Вы находитесь на странице: 1из 3

X | KNIT EZ DIAMOND LATTICE BLANKET | CRAFT

CRAFT I SKILL LEVEL : EXPERIENCED

MEASUREMENTS left). Pull next loop from working


Approximately 56" [142 cm] wide yarn up from behind through next
x 60" [152.5 cm] long. loop. Pull next loop from working
yarn up from behind through
INSTRUCTIONS next loop. (Pull next loop from
Notes: working yarn up through next
• Right side of project is facing loop of foundation row) twice.
at all times. Repeat from * to end of row. Do
• ‘Working yarn’ is held behind not turn work. 68 stitches in row.
stitches throughout work. 2nd row: Working from left
to right, pull next loop from
Count 68 loops for foundation working yarn up from behind
row. through last stitch worked on
1st row: Working from right previous row. *Cross 2nd stitch
to left, pull the 69th loop (from over next stitch (to the left). Pull
‘working yarn’) up through 68th loop from working yarn up from
loop (last loop of foundation behind through 2nd stitch. Pull
MATERIALS row) from behind to create a knit next loop from working yarn up
stitch.
X® X™ (X oz/X g; X yds/X m) from behind 1st stitch. (Pull next
MATERIALS Pull next loop from working
Color (00000) X ball(s) loop from working yarn up from
yarn up through next loop of
Bernat® Alize® Blanket-EZ™ (6.4 oz/180 g; 18 yds/16 m) behind next loop) twice. Cross
Size U.S. X/X (X mm) crochet hook or size needed to obtain gauge. foundation row. *Cross second
Country Blue (37018) 7 balls next stitch in front of 2nd stitch
loop of foundation row in front (to the right). Pull next loop from
of first loop of foundation row working yarn up from behind
(to the right). Pull next loop from
ABBREVIATIONS 1st stitch. Pull next loop from
working yarn up from behind working yarn up from behind 2nd
next loop. Pull next loop from stitch. Rep from * to last stitch.
Learn to use Bernat® Alize® Blanket-EZ. Watch the EZ Diamond Lattice working yarn up from behind Pull loop from working yarn up
Blanket Tutorial. next loop. Cross next loop of from behind next loop. Do not
foundation row in front of 2nd turn.
loop of foundation row (to the

SKU #
BRN0502-011888M EZ DIAMOND LATTICE BLANKET X| CRAFT
| KNIT 1 of X
3
X | KNIT EZ DIAMOND LATTICE BLANKET | CRAFT

3rd row: Working from right to from behind 1st loop. (Pull next three times. *Cross 2nd stitch from behind 1st stitch. (Pull next
left, cross 2nd stitch of previous loop from working yarn up from in front of 1st stitch (to the left). loop from working yarn up from
row over 1st stitch (to the right). behind next loop) twice. Cross Pull next loop from working yarn behind next loop) twice. Rep
Pull loop from working yarn 2nd stitch in front of next stitch up from behind 2nd stitch. Pull from * to end of row. Do not turn.
up from behind 2nd stitch. Pull (to the left). Pull next loop from next loop from working yarn 8th row: Working from left
next loop from working yarn working yarn up from behind 2nd up from behind 1st stitch. (Pull to right, pull next loop from
up from behind 1st stitch. *(Pull loop, Pull next loop from working next loop from working yarn working yarn up from behind
next loop from working yarn up yarn up from behind 1st loop. up from behind next loop) over through last stitch worked on
from behind next loop) over next Rep from * to last stitch. Pull next next 4 stitches. Rep from * to previous row. *Cross 2nd stitch
4 stitches. Cross 2nd stitch in loop from working yarn up from last 5 stitches. Cross 2nd stitch in front of next stitch (to the left).
front of next stitch (to the right). behind next stitch. Do not turn. in front of 1st stitch (to the left). Pull next loop from working yarn
Pull next loop from working yarn 5th row: Working from right to Pull next loop from working yarn up from behind 2nd stitch. Pull
up from behind 2nd stitch. Pull left, (pull next loop from working up from behind 2nd stitch. Pull next loop from working yarn up
next loop from working yarn up yarn up from behind last stitch next loop from working yarn up from behind 1st stitch. (Pull next
from behind 1st stitch. Rep from worked on previous row) twice. from behind 1st stitch. (pull next loop from working yarn up from
* to last 6 stitches. *(Pull next *Cross next stitch in front of loop from working yarn up from behind next loop) twice. Cross
loop from working yarn up from 2nd stitch (to the left). Pull next behind last stitch worked on next stitch in front of 2nd stitch
behind next loop) over next 4 loop from working yarn up from previous row) three times. Do not (to the right). Pull next loop from
stitches. Cross next stitch in front behind 2nd stitch. Pull next turn. working yarn up from behind 2nd
ofMATERIALS
2nd stitch (to the left). Pull loop from working yarn up from 7th row: Working from right to loop. Pull next loop from working
next
X® X™loop fromg;working
(X oz/X X yds/X yarn
m) up behind 1st stitch. Cross 2nd stitch left, (pull next loop from working yarn up from behind 1st loop.
from
Colorbehind
(00000) 2nd loop. Pull next in frontX of next stitch (to the right).
ball(s) yarn up from behind last stitch Rep from * to last stitch. Pull next
loop from working yarn up from Pull next loop from working yarn worked on previous row) twice. loop from working yarn up from
Size U.S.
behind 1stX/X (X mm)
loop. Do not turn. hook orup
crochet size needed
from to obtain
behind gauge.
2nd stitch. Pull *Cross 2nd stitch in front of next behind next loop. Do not turn.
4th row: Working from left next loop from working yarn up stitch (to the right). Pull next 9th row: Working from right to
to right, pull next loop from from behind 1st stitch. (Pull next loop from working yarn up from left, cross 1st stitch over 2nd stitch
working yarn up from behind
ABBREVIATIONS loop from working yarn up from behind 2nd stitch. Pull next (to the left). Pull next loop from
through last stitch worked on behind next loop) twice. Rep loop from working yarn up from working yarn up from behind 2nd
previous row. *Cross next stitch in from * to end of row. Do not turn. behind 1st stitch. Cross next stitch loop. *Pull next loop from working
front of 2nd stitch (to the right). 6th row: Working from left in front of 2nd stitch (to the left). yarn up from behind 1st loop.
Pull next loop from working yarn to right, (pull next loop from Pull next loop from working yarn (Pull next loop from working yarn
up from behind 2nd loop. Pull working yarn up from behind last up from behind 2nd stitch. Pull up from behind next loop) over
next loop from working yarn up stitch worked on previous row) next loop from working yarn up next 4 stitches. Cross 2nd stitch in

SKU #
BRN0502-011888M EZ DIAMOND LATTICE BLANKET X| CRAFT
| KNIT 12 of X
3
X | KNIT EZ DIAMOND LATTICE BLANKET | CRAFT

front of next stitch (to the right). from behind 2nd loop. Pull next
Pull next loop from working yarn loop from working yarn up from
up from behind 2nd stitch. Pull behind 1st loop. Rep from * to last
next loop from working yarn 5 stitches. (Pull next loop from
up from behind 1st stitch. Rep working yarn up from behind
from * to last 6 stitches. (Pull next loop) twice. Cross next stitch
next loop from working yarn up in front of 2nd stitch (to the left).
from behind next loop) over next Pull next loop from working yarn
4 stitches. Cross 2nd stitch in front up from behind 2nd stitch. Pull
of next stitch (to the right). Pull next loop from working yarn up
next loop from working yarn up from behind 1st stitch. Pull next
from behind 2nd stitch. Pull next loop from working yarn up from
loop from working yarn up from behind last stitch. Do not turn.
behind 1st stitch. Do not turn.
10th row: Working from left to Repeat 5th to 10th rows for
right, pull next loop from working pattern. Work in pattern until
yarn up from behind last stitch Blanket measures approximately
worked on previous row. Cross 60" [152.5 cm], ending on a 5th
next stitch in front of 2nd stitch row.
(to the right). Pull next loop from
MATERIALS
working
X® X™ (X yarn upX yds/X
oz/X g; from m)behind Bind off row: Working in same
2nd
Colorstitch. Pull next loop from
(00000) direction as last row, pull 2nd
X ball(s)
working yarn up from behind stitch through 1st stitch. Pull 3rd
Sizestitch.
1st U.S. X/X (X mm)
*(Pull nextcrochet
loop fromhook orstitch
size needed
throughto 2nd
obtain gauge.
stitch. Pull
working yarn up from behind 4th stitch through 3rd stitch.
next loop) twice. Cross 2nd stitch Continue in this manner to end
over next
ABBREVIATIONSstitch (to the left). Pull of row. Cut thread at base of loop
next loop from working yarn up (thread used to create the loop)
from behind 2nd stitch. Pull next to create a yarn ‘tail’. Tie to secure
loop from working yarn up from and weave in end.
behind 1st stitch. Cross next stitch
over 2nd stitch (to the right). Pull
next loop from working yarn up

SKU #
BRN0502-011888M EZ DIAMOND LATTICE BLANKET X| CRAFT
| KNIT 13 of X
3

Вам также может понравиться