005 PCKTAIEPCI2 Rev. :C Status: C Date: 2a/042010 Tos documeat isthe property of COMPANY. It est nol be stored, reproduce or snefosed 1oothor without wren autnrizaion fare COMPANY

Вам также может понравиться